Albert Bridge - Preparing for the Thames Diamond Jubilee Pageant

17 May 2012

In preparation for the Diamond Jubilee Pageant the Albert Bridge, which will be a key vantage point on the day, will be shut on Saturday 19 May between 7am and 8pm. Diversion routes using Battersea and Chelsea Bridges will be in place.

The disruption will be kept to a minimum and the bridge reopened as soon as possible.