Property details

Case reference: PP/16/08497
Address: 26 Redcliffe Gardens, LONDON, SW10 9HA
Ward: Redcliffe
Polling district: 15
Listed Building Grade: N/A
Conservation area: Boltons

Applicant details

Applicant's name: Watson
Applicant company name: AU Architects
Contact address: Chester House Fulham Green 81-83 Fulham High Street SW6 3JA

Proposal details

Application type: PP (Planning permission)
Proposed development Internal refurbishment works and creation of basement to a single dwelling house to create six apartments.
Date received: 19 Dec 2016
Registration date:
(Statutory start date)
20 Dec 2016
Public consultation ends: 27 Jan 2017
Application status: Decided
Target date for decision: 14 Feb 2017

Decision details

This case has not yet been decided.

Decision: Permission granted, SUBJECT to S.106 ag.
Decision date: 09 May 2017
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Submission of details (Full PP) No development shall commence until full particulars of the following have been submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved: (a) Cycle parking and storage.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and to ensure adequate cycle parking is provided in accordance with Consolidated Local Plan policy CT1(f). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

4)

Protection of trees during construction - Details required No development shall commence until full particulars of the method(s) by which all existing trees on the site and adjacent land are to be protected during site preparation, demolition, construction, landscaping, and other operations on the site including erection of hoardings, site cabins, or other temporary structures, shall be submitted to and approved in writing by the local planning authority and the development shall be carried out only in accordance with the details so approved.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

5)

Construction Traffic Management Plan (CTMP) No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority.ÿ The statement should include: a)ÿ routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b)ÿ access arrangements to the site; c)ÿ the estimated number and type of vehicles per day/week; d)ÿ details of any vehicle holding area; e)ÿ details of the vehicle call up procedure; f)ÿÿ estimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development; h)ÿ work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development; i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway; j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that "No development shall commence until" as

6)

Professional management of engineering works No development shall commence until a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed to supervise the construction works throughout their duration and their appointment confirmed in writing to the Local Planning Authority. In the event that the appointed engineer ceases to perform that role for whatever reason before the construction works are completed those works will cease until a replacement chartered engineer of the afore-described qualification has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer is at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

7)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

8)

Accessibility The units hereby approved and as shown on approved drawings shall achieve compliance with optional requirement M4(2) of the building regulations and the units shall not be occupied until Building Regulations approval has been issued certifying that these criteria have been achieved.
Reason - To ensure satisfactory provision for people with disabilities and meet the changing needs of households in accordance with development plan policies in particular policy CH2 of the Consolidated Local Plan.

9)

Enhanced Sound Insulation No development shall commence until details of an enhanced sound insulation value DnT,w of at least 5dB above the Building Regulations value, for the floor/ceiling structures separating different types of rooms/ uses in adjoining dwellings, namely living rooms above bedrooms of separate dwelling shall be submitted to and approved in writing by the local planning authority. The approved details shall be implemented prior to occupation of the development and thereafter be permanently retained.
Reason - To accord with the development plan by ensuring that the living conditions for future occupiers of the proposed units and of those living near the development are suitably protected. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Borough Development.

4)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2000 (as amended), and the grant of planning permission does not imply that such approval will be given. The Director of Building Control, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

5)

Party Wall Act 1996
You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining property freeholders and leaseholders and anyone who has had an interest of 12 months or greater, where the building owner intends to carry out work which involves: Work involving an existing shared wall with another property; Building on the boundary with another property; Excavating near a neighbouring building, and that work falls within the scope of the Act Notice should be served on neighbours at least one month before commencement of building works. Section 12(1) of the Act provides for the developer to provide security for neighbours through insurance or a security bond. Procedures under this Act are separate from the need for planning permission and for building regulations approval. Further guidance is available at: Party Wall Act 1996

6)

Unique text
The CTMP required by condition 5 should address the following issues with the submitted draft CTMP: Q13 - It is unclear how the skip swap from the garden would occur. It appears that a skip vehicle would reverse into the garden from the highway over the footway. This would block the footway and carriageway and would not be considered acceptable. The method of spoil removal should be clarified. Wait and load, with spoil removed by conveyor over the footway into a waiting muck away vehicle, would be the most appropriate for the site. Q14 - The concrete deliveries should not require the diversion of pedestrians onto the opposite pavement. Appropriate ramping should be used to allow pedestrian passage to remain uninterrupted during concrete pours. Q16 - As above, the footway should not be closed for concrete deliveries and skip swaps. The methodology must be amended to reflect this. Q19 - Dimensions for skip lorries have not been included. All vehicle dimensions must be included. Q20 - Vague language must be avoided. This is the case for the entire document. The response to this question should include a firm commitment that only one vehicle would be on the highway at any one time.

7)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Katie Parsons
Planning team: Fast Track Team
Email: [email protected]
Telephone: 020 7361 3012