1)
Time limit
The works hereby granted shall be completed within 3 calender months from the date of this consent.
Reason - As required by Section 18 of the Planning (Listed Buildings and Conservation Areas Act) 1990, to avoid the accumulation of consents and to rectify the unauthorised works that have been carried out.
2)
Notification of start of works
No works shall commence under this listed building consent before written notification of the intended start of works has been provided to the local planning authority [Town Hall, Hornton Street, London W8 7NX] with such notification providing not less than 14 days notice prior to the commencement of works. For the period of 14 days before works commence, access shall be enabled to the building, on request from the local planning authority, to allow photographs and/or measured drawings to be undertaken.
Reason - In order that the local planning authority may be given the opportunity of monitoring the progress of works on site to ensure there is no harm to the special architectural or historic interest and heritage significance of the building. You should expect that a Council Officer may arrive to inspect the works at any time to ensure that the extent of works permitted by the listed building consent is not being exceeded.
3)
Submission of details
Detailed drawings or samples of materials as appropriate, in respect of the following, shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun, and the works shall not be carried out other than in accordance with the details so approved and shall thereafter be so maintained:
(a) New fireplace
(b) New doors, including a cross section, at a scale of 1:10
(c) New dormer and windows, including a cross section, at a scale of 1:20
(d) New front basement window, including a cross section, at a scale of 1:20
(e) Sample of film for internal applicatioj to glass of roof lantern
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
4)
Work to match retained fabric
All new works and works of making good to the retained fabric, whether internal or external, shall be finished to match the adjacent work with regard to the methods used and to colour, material, texture, and profile.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
5)
Retention of fabric
All existing fabric including existing wall and ceiling plasterwork shall be retained, unless notated otherwise on the drawings approved under this consent.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
6)
Windows and external doors - Painted timber
All windows, doors and framing hereby granted consent shall be of white painted timber and windows shall be single glazed with a bevelled putty finish and no trickle vents, and be so maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.