1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
4)
Dormer windows
The cheeks of the dormer windows shall be clad in lead and be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Local Plan 2019.
5)
Conservation rooflights
The rooflight(s) shall be of a traditional conservation type, flush with the roof and slim framed, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
6)
Sash windows and doors in painted timber
External windows and doors hereby permitted shall be timber framed and painted, with the windows being double hung, white painted, sliding sashes, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
7)
Roof Terrace - Black painted railings
The railings to the roof terrace shall be painted black, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL6 of the of the Local Plan 2019.
8)
Noise from building services plant and vents
Noise emitted by all building services plant and vents shall not exceed a level 10dBA below the existing lowest LA90(15min) background noise level at any time when the plant is operating, and where the source is tonal it shall not exceed a level 15dBA below. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential premises or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The plant shall be serviced regularly in accordance with the manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is determined by the local planning authority to be failing to comply with this condition, it shall be switched off upon written instruction from the local planning authority and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
9)
Compliance with Condition 8 (Noise from building services plant and vents)
The noise mitigation measures as specified in the Environmental Noise Assessment (prepared by Acoustics Plus Limited, dated 15th February 2024 Ref: 104569) shall be adopted and implemented in full compliance with condition 8.
Reason - To comply with condition 8 on the interest of preventing any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
10)
Anti-vibration mounts for air-conditioning/ extraction equipment
The plant shall not operate unless it is supported on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
11)
Pedestrian lift plant and equipment
All plant and equipment associated with the pedestrian lift shall be acoustically attenuated and supported on adequate proprietary anti-vibration mounts, as necessary, to prevent the structural transmission of noise and vibration within adjacent or adjoining premises, and these shall be so maintained thereafter. If at any time the operation of the passenger and/or vehicle lifts are unable to comply with this condition, the lift(s) shall be switched off and not used again it/they are able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
12)
Code of Construction Practice
No development shall commence until:
An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then
B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record.
The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.