!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/23/06870
Address: 11 Queensdale Road, LONDON, W11 4QF
Ward: Norland
Polling district: 11
Listed Building Grade: N/A
Conservation area: Norland

Applicant details

Applicant's name: c/o Maddox Planning
Applicant company name: Maddox Planning
Contact address: 33 Broadwick Street London W1F 0DQ

Proposal details

Application type: PP (Planning permission)
Proposed development Variations of Condition 2 (compliance with approved drawings) of planning permission ref. PP/22/06552 granted 19th January 2023 for alteration of rear dormer roof from flat to pitched roof and increase width of 300mm; increase rear dormer window width.
Date received: 20 Oct 2023
Registration date:
(Statutory start date)
20 Oct 2023
Public consultation ends: 17 Nov 2023
Application status: Decided
Target date for decision: 15 Dec 2023

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 15 Dec 2023
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from 19/January/2023, being the date of the original permission granted under ref. PP/22/06552.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings Except for that which is required as part of Conditions Nos. 6, 7 and 8, the development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.

4)

Sash windows and doors in painted timber External windows and doors hereby permitted shall be timber framed and painted, with the windows being double hung, white painted, sliding sashes, and so maintained.
Reason - To preserve the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.

5)

Dormer windows The cheeks of the dormer windows shall be clad in lead and be so maintained.
Reason - To preserve the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Local Plan 2019.

6)

Code of Construction Practice Notwithstanding condition 2, the development hereby approved shall not be undertaken except in accordance with the details, which were approved by the Council's Construction Management Team on the 16th May 2023.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

7)

Trellis to terrace to be in place prior to use of enlarged terrace commences Notwithstanding any details shown on drawings hereby approved and as listed within condition No. 2, the use of the enlarged first floor level rear roof terrace shall not commence until the side trellising has been installed at the site and the trellising shall be so maintained.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

8)

Construction Traffic Management Plan (CTMP) Notwithstanding condition 2, the development hereby approved shall not be undertaken except in accordance with the CTMP details which were approved under application ref. CON/23/00948 on 06th April 2023.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Local Plan 2019.ÿ

9)

Considerate Constructors Scheme (CCS) For the duration of building works hereby approved the lead contractor, or the site, shall is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Local Plan 2019.

Informatives:

1)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

2)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

3)

Conditions - Precedent to Commencement
Conditions no(s) 6 and 8 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

4)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

5)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

6)

Unique text
CLI2: Informative - General contaminated land for buildings The responsibility to properly address contaminated land issues, including safe development and secure occupancy, and irrespective of any involvement by the Royal Borough, lies with the owner/developer of the site.ÿ No contaminated land condition is recommended for this planning application as the chance of significant contamination being found with the potential to cause harm is considered to be low. ÿDespite this the owner or developer of the property may wish to consider contaminated land issues further before development work starts. Based on this information, observations made during groundworks or as a precaution, the developer should consider whether measures should be taken to investigate or address possible contamination issues.ÿ This may, for example, involve undertaking a more detailed unexploded ordnance assessment, undertaking historical searches or investigation work or providing enhanced ground gas and vapour protection.ÿ The applicant/developer is requested to contact the Council's Contaminated Land Officer (Pollution Regulatory Team) (Tel: 020 7361 3002 email: [email protected]) as soon as is practicable should contamination be encountered during the development of the site. Contamination will often be evident either visually or from odours. Visual evidence of contamination may include staining by oil/fuel, coloured liquids/soils uncharacteristic of soil or groundwater, or debris (e.g. asbestos) being present. Odours will usually be obvious and smell of fuels/solvents, be pleasant or unpleasant, or otherwise be uncharacteristic of soil or groundwater. Where land contamination is found during the course of the development, we would recommend that an appropriate level of desk study research and investigation work is undertaken to identify and assess risks from land contamination. Guidance on land contamination planning issues is available from the Council's website.ÿÿ It is the responsibility of the developer to ensure that they comply with the requirements of Contaminated Land, Health & Safety, Waste Management, the Control of Asbestos and Environmental Damage Regulations.

7)

Highways Technical Approval-Sep Approval
Technical Approval in accordance with the Design Manual for Roads and Bridges BD2/12 will be required for any structural works/alterations/repairs to structures over, under or adjacent to the public highway. The procedures only grant approval under the Highways Act. The granting of planning permission and building consent does not imply that such approval is given. Please contact the Directorate of Transportation and Highways for advice on 02073415220 or emailÿ[email protected]

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Ronaldo Colalillo
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/06870