Case reference: PP/17/01905
Address: Redevelopment site at Wornington Green Estate, Wornington Road, LONDON
Ward: Golborne
Polling district: 09
Listed Building Grade: N/A
Conservation area: Holland Park

Applicant details

Applicant's name: Catalyst Housing Group
Applicant company name: CBRE Ltd
Contact address: Henrietta House Henrietta Place London W1G 0NB

Proposal details

Application type: PP (Planning permission)
Proposed development Submission of reserved matters (appearance, layout and landscaping) pursuant to outline planning permission dated March 2010 (ref:PP/09/02786) relating to changes to Phase 2 (Blocks 4 and 6) of Wornington Green Development to facilitate the removal of the basement from Block 4 (MAJOR APPLICATION)
Date received: 22 Mar 2017
Registration date:
(Statutory start date)
03 Apr 2017
Public consultation ends: 12 May 2017
Application status: Decided
Target date for decision: 03 Jul 2017

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 26 May 2017
Conditions and reasons:

1)

Compliance with approved drawings Except as required by conditions 19 and 20, the development shall not be carried out except in complete accordance with the details shown on submitted plans P-200 REV A, P-201, P-300, P-301 REV C, P-302 REV B, P-401 REV F, P-402 REV A, P-403 REV A, P-404 REV A, P-405 REV A, P-406 REV A, P-407 REV A, P-408 REV B, P-410 REV A, P-411 REV D, P-412 REV B, P-413 REV A, P-414 REV A, P-415 REV A, P-416 REV A, P-417 REV A, P-418 REV A, P-420 REV A, P-421 REV A, P-422, P-423 REV A, P-424 REV A, P-425 REV A, P-426, P-427, P-428, P-429, P-430, P-500 REV B, P-501 REV B, P-502 REV C, P-503, P-510 REV F, P-511 REV B, P-512 REV D, P-513 REV B, P-600 REV A, P-601, P-602, P-603, P-604, P-605, P-606, P-607, AA0651_2.1_1001 REV E, IA-353-LGA-P01 REV B, IA-353-LP-P01 REV A, IA-353-LP-P02 REV B, IA-353-LP-P03, IA-353-LP-P04 REV A, IA-353-LS-P01 REV B, IA-353-PP-P02, IA-353-PP-P03 REV A, IA-353-LP-P01.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

2)

Details to be submitted for Development Plot 1 (Block 4) No development shall commence pursuant to Development Plot 1 (as shown on plan P-302 REV B) (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: a) samples of the materials to be used on the external faces of Block 4; b) detailed elevation, plan and sectional drawings of all external materials (at scale 1:20); c) detailed drawings (and sample materials as required) including sections of all windows, doors, entrances, shopfronts, canopies parapet details, plant/core overrun enclosures and top storeys (at scale 1:20); d) detailed drawings (and sample materials as required) including sections of all terraces (at scale 1:20); e) detailed drawings and sections and planting schedule for the green roof; f) detailed drawings (and sample materials as required) of any proposed walls, fences, railings, balustrades and hard landscaping within the curtilage of Development Plot 1 (at scale 1:20).
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan.

3)

On site sample panel Development Plot 1 (Block 4) No development shall commence pursuant to Development Plot 1 (save for demolition, below ground works and temporary works) until sample panels of facing stonework and brickwork, and external metalwork and windows, as approved in condition 2 have been provided on site and approved in writing by the Local Planning Authority. The sample panels shall show the proposed colour, texture, facebond, and pointing to be used on the external faces of Block 4. The sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

4)

Details to be submitted for Development Plot 2 (Block 6 - Murchison Gardens) No development shall commence pursuant to Development Plot 2 (as shown on plan P-302 REV B) (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: a) samples of the materials to be used on the external faces of the Murchison Gardens building; b) detailed elevation, plan and sectional drawings of all external materials (at scale 1:20) c) detailed drawings (and sample materials as required) including sections of all windows, doors, entrances, canopies, parapet details, plant/core overrun enclosures, and top storeys (at scale 1:20); d) detailed drawings (and sample materials as required) including sections of all terraces and balconies (at scale 1:20); e) detailed drawings and sections and planting schedule for the green roof; f) detailed drawings (and sample materials as required) of any proposed walls, fences, railings, balustrades and hard landscaping within the curtilage of Development Plot 2 (at scale 1:20).
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

5)

On site sample panel Development Plot 2 No development shall commence pursuant to Development Plot 2 (save for demolition, below ground works and temporary works) until sample panels of facing stonework and brickwork, and external metalwork and windows, as approved in condition 2 have been provided on site and approved in writing by the Local Planning Authority. The sample panels shall show the proposed colour, texture, facebond, and pointing to be used on the external faces of Block 4. The sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

6)

Details to be submitted for Development Plot 3 (Block 6 - Wornington Road) No development shall commence pursuant to Development Plot 3 (as shown on plan P-302 REV B) (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: a) samples of the materials to be used on the external faces of the Wornington Road building; b) detailed elevation, plan and sectional drawings of all external materials (at scale 1:20) c) detailed drawings (and sample materials as required) including sections of all windows, doors, entrances, canopies, parapet details, plant/core overrun enclosures, and top storeys (at scale 1:20); d) detailed drawings (and sample materials as required) including sections of all terraces and balconies (at scale 1:20); e) detailed drawings and sections and planting schedule for the green roof; f) detailed drawings (and sample materials as required) of any proposed walls, fences, railings, balustrades and hard landscaping within the curtilage of Development Plot 3 (at scale 1:20).
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

7)

On site sample panel Development Plot 3 No development shall commence pursuant to Development Plot 3 (save for demolition, below ground works and temporary works) until sample panels of facing stonework and brickwork, and external metalwork and windows, as approved in condition 2 have been provided on site and approved in writing by the Local Planning Authority. The sample panels shall show the proposed colour, texture, facebond, and pointing to be used on the external faces of Block 4. The sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

8)

Details to be submitted for Development Plot 4 (Block 6 - Portobello Road) No development shall commence pursuant to Development Plot 4 (as shown on plan P-302 REV B) (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: a) samples of the materials to be used on the external faces of the Portobello Road building; b) detailed elevation, plan and sectional drawings of all external materials (at scale 1:20) c) detailed drawings (and sample materials as required) including sections of all windows, doors, entrances, shopfronts, canopies, parapet details, plant/core overrun enclosures (including flues to CHP plant), and top storeys (at scale 1:20); d) detailed drawings (and sample materials as required) including sections of all terraces and balconies (at scale 1:20); e) detailed drawings (and sample materials as required) including sections of the 'link building' spanning Murchison Mews; f) detailed drawings (and sample materials as required) of any proposed walls, fences, railings, balustrades and hard landscaping within the curtilage of Development Plot 4 (at scale 1:20).
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

9)

On site sample panel Development Plot 4 No development shall commence pursuant to Development Plot 4 (save for demolition, below ground works and temporary works) until sample panels of facing stonework and brickwork, and external metalwork and windows, as approved in condition 2 have been provided on site and approved in writing by the Local Planning Authority. The sample panels shall show the proposed colour, texture, facebond, and pointing to be used on the external faces of Block 4. The sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan.

10)

Details to be submitted for Development Plot 5 (Block 6 - Murchison Mews) No development shall commence pursuant to Development Plot 5 (as shown on plan P-302 REV B) (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: a) samples of the materials to be used on the external faces of the Murchison Mews building; b) detailed elevation, plan and sectional drawings of all external materials (at scale 1:20) c) detailed drawings (and sample materials as required) including sections of all windows, doors, entrances, canopies, parapet details, and top storeys (at scale 1:20); d) detailed drawings (and sample materials as required) including sections of all terraces and balconies (at scale 1:20); e) detailed drawings and sections and planting schedule for the green roof; f) detailed drawings (and sample materials as required) of any proposed walls, fences, railings, balustrades and hard landscaping within the curtilage of Development Plot 5 (at scale 1:20).
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

11)

On site sample panel Development Plot 5 No development shall commence pursuant to Development Plot 4 (save for demolition, below ground works and temporary works) until sample panels of facing stonework and brickwork as approved in condition 10, showing the proposed colour, texture, facebond, and pointing to be used on the external faces of the Murchison Mews buildings (Development Plot 5 - Block 6), have been provided on site and approved in writing by the Local Planning Authority and the sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

12)

Details to be submitted for Development Plot 6 (Block 6 - Athlone Gardens) No development shall commence pursuant to Development Plot 6 (as shown on plan P-302 REV B) (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: a) samples of the materials to be used on the external faces of the Athlone Gardens building; b) detailed elevation, plan and sectional drawings of all external materials (at scale 1:20) c) detailed drawings (and sample materials as required) including sections of all windows, doors, entrances, canopies, parapet details, and top storeys (at scale 1:20); d) detailed drawings (and sample materials as required) including sections of all terraces and balconies (at scale 1:20); e) detailed drawings and sections and planting schedule for the green roof; f) detailed drawings (and sample materials as required) of any proposed walls, fences, railings, balustrades and hard landscaping within the curtilage of Development Plot 6 (at scale 1:20).
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

13)

On site sample panel Development Plot 6 No development shall commence pursuant to Development Plot 6 (save for demolition, below ground works and temporary works) until sample panels of facing stonework and brickwork, and external metalwork and windows, as approved in condition 2 have been provided on site and approved in writing by the Local Planning Authority. The sample panels shall show the proposed colour, texture, facebond, and pointing to be used on the external faces of Block 4. The sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason - In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan

14)

Public realm landscaping details No development pursuant to Block 6 shall commence (save for temporary works, demolition and below ground works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to completion of Phase 2 and shall be so maintained: a) samples of all materials proposed for hard landscaping; b) detailed drawings and materials of any proposed walls, fences, gates, or railings; c) detailed plan and sections drawings at scale 1:20 of all street furniture including cycle parking stands and bins; d) details of any exterior lighting.
Reason - In order to safeguard the quality of the development and the character and appearance of the area in accordance with Policies CL2 and CR6 of the Consolidated Local Plan

15)

Planting and replanting All tree and shrub planting forming part of the plans and details approved through this planning permission shall be carried out in the first planting and seeding season following the first occupation of the development or the completion of the development whichever is the sooner. Any trees or shrubs which, within a period of five years from the first planting and seeding season referred to above, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan

16)

No additional roof structures and appliances No additional water tank, lift motor room, or other structure or appliance, shall be erected upon the roof of any building.
Reason - To preserve the appearance of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL6 of the Consolidated Local Plan

17)

Restricting planning permission granted by GPDO - Removal of PD Rights of Mews Houses No extensions, additions, insertion of windows, or external alterations shall be carried out to the Mews Houses in the absence of planning permission for such development.
Reason - Although such extensions, additions, or alterations would, in the absence of this condition, constitute development permitted under the provisions of Article 3, Schedule 2, Part 1 and Part 25, of the Town and Country Planning (General Permitted Development) Order 1995 (as amended) such development is precluded in this case because the of the potential impact on the architectural quality of the development and the living conditions of neighbouring properties and future residents of the development. NB This withdrawal of permitted development rights does not remove your right to apply to the local planning authority for planning permission for development precluded through this condition, and such an application would be treated on its merits. It would be prudent to use our pre-application Advice Service before submitting such an application.

18)

Soil depth in gardens A minimum soil depth of one metre shall be maintained in garden areas of Blocks 4 and 6 hereby approved.
Reason - To ensure that there is adequate soil depth for drainage and plants to grow in accordance with Policy CR6 of the Consolidated Local Plan

19)

Revised Block 6 car parking layout Notwithstanding the approved plans, a revised Block 6 car parking layout plan shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to occupation of Block 6 and shall be so maintained.
Reason - To ensure that there is adequate manoeuvring space for all car parking spaces in accordance with Policy CT1 of the Consolidated Local Plan and Transport and Streets SPD.

20)

Cycle parking details- Block 4 No development shall commence (save for temporary works, demolition and below ground works) until details and plans of all residential cycle parking has been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to occupation of Block 4 and shall be so maintained.
Reason - To ensure that cycle parking stands are convenient to use in accordance with Policy CT1 of the Consolidated Local Plan and the Transport and Streets SPD.

21)

No development pursuant to block 6 (save for temporary works and demolition) shall commence until detailed drawings of the design and construction of the public highway, including the following, have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to completion of Phase 2 and shall be so maintained. Highway drainage; All other drainage contained within or under the highway; Kerb foundations and where appropriate kerbs (including location of lowered kerbs at vehicle and pedestrian crossings); Carriageway sub-base, road-base and supporting structures; Carriageway base course surfacing, carriageway wearing course; Footway build up including sub base and surface materials; Street lighting; Street name plates; Road markings and traffic signs;
Reason - To ensure that the highway is constructed to a high quality in accordance with Policy CT1 and CR1 of the Core Strategy.

22)

Cycle parking details- Block 6 No development pursuant to Block 6 (save for temporary works, demolition and below ground works) until details and plans of all residential cycle parking has been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to occupation of Block 6 and shall be so maintained.
Reason - To ensure that cycle parking stands are convenient to use in accordance with Policy CT1 of the Consolidated Local Plan and the Transport and Streets SPD.

23)

Refuse Collection management plan- Block 4 No development pursuant to Block 4 (save for temporary works, demolition and below ground works) until details of a refuse collection management plan has been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to occupation of Block 4 and shall be so maintained.
Reason - To ensure that the refuse arrangements are in accordance with policies CR7 and CE3 of the Consolidated Local Plan

24)

Vehicular access gate- Block 6 No development pursuant to Block 6 (save for temporary works, demolition and below ground works) until details of the vehicular access gate has been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved prior to occupation of Block 6 and shall be so maintained.
Reason - To ensure that the vehicular access is in accordance with Policy CT1 of the Consolidated Local Plan and the Transport and Streets SPD.

Informatives:

1)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

2)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

3)

CTMPs - Reminder to be Sensitive
You are reminded of the purpose of the Construction Traffic Management Plan, which is to mitigate impact upon the living conditions enjoyed by residents of neighbouring properties as well as to ensure the safe and unobstructed function of the highways in the vicinity.ÿ You are also reminded of the membership of the Considerate Constructors Scheme, required by condition and which has similar objectives.ÿCare and sensitivity is required when carrying out development in residential areas.

4)

Unique text
Upon approval of this permission you are advised to contact the Hydrant Officer at the London Fire Brigade Water Team, Operational Resilience - Operational Planning on 0208 5551200 to discuss the locations of fire hydrants across the site.

5)

Working Hours on Building Sites
You are advised that that construction and demolition work is controlled by the Council under Section 60 and 61 of the Control of Pollution Act 1974. In particular, building work which can be heard at the boundary of the site shall only be carried out between the following hours: Monday to Friday - 08.00 to 18.30 Saturdays - 08.00 to 13.00 Sundays and Bank Holidays - No noisy works at all Builders who undertake noisy work outside of these hours may be liable for prosecution and a fine of up to o5,000 where a notice has been previously served under the Control of Pollution Act 1974.

6)

S.61 of Control of Pollution Act 1974
Your attention is drawn to Section 61 of the Control of Pollution Act 1974, which allows developers and their building contractors to apply for `prior consent' for noise generating activities during building works. This proactive approach involves assessment of construction working methods to be used and prediction of likely construction noise levels at sensitive positions, with the aim of managing the generation of construction noise using the `best practicable means' available. You are advised to engage an acoustic consultant experienced in construction noise and vibration assessment and prediction to complete your s.61 application.ÿRelevant information can be found here S.61 Control of Pollution Act 1974

7)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:23 May 2017
Time:18:30
Venue:Committee Room 1
Report item number:ST10

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Joseph Whitworth
Planning team: Strategic Developments Team