1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
Except for that which is required by Condition No. 5, the development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
4)
Code of Construction Practice
No development shall commence until:
An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then
B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record.
The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.
5)
Submission of details
Notwithstanding any details shown on drawings hereby permitted and as listed within Condition No. 2, detailed drawings or samples of materials as appropriate, in respect of the following, shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun, and the works shall not be carried out other than in accordance with the details so approved and shall thereafter be so maintained:
a) Elevation (1:10) and section (1:5) drawings of new external doors and external architraves with details of mouldings in section (1:1) and a plan showing locations of retained / historic doors and new doors. New doors shall be made of solid timber and hand painted;
(b) Elevation (1:10) and section (1:5) drawings of new windows with details of mouldings in section (1:1);
(c) Elevation (1:10) drawings of new louvred screen, including details of material;
(d) Sample of timber weather boarding to match weather boarding on no. 164;
(e) Details of all existing and all new external service runs [ie: plumbing / drainage / hot and cold water / air con pipework / heating pipework / extraction etc] including details of any associated external alterations to fabric including alterations to joists, walling, external outlets, etc.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
6)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
7)
Works to match - Sample panels required
Sample panels of facing brickwork showing the proposed colour, texture, facebond and pointing shall be provided on site, and approved in writing by the local planning authority before the relevant parts of the approved works are commenced, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
8)
Pipework
No plumbing or pipes other than rainwater pipes shall be fixed on the external faces of the building other than those shown on the drawings forming part of this consent.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
9)
Pointing, re-pointing, and jointing
The mortar mix shall match the original construction mortar of the building with regard to the grading of the aggregate, finish, and colour. The mortar must be lime based (NHL as per EN459) with no cement content. The pointing profile shall match the original profile on the building.
If the original pointing no longer exists, details of the re-pointing profile should be submitted to and approved in writing by the local planning authority before any such re-pointing takes place.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
10)
Brick bond
The brickwork bond shall match the original bond on the building.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.