Property details

Case reference: PP/16/04044
Address: 1 Hasker Street, LONDON, SW3 2LE
Ward: Brompton and Hans Town
Polling district: 02
Listed Building Grade: N/A
Conservation area: Chelsea

Applicant details

Applicant's name: Lloyd-Baker
Applicant company name: Montagu Evans
Contact address: 5 Bolton Street London W1J 8BA

Proposal details

Application type: PP (Planning permission)
Proposed development Replacement of mansard roof; demolition of lower ground floor infill extension and erection of infill extension; construction of basement accommodation with garden lightwell and rooflight; erection of extension on closet wing at first floor level
Date received: 24 Jun 2016
Registration date:
(Statutory start date)
01 Jul 2016
Public consultation ends: 29 Jul 2016
Application status: Decided
Target date for decision: 26 Aug 2016

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 26 Sep 2016
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Construction Traffic Management Plan (CTMP) No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority.ÿ The statement should include: a)ÿ routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b)ÿ access arrangements to the site; c)ÿ the estimated number and type of vehicles per day/week; d)ÿ details of any vehicle holding area; e)ÿ details of the vehicle call up procedure; f)ÿÿ estimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development; h)ÿ work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development; i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway; j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that "No development shall commence until" as

4)

Professional management of engineering works No development shall commence until a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed to supervise the construction works throughout their duration and their appointment confirmed in writing to the Local Planning Authority. In the event that the appointed engineer ceases to perform that role for whatever reason before the construction works are completed those works will cease until a replacement chartered engineer of the afore-described qualification has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer is at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

5)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

6)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preservethe appearance of the building and the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Consolidated Local Plan.

7)

Sash windows and doors in painted timber External windows and doors hereby permitted shall be timber framed and painted, with the windows being double hung, white painted, sliding sashes, and so maintained.
Reason - To preserve the appearance of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Consolidated Local Plan.

8)

Roof Terrace and metal grille - Black painted metal The railings to the roof terrace at ground floor level and the grille to the rear lightwell within the rear garden shall be painted black metal, and so maintained.
Reason - To preserve of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL6 of the Consolidated Local Plan.

9)

Roof Material - Natural slates The roof slope(s) of the building(s)/extension hereby permitted shall be clad in natural slates, and so maintained.
Reason - To preserve the appearance of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Consolidated Local Plan.

10)

Dormer windows The cheeks of the dormer windows shall be clad in lead and be so maintained.
Reason - To preserve the appearance of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Consolidated Local Plan.

11)

Submission of details (Full PP) No development shall commence until full particulars of the following have been submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved: a) The provision of Sustainable Drainage Systems to address surface water run-off and to provide betterment, including details of the location of the SuDS, their attenuation capacity, structural integrity, construction, operation, and maintenance.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

12)

Trees and landscaping - Details required No development shall commence until a scheme of landscaping, to include all existing trees and shrubs and proposed replacement trees, shrubs and paths and their surfacing materials, has been submitted to and approved in writing by the local planning authority, and the development shall only be carried out and maintained in accordance with the details so approved.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. ÿIt is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Borough Development.

4)

Construction Management - Highways Act
You are reminded that, if not properly managed, construction works can lead to significant negative impacts on the local environment, reducing residential amenity and the safe function of the highway. No vehicles associated with the building operations on the development site shall be parked on the public highway so as to cause an obstruction. Any such wilful obstruction is an offence under Section 137 of the Highways Act 1980. The Council can prosecute developers and their contractors if work is not managed properly. For advice on how to manage construction works in the Royal Borough please see Advice for Builders on the Council's website; from this page you will also find guidance on what to include in Construction Traffic Management Plans (where these are required) which are very valuable instruments in limiting the impact of large scale building work.

5)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:20 Sep 2016
Report item number:S83

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Katie Hurrell
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012