1)
Time Limit
The development hereby permitted shall be begun before the expiration of five years from the grant of planning application ref. PP/15/04338 dated 04.02.2016.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Submission of details (Full PP)
Prior to commencement of the relevant phase of development as shown on drawing 1520A(02)080, save for demolition and excavation of the
basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development
shall not be completed otherwise than in accordance with the details so approved:
(a) extent and position of internal and surface vehicle parking; and
(b) details of the provision of vehicle turning space within the site.
Reason - To provide safe and sustainable movement of traffic on neighbouring highways, in accordance with development plan polices in particular policies CH2(b) and CT1 of the Consolidated Local Plan.
4)
Demolition Environmental Management Plan
No demolition works shall be undertaken until a site specific Demolition Environmental Management Plan has been submitted to and approved in writing by the local planning authority. This shall include a risk assessment and appropriate mitigation measures to minimise dust and emissions based on the Mayor's Best Practice Guidance (The Control of Dust and Emissions from Construction and Demolition) or the London Plan control of emissions from construction and demolition SPG. The report shall also include an inventory and timetable of dust generating activities, emission control methods and where appropriate air quality monitoring. The works shall only be carried out in accordance with the approved plan.
Reason - To minimise the impact of the proposed demolition on the amenity of neighbouring occupiers and to comply with policies of the development plan in particular policies CL5 and CE6 of the Consolidated Local Plan and the requirements of the NPPF and Policy 7.14 b of the London Plan. It is necessary for the condition to be on the basis that 'No demolition works shall be undertaken until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
5)
Construction Environmental Management Plan
No construction works shall be undertaken until a site specific Construction Environmental Management Plan has been submitted to and approved in writing by the local planning authority. This shall include a risk assessment and appropriate mitigation measures to minimise dust and emissions based on the Mayor's Best Practice Guidance (The Control of Dust and Emissions from Construction and Demolition) or the London Plan control of emissions from construction and demolition SPG. The report shall also include an inventory and timetable of dust generating activities, emission control methods and, where appropriate, air quality monitoring. The works shall only be carried out in accordance with the approved plan.
Reason - To minimise the impact of the proposed construction on the amenity of neighbouring occupiers and to comply with policies of the development plan in particular policies CL5 and CE6 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No construction works shall be undertaken until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
6)
Submission of details (Full PP)
Prior to commencement development phase E as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals;
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5;
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
7)
Submission of details (Full PP)
Prior to commencement development phase F as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals;
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5;
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
8)
Submission of details (Full PP)
Prior to commencement development phase G as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals; and
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
9)
Submission of details (Full PP)
Prior to commencement development phase H as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals; and
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
10)
Submission of details (Full PP)
Prior to commencement development phase J as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals; and
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
11)
Submission of details (Full PP)
Prior to commencement development phase K as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals;
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5;
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
12)
Submission of details (Full PP)
Prior to commencement development phase L as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Sample panels of both the facing brickwork and the glazed brick, showing the proposed colour, texture, facebond and pointing shall be provided on site, and the sample panels shall be retained on site until the work is completed in accordance with the panel(s) so approved;
(b) Samples of materials to be used on the external faces of the building(s);
(c) Section and elevation details of parapets, window and door reveals; and
(d) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
13)
Submission of details (Full PP)
Prior to the commencement of development phase E as shown on drawing 1520A(02) 080 (save for demolition and excavation of the basement), full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise that in accordance with the details so approved
(a) details of decorative panels to cinema facade and spandrel panels to 194-204 Kings Road; and
(b) details of the method of removal of the paint to the front facade of 206-222 Kings Road.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
14)
Submission of details (Full PP)
Prior to the commencement of development phase L as shown on drawing 1520A(02) 080 (save for demolition and excavation of the basement), full particulars of the following shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise that in accordance with the details so approved
(a) details of the insulating render to Friese Green House including how this will be detailed around the window/door reveals and corners of the building; and
(b) Details/samples of windows (including glazing, doors) railings, balcony awnings, with elevational drawings at a scale of 1:20 and plan and vertical sectional drawings at a scale of 1:5.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
15)
Signage and shopfront strategy
Prior to the commencement of any development phases E, F or G as shown on drawing 1520A(02) 080 (save for demolition and excavation of the basement), details of a signage and shopfront strategy including vents and elevations (at Scale 1:20) shall be submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise that in accordance with the details so approved.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
16)
Shopfront and signage
Prior to the first occupation of each retail unit, details of the shopfront and signage including elevation drawings (at Scale 1:20) and plan and section drawings (at Scale 1:5) shall be submitted to and approved in writing by the local planning authority. The development shall be completed in accordance with the approved details.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.
17)
Construction - Retained front facade
Prior to commencement of development a method statement shall be prepared by a Structural Engineer showing how the central portion of the front facade of 206 - 222 King's Road is to be safeguarded and retained during demolition and construction. The method statement shall be
submitted to and approved in writing by the local planning authority and the works shall be carried out in accordance with the approved details.
Reason - To preserve the appearance of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'prior to commencement' as compliance with the requirements of this condition at a later stage would result in unnacceptable harm contrary to the policies of the Development Plan
18)
Demolition Traffic Management Plan (DTMP)
No demolition shall commence until a Demolition Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The statement shall include:
a) routeing of demolition vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway;
b) access arrangements to the site;
c) the estimated number and type of vehicles per day/week;
d) details of any vehicle holding area;
e) details of the vehicle call up procedure;
f) estimates for the number and type of parking suspensions that will be required;
g) details of any diversion or other disruption to the public highway during preparation, demolition work associated with the development;
h) work programme and/or timescale for each phase of preparation demolition, and excavation work associated with the development;
i) details of measures to protect pedestrians and other highway users from demolition activities on the highway;
j) a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and
k) where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements.
The development shall be carried out in accordance with the approved Demolition Traffic Management Plan.
Reason - To minimise the impact of demolition works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CT1 and CL5 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No demolition shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contr
19)
Construction Traffic Management Plan (CTMP)
No construction works shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority.ÿ The statement should include:
a)ÿ routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway;
b)ÿ access arrangements to the site;
c)ÿ the estimated number and type of vehicles per day/week;
d)ÿ details of any vehicle holding area;
e)ÿ details of the vehicle call up procedure;
f)ÿÿ estimates for the number and type of parking suspensions that will be required;
g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development;
h)ÿ work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development;
i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway;
j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and
k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements.
The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that 'No construction works shall comme
20)
Provide cycle storage prior to occupation
Details of the cycle storage facilities indicated on the approved plans shall be submitted to and approved by the Local Planning Authority prior to occupation of the relevant part of the development and fully implemented and made available for immediate use in accordance with the approved details. The cycle facilities shall thereafter be retained for use at all times.
Reason - To ensure the safe and sustainable movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.
21)
Vehicles - Point of egress
Vehicles egress from the servicing yard to the rear of the site on Hemus Place shall be in forward gear only.
Reason - To ensure the safe and free movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.
22)
Delivery, Service and Waste Management Plan
Prior to occupation of each use within the site, an updated delivery, service and waste management plan for the site detailing the delivery, servicing, refuse and recycling storage facilities and arrangements for the site has been submitted to and approved in writing by the Local Planning Authority and fully implemented and made available for immediate use in accordance with the approved details. The facilities shall thereafter be retained for use at all times and the servicing and delivery arrangements carried out in accordance with the approved details.
Reason - To prevent any significant disturbance to residents of nearby properties and the surrounding highway and comply with development plan policies, in particular policies CT1, CL5 and CE5 of the Consolidated Local Plan.
22)
The current use is a social and community use (or has been in the recent past).
23)
Travel Plan - Details reserved
No buildings hereby approved shall be occupied until a travel plan in relation to the site as a whole, has been submitted to, and approved in writing by, the local planning authority. The travel plan shall be monitored and reviewed in accordance with any targets within the plan, and such record made available upon request by the local planning authority.
Reason - To ensure the safe and sustainable movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.
24)
Professional management of engineering works
No development shall commence until a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed to supervise the construction works throughout their duration and their appointment confirmed in writing to the Local Planning Authority. In the event that the appointed engineer ceases to perform that role for whatever reason before the construction works are completed those works will cease until a replacement chartered engineer of the afore-described qualification has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer is at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
25)
Considerate Constructors Scheme (CCS)
No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
26)
BREEAM Rating - New build non-residential
The non-residential floorspace hereby approved shall achieve a BREEAM rating of Excellent including all of the retail units, office, cinema and public house/bar floor space. None of the non-residential floorspace hereby approved shall be occupied until a design stage interim Excellent
certificate has been achieved. Following the occupation of the non-residential floorspace, a post construction review certificate, certifying that a BREEAM rating of excellent has been achieved, shall be submitted to the Local Planning Authority within 1 year of the occupation.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.
27)
Energy Performance
The dwellings shall achieve Level 4 of the Code for Sustainable Homes equivalent in relation to energy performance and none shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 equivalent for this criterion has been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.
28)
Trees and landscaping - Details required
Before the relevant parts of the development commence, a scheme of hard and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include:
i. Details of all proposed trees and shrubs;
ii. Details of all paths/shared surfaces within the site;
iii. Details of all surfacing materials; and
iv. Details of the roof top planting to the roof top bar.
The development shall be completed in accordance with the approved details.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan.
29)
Planting and replanting
All tree and shrub planting forming part of the plans and details approved through this planning permission shall be carried out in the first planting and seeding season following the first occupation of the development or the completion of the development whichever is the sooner. Any trees or shrubs which, within a period of five years from the first planting and seeding season referred to above, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan.
30)
Hours of operation - Public House
The use of the public house shall not be carried out other than between 08:00 hours and 24:00 hours Monday to Saturday and between 09:00 and 23:30 on Sundays.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
31)
Hours of operation - Roof top bar
The use of the roof top bar shall not be carried out other than between 08:00 hours and 23:30 hours Monday to Saturday and between 09:00 and 23:00 on Sundays.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
32)
Delivery vehicles
No deliveries or collections to and from the commercial units shall take place between 22:00 and 08:00 on any day.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
33)
No music audible outside
No music, musical instruments, or loudspeakers shall be played or used within the public house and roof top bar/restaurant premises forming the subject of this permission so as to be audible outside the premises.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
34)
Doors - Self closing
Prior to the commencement of the use, the doors to the cinema and roof top bar fronting Chelsea Manor Street shall be made self closing, and
the doors shall thereafter be kept closed at all times except when required for the incidental entry or exit of goods and customers.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
35)
Sound insulation
Prior to commencement of the relevant phase of the development as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, a scheme of sound insulation, designed to prevent the lateral and vertical transmission of excessive airborne and impact noise
between the commercial use and the residential use, shall be submitted to and approved in writing by the Local Planning Authority. The sound insulation shall be installed and maintained in accordance with the approved details. The residential dwellings shall not be occupied until the approved scheme has been fully implemented
Reason - To safeguard the amenity of neighbouring properties and to comply with development plan policies, in particular Policy CL5 of the Consolidated
Local Plan.
36)
Noise from building services plant and vents
Prior to commencement of the relevant phase of the development as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, a noise survey and report shall be submitted and approved in writing by the Local Planning Authority. The report shall show how noise emitted by all building services plant and vents shall not exceed a level 10dBA below the existing lowest LA90(10min) at any time when the plant is operating, and where the source is tonal it shall be -15dBA. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential premises or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The plant shall be serviced regularly in accordance with manufacturers' instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is determined by the Local Planning Authority to be failing to comply with this Condition, it shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
37)
Anti-vibration mounts for air-conditioning/ extraction equipment
The plant and lift shall not operate unless it is supported on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
38)
Odours from extraction equipment
Fumes or odours expelled from any flue serving a stove, oven or other cooking device shall not be detectable at the property boundary. If at any time the extraction plant is determined by the local planning authority to be failing to comply with this condition, it (or the source device) shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
39)
Facade construction details
Prior to commencement of the relevant phase of the development as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, full facade construction details of the new external facades of the new building on Chelsea Manor Street and the north facade of Block C, including glazing, with commensurate composite sound insulation shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall show that noise levels within habitable rooms shall comply with the recommendations of BS8233: 2014 'Sound insulation and noise reduction for buildings.' The development shall be constructed in accordance with the approved details.
Reason - To safeguard the amenity of neighbouring properties and to comply with development plan policies, in particular Policy CL5 of the Consolidated Local Plan.
40)
Combustion plant
Prior to the commencement of the above ground works, the details of any combustion plant, including evidence to show that any chimney stack or flue will be located so that it is away from ventilation intakes or accessible areas and at a sufficient height and discharge velocity to disperse the exhaust emissions and details of the selected combustion plant (including abatement equipment), their emissions (and maintenance schedule shall be submitted to and approved in writing by the Local Planning Authority. Boilers shall have NOx emissions not exceeding 40mg/kWh of dry NOx (at 0% O2) and CHP plant not exceeding 95mg/Nm3 (at 5% 02). The combustion plant shall be installed in accordance with the approved details and so maintained.
Reason - To comply with Policies as required by Consolidated Local Plan Policy CE5c and 7.14 a and c of the London Plan
41)
Drainage Strategy
Prior to commencement of the relevant phase of the development as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, a drainage strategy detailing any on and/or off site drainage works, shall be submitted to and approved by, the Local Planning Authority. No discharge of foul or surface water from the site shall be accepted into the public system until the drainage works referred to in the strategy have been completed.
Reason - The development may lead to sewage flooding; to ensure that sufficient capacity is made available to cope with the new development; and in order to avoid adverse environmental impact upon the community.
42)
Level access to shop
The shopfronts hereby approved shall include level access from the pavement to the interior, with no step at the door.
Reason - To ensure accessibility to people with mobility difficulties and so accord with policies of the development plan, in particular CL2 of the Consolidated Local Plan.
43)
Use of roof as terrace precluded
Except as shown on the approved plans, the roof of the buildings, including the roof spaces identified as accessible or green roofs, forming the subject of this permission, shall not be used at any time as a terrace.
Reason - To avoid overlooking and disturbance to neighbouring properties and so accord with policies of the development plan, in particular policy CL5 of the Consolidated Local Plan.
44)
Crossrail
None of the development hereby permitted shall be commenced until detailed design and construction method statements for all the ground floor structures, foundations and basements and for any other structures below ground level, including piling (temporary and permanent), have been submitted to and approved in writing by the Local Planning Authority which:
(i) Accommodate the proposed location of the Chelsea Hackney Line structures, including tunnels;
(ii) Accommodate ground movement arising from the construction thereof;
(iii) Mitigate the effects of noise and vibration arising from the operation of the Chelsea Hackney Line railway within the tunnels and other structures;
The development shall be carried out in all respects in accordance with the approved design and method statements. All structures and work comprising within the development hereby permitted which are required by (i), (ii), (iii) and (iv) shall be completed in their entirety before any part of the building is occupied.
Reason - To ensure that the development accommodates the development and operation of Crossrail 2 (Chelsea-Hackney Line). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
45)
Operational Management Plan
The roof top bar/restaurant and cinema shall not be occupied until a detailed operational management plan for their use has been submitted to and approved by the Local Planning Authority.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
46)
Sustainable Urban Drainage System (SuDS)
Prior to commencement of the relevant phase of development as shown on drawing 1520A (02)080, save for demolition and excavation of the basement, a Sustainable Urban Drainage System (SUDS) Strategy shall be submitted and approved in writing by the Local Planning Authority. The statement shall include:
(a) Details of the waterproofing strategy of the basement;
(b) Information on groundwater floor after development to ensure neighbouring areas will not be adversely affected;
(c) Details of the installation of a positively pumped device;
(d) Details of the installation of a 100m3 geocellular storage tank;
(e) Details of the rainwater harvesting system; and
(f) Information on the operation and maintenance of the SuDS Strategy; and
(g) the provision of Green roofs/Sedum roofs as shown in drawings (1520A (02)007 rev and 1520A (02)001 rev).
The development shall be carried out in accordance with the approved details and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policies CE2 and CL7 of the Consolidated Local Plan, the NPPF and Planning Practice Guidance (written ministerial statement 18th December 2014).
47)
Contamination - preliminary risk assessment report
No development shall commence until a Preliminary Risk Assessment Report comprising:
(i) a desktop study which identifies all current and previous uses at the site and surrounding area as well as the potential contaminants associated with those uses;
(ii) information from site inspection;
(iii) a conceptual model indicating potential pollutant linkages between sources, pathways and receptors, including those in the surrounding area and those planned at the site; and
(iv) a qualitative risk assessment of any potentially unacceptable risks arising from the identified pollutant linkages to human health, controlled waters and the wider environment including ecological receptors and building materials has been prepared in accordance with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing, and submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy Consolidated Local Plan policy CE7. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
48)
Contamination - Site Investigation and quantative risk assessment
No development shall commence (save for demolition) until a Site Investigation Scheme has been undertaken and prepared in accordance with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing, and a Quantitative Risk Assessment Report has been submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular Consolidated Local Plan policy CE7 and to accord with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
49)
Contamination - Remediation method statement
No development shall commence (save for demolition) until a Remediation Method Statement if required, to address the results of the Site Investigation Scheme has been submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular Consolidated Local Plan policy CE7 and accord with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
50)
Contamination - Verification report
On completion of the basement excavation, if required, the details set out in the approved Remediation Method Statement shall be carried out in full and a Verification Report shall be submitted to and approved in writing by the Local Planning Authority which addresses the following:
(i) details of the remediation works carried out;
(ii) results of any verification sampling, testing or monitoring including the analysis of any imported soil;
(iii) classification of waste, its treatment, movement and disposal; and
(iv) and the validation of gas membrane placement.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular Consolidated Local Plan policy CE7.
51)
Contamination - Unexpected
If during development, contamination not previously identified is found to be present at the site, development work shall cease and not be recommenced until a report indicating the nature of the contamination and how it is to be dealt with has been submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular Consolidated Local Plan Policy CE7 and to accord with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).
52)
Ventilation and extraction
Prior to occupation of each use within the site, details of the ventilation and extraction equipment (including any acoustic screening) shall be submitted to and approved in writing by the Local Planning Authority. The equipment shall be installed in accordance with the approved details and so maintained.
Reason - To accord with the development plan by ensuring that the living conditions of those living near the development suitably protected.
53)
Solar shading to residential units
Prior to the occupation of the residential units, details of the glazing and acoustic louvres, where required, in order to mitigate overheating to the south facing single aspect residential units, shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out in accordance with the approved details prior to occupation, and so maintained.
Reason - To accord with the development plan by ensuring that the residential units have an acceptable standard of residential accommodation.
54)
Photovoltaic panels
Prior to the occupation of the residential units, details of the design of the photovoltaic panels shall be submitted to and approved in writing by the Local Planning Authority. The photovoltaic panels shall be installed in accordance with the approved details prior to occupation, and so maintained.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.
55)
Combustion plant
Prior to occupation no CHP plant shall come into use without the fitting of the appropriate abatement equipment or technologies to meet as a
minimum the Band B emissions standard (95mg/Nm3 (at 5% 02). A NOX emissions test must be carried out by an accredited laboratory. The certificate and equipment maintenance schedules must be provided to the planning authority for approval.
Reason - To comply with Policies as required by Consolidated Local Plan Policy CE5 and 7.14 a and c of the London Plan
56)
Hours of operation - Terrace to roof top bar
The terrace to the roof top bar shall not be carried out other than between 08:00 hours and 22:00 hours on any day.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.
57)
Water Efficiency
The dwellings shall achieve compliance with optional requirement G2 (2) (b) and none shall be occupied until Building Regulations approval has been issued for it certifying that these criteria have been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.