Property details

Case reference: PP/19/05900
Address: 24 Royal Crescent, LONDON, W11 4SN
Ward: Norland
Polling district: 11
Listed Building Grade: 2*
Conservation area: Norland

Applicant details

Applicant's name: Stadlen
Applicant company name: William Smalley RIBA
Contact address: The Dairy 40 Emerald Street London WC1N 3QH

Proposal details

Application type: PP (Planning permission)
Proposed development External and internal alterations following water leak
Date received: 21 Aug 2019
Registration date:
(Statutory start date)
02 Sep 2019
Public consultation ends: 04 Oct 2019
Application status: Decided
Target date for decision: 28 Oct 2019

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 10 Mar 2020
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.

Informatives:

1)

Unique text
You are reminded of the list of conditions attached to listed building consent LB/19/0591, that need to be complied with in accordance with their relevant time limits to safeguard the special interest of this grade II* listed building.

2)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

GTD/No pre-app/Amendmts to comply Est. G
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered, although not used in this instance. On first submission the proposals did not comply with guidance, but improvements suggested by the planning authority were adopted by the applicant.

5)

Category 3 development
This development has been categorised as Category 3 for the purposes of the Council's Code of Construction Practice, so does not require a condition securing a Checklist or Site Construction Management Plan (SCMP). You are reminded that the Code still applies to building works at the site with regard to working hours and other site practices, and you are advised to review the Code to be aware of its objectives https://www.rbkc.gov.uk/environment/code-construction-practice

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Jourdan Alexander
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/19/05900