!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/18/03006
Address: Barley Shotts Business Park, 246 Acklam Road, LONDON, W10 5YG
Ward: Golborne
Polling district: 09
Listed Building Grade: N/A
Conservation area: N/A

Applicant details

Applicant's name: Sally Clarke Bakery Limited
Applicant company name: Langley Taylor Building Consultancy
Contact address: 13 Prince of Wales Terrace London W8 5PG

Proposal details

Application type: PP (Planning permission)
Proposed development Installation of external emergency escape stairs to the rear elevations of Units 3 & 6, including the creation of associated first floor door openings, to provide alternative means of escape provision from the first floor.
Date received: 25 May 2018
Registration date:
(Statutory start date)
07 Jun 2018
Public consultation ends: 06 Jul 2018
Application status: Decided
Target date for decision: 02 Aug 2018

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 12 Jul 2018
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2000 (as amended), and the grant of planning permission does not imply that such approval will be given. The Director of Building Control, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

4)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

5)

Unique text
Cadent Gas advise: Cadent have identified operational gas apparatus within the application site boundary. This may include a legal interest (easements or wayleaves) in the land which restricts activity in proximity to Cadent assets in private land. The Applicant must ensure that proposed works do not infringe on Cadent.s legal rights and any details of such restrictions should be obtained from the landowner in the first instance. If buildings or structures are proposed directly above the gas apparatus then development should only take place following a diversion of this apparatus. The Applicant should contact Cadent.s Plant Protection Team at the earliest opportunity to discuss proposed diversions of apparatus to avoid any unnecessary delays. If any construction traffic is likely to cross a Cadent pipeline then the Applicant must contact Cadent.s Plant Protection Team to see if any protection measures are required. All developers are required to contact Cadent.s Plant Protection Team for approval before carrying out any works on site and ensuring requirements are adhered to. Due to the presence of Cadent and/or National Grid apparatus in proximity to the specified area, the contractor should contact Plant Protection before any works are carried out to ensure the apparatus is not affected by any of the proposed works. They can be contacted on: +44 (0)800 688588 and/or [email protected] .

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Nicholas Smith
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/18/03006