1)
Time limit
The works hereby granted shall be begun before the expiration of three years from the date of this consent.
Reason - As required by Section 18 of the Planning (Listed Buildings and Conservation Areas Act) 1990, to avoid the accumulation of consents.
2)
Submission of details
Should flashings be installed across the rear facade of the orginal building, a detailed section drawing (scale 1:5) shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun, and the works shall not be carried out other than in accordance with the details so approved and shall thereafter be so maintained:
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
3)
No works to take place other than to third floor ceiling and roofs
Listed building consent is hereby granted only for alterations to the internal ceiling at third floor level and alterations to the roof finishes at second floor level and main roof level. All other works and alterations depicted on the submitted drawings do not form part of this consent, and shall not be carried out under this consent.
Reason - To preserve the heritage significance of this listed building in accordance with policies of the development plan in particular policies CL1, CL2, CL4 of the Consolidated Local Plan
4)
Work to match retained fabric
All new works and works of making good to the retained fabric, whether internal or external, shall be finished to match the adjacent work with regard to the methods used and to colour, material, texture, and profile.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
5)
Retention of fabric
All existing fabric including existing wall, roof and ceiling plasterwork shall be retained, unless notated otherwise on the drawings approved under this consent.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
6)
Works to match - Sample panel
The relevant works shall be completed in accordance with the slate sample panel so approved.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.