1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Submission of details (Full PP)
No development shall commence until full particulars of the following have been submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Cycle parking and storage.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and to ensure adequate cycle parking is provided in accordance with Consolidated Local Plan policy CT1(f). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
4)
Protection of trees during construction - Details required
No development shall commence until full particulars of the method(s) by which all existing trees on the site and adjacent land are to be protected during site preparation, demolition, construction, landscaping, and other operations on the site including erection of hoardings, site cabins, or other temporary structures, shall be submitted to and approved in writing by the local planning authority and the development shall be carried out only in accordance with the details so approved.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
5)
Construction Traffic Management Plan (CTMP)
No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority.ÿ The statement should include:
a)ÿ routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway;
b)ÿ access arrangements to the site;
c)ÿ the estimated number and type of vehicles per day/week;
d)ÿ details of any vehicle holding area;
e)ÿ details of the vehicle call up procedure;
f)ÿÿ estimates for the number and type of parking suspensions that will be required;
g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development;
h)ÿ work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development;
i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway;
j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and
k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements.
The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that "No development shall commence until" as
6)
Professional management of engineering works
No development shall commence until a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed to supervise the construction works throughout their duration and their appointment confirmed in writing to the Local Planning Authority. In the event that the appointed engineer ceases to perform that role for whatever reason before the construction works are completed those works will cease until a replacement chartered engineer of the afore-described qualification has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer is at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
7)
Considerate Constructors Scheme (CCS)
No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
8)
Accessibility
The units hereby approved and as shown on approved drawings shall achieve compliance with optional requirement M4(2) of the building regulations and the units shall not be occupied until Building Regulations approval has been issued certifying that these criteria have been achieved.
Reason - To ensure satisfactory provision for people with disabilities and meet the changing needs of households in accordance with development plan policies in particular policy CH2 of the Consolidated Local Plan.
9)
Enhanced Sound Insulation
No development shall commence until details of an enhanced sound insulation value DnT,w of at least 5dB above the Building Regulations value, for the floor/ceiling structures separating different types of rooms/ uses in adjoining dwellings, namely living rooms above bedrooms of separate dwelling shall be submitted to and approved in writing by the local planning authority. The approved details shall be implemented prior to occupation of the development and thereafter be permanently retained.
Reason - To accord with the development plan by ensuring that the living conditions for future occupiers of the proposed units and of those living near the development are suitably protected. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.