Planning search

Back to search results

Property details

Case reference: PP/16/04366
Address: Chelsea Farmers Market, 125-135 Sydney Street, LONDON, SW3 6NR
Ward: Stanley
Polling district: 18
Listed Building Grade:
Conservation area: N/A

Applicant details

Applicant's name: Royal Brompton & Harefield NHS Foundation Trust
Applicant company name: DP9 Ltd
Contact address: 100 Pall Mall London SW1Y 5NQ

Proposal details

Application type: PP (Planning permission)
Proposed development Demolition of existing buildings and erection of part 5, part 6 storey buildings with part 1, part 2 storeys of basement to provide a mixed use development comprising 59 residential units, and flexible retail uses (Class A1, A2, A3) and the creation of new publically accessible landscape spaces, associated car, cycle parking, landscaping and amenity and all necessary enabling works (MAJOR APPLICATION)
Date received: 04 Jul 2016
Registration date:
(Statutory start date)
04 Jul 2016
Public consultation ends: 15 Feb 2017
Application status: Decided
Target date for decision: 03 Oct 2016

Decision details

This case has not yet been decided.

Decision: Granted subject to legal agreement
Decision date: 17 Nov 2017
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of fifteen years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Demolition Environmental Management Plan (DEMP) No development shall commence until a site specific Demolition Environmental Management Plan (DEMP) has been submitted to, and approved in writing by, the local planning authority, and the development shall be carried out only in accordance with the Plan so approved. The DEMP shall as a minimum comply with and follow the chapter order (4-7) and appendices (5, 7,8,9) of the Mayors of London 'The Control of Dust and Emissions during Construction and Demolition', SPG, July 2014 Mayors SPG; include an inventory and timetable of dust generating activities during demolition; include dust and emission control measures including on-road demolition traffic e.g. use of Ultra Low Emission Vehicles; Non-Road Mobile Machinery (NRMM) (to include on-site monitoring of PM10 and reporting); include noise and vibration mitigation measures (to include s61 procedure and on-site monitoring and reporting).
Reason - To comply with the requirements of the NPPF and policies CE3, CE5, CE6, and CL5 of the Consolidated Local Plan in ensuring that effects upon air quality in the area are minimised and to accord with the Mayor of London's Best Practice Guidance 'Control of dust and emissions from construction and demolition'. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

4)

Construction Environmental Management Plan (CEMP) No development shall commence (save for demolition) until a site specific Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority, and the development shall be carried out only in accordance with the Plan so approved. The CEMP shall as a minimum comply with and follow the chapter order (4-7) and appendices (5, 7,8,9) of the Mayors of London 'The Control of Dust and Emissions during Construction and Demolition', SPG, July 2014 Mayors SPG; include an inventory and timetable of dust generating activities during construction; include dust and emission control measures including on-road construction traffic e.g. use of Ultra Low Emission Vehicles; Non-Road Mobile Machinery (NRMM) (to include on-site monitoring of PM10 and reporting); include noise and vibration mitigation measures (to include s61 procedure and on-site monitoring and reporting).
Reason - To comply with the requirements of the NPPF and policies CE3, CE5, CE6, and CL5 of the Consolidated Local Plan in ensuring that effects upon air quality in the area are minimised and to accord with the Mayor of London's Best Practice Guidance 'Control of dust and emissions from construction and demolition'. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

5)

Demolition Traffic Management Plan (DTMP) No development shall commence until a Demolition Traffic Management Plan (DTMP) has been submitted to and approved in writing by the local planning authority.ÿThe statement should include: a)ÿ routeing of demolition, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b)ÿ access arrangements to the site; c)ÿ the estimated number and type of vehicles per day/week; d)ÿ details of any vehicle holding area; e)ÿ details of the vehicle call up procedure; f)ÿÿestimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation and demolition work associated with the development; h)ÿwork programme and/or timescale for each phase of preparation and demolition work associated with the development; i)ÿÿdetails of measures to protect pedestrians and other highway users from demolition activities on the highway; j)ÿa strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Demolition Traffic Management Plan.
Reason - To minimise the impact of demolition works upon highway safety and nearby residents' enjoyment of their properties in accordance with policies CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of

6)

Construction Traffic Management Plan (CTMP) No development shall commence (save for demolition) until a Construction Traffic Management Plan (CTMP) has been submitted to and approved in writing by the local planning authority.ÿ The statement should include: a)ÿ routeing of excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b)ÿ access arrangements to the site; c)ÿ the estimated number and type of vehicles per day/week; d)ÿ details of any vehicle holding area; e)ÿ details of the vehicle call up procedure; f)ÿÿestimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during excavation and construction work associated with the development; h)ÿ work programme and/or timescale for each phase of excavation and construction work associated with the development; i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway; j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with policies CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later ti

7)

Contamination - Preliminary Risk Assessment Report No development shall commence until a Preliminary Risk Assessment Report comprising: a desktop study which identifies all current and previous uses at the site and surrounding area as well as the potential contaminants associated with those uses; information from site inspection; a conceptual model indicating potential pollutant linkages between sources, pathways and receptors, including those in the surrounding area and those planned at the site; and a qualitative risk assessment of any potentially unacceptable risks arising from the identified pollutant linkages to human health, controlled waters and the wider environment including ecological receptors and building materials has been prepared in accordance with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing, and submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

8)

Contamination - Site Investigation Scheme No development shall commence until a Site Investigation Scheme has been prepared (if required) in accordance with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing, and has been submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan. (You are advised that the Scheme must be based upon and target the risks identified in the approved preliminary risk assessment and shall provide provisions for, where relevant, the sampling of soil, soil vapour, ground gas, surface and groundwater, and will be a matter of public record). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

9)

Contamination - Site Investigation and Quantitative Risk Assessment No development shall commence (save for demolition) until a site investigation (if required) has been undertaken in compliance with the approved Site Investigation Scheme and a Quantitative Risk Assessment Report (if required) has been submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan, and to accord with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

10)

Contamination - Remediation Method Statement No development shall commence (save for demolition) until a Remediation Method Statement (if required) to address the results of the Site Investigation Scheme has been submitted to, and approved in writing by, the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan and accord with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing.

11)

Contamination - Verification Report No development shall commence (save for demolition) until the approved Remediation Method Statement (if required) has been carried out in full and a Verification Report (if required) confirming: completion of these works; details of the remediation works carried out; results of any verification sampling, testing or monitoring including the analysis of any imported soil; classification of waste, its treatment, movement and disposal; and the validation of gas membrane placement. has been submitted to, and approved in writing, by the local planning authority.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan.

12)

Contamination - Unexpected If during development, contamination not previously identified is found to be present at the site, development work shall cease and not be recommenced until a report indicating the nature of the contamination and how it is to be dealt with has been submitted to, and approved in writing by, the local planning authority.ÿThe approved measures shall be implemented in full.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan, and to accord withÿCLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).

13)

Protection of trees during construction - Details required No development shall commence until full particulars of the method(s) by which all existing trees on adjacent land are to be protected during site preparation, demolition, construction, landscaping, and other operations on the site including erection of hoardings, site cabins, or other temporary structures, shall be submitted to and approved in writing by the local planning authority and the development shall be carried out only in accordance with the details so approved.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

14)

Archaeology - Stage 1 Written Scheme of Investigation No development shall commence until a Stage 1 Written Scheme of Investigation (WSI) has been submitted to and approved in writing by the Local Planning Authority. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agree WSI.
Reason - To safeguard the archaeological heritage of the Borough in accordance with policy CL4 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

15)

Archaeology - Requirement for Stage 2 WSI If heritage assets of archaeological interest are identified by the Stage 1 WSI as required by Condition 14 , for those parts of the site which have an archaeological interest a Stage 2 WSI shall be submitted to approved in writing the local planning authority. No development (including demolition) shall take place other than in accordance with the agreed Stage 2 WSI
Reason - To safeguard the archaeological heritage of the Borough in accordance with policy CL4 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

16)

Sustainable drainage systems The development shall not commence (save for demolition) until a Final detailed Drainage Management Plan has been submitted to and approved in writing the local planning authority. This plan will need to identify existing run off rates together with proposed sustainable urban drainage (SuDS) measures to be included in the development. The SuDS measures so approved shall be implemented in full prior to occupation of the development and shall be so retained
Reason: To ensure the development achieves appropriate water attenuation measures to reduce surface water run off and to comply with Policies CE2 and CE7 of the Consolidated Local Plan

17)

Planting and replanting All tree and shrub planting forming part of the plans and details approved through this planning permission shall be carried out in the first planting and seeding season following the first occupation of the development or the completion of the development whichever is the sooner. Any trees or shrubs which, within a period of five years from the first planting and seeding season referred to above, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan.

18)

Planting and replanting Any trees or shrubs as shown in the approved landscaping schemes under condition 17 which, within a period of five years from the first planting and seeding season, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan, and to ensure the development provides the maximum possible provision towards creation of habitats and valuable areas for biodiversity in accordance with Policy CE4 of the Consolidated Local Plan.

19)

Odours from swimming pool ventilation/ filtration equipment Fumes or odours expelled from any flue serving the hygiene plant or providing ventilation to the swimming pool area shall not be detectable at the property boundary. If at any time the extraction plant is determined by the local planning authority to be failing to comply with this condition, it (or the source equipment) shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

20)

Details of bicycle storage The development shall not be occupied until details of the bicycle storage facilities indicated on the approved plans have been submitted to and approved in writing by the local planning authority. The details shall include the specification of the racks to be used. The bicycle facilities shall be provided in accordance with the approved plans and be retained for use at all times
Reason: To ensure the safe and sustainable movement of traffic on neighbouring highways in accordance with policies of the development plan, in particular, Policy CT1 of the Consolidated Local Plan

21)

Ventilation Prior to the commencement of development (save for demolition) details of a system of mechanical ventilation, with filtration to remove airborne pollutants, for the proposed residential properties shall be submitted to and agreed in writing by the LPA. Filtration should ensure that the national Air Quality Objectives for Nitrogen Dioxide (NO2) and Particulate Matter (PM10) are not exceeded in residential properties. The approved details shall be fully implemented prior to the occupation/use of the development and thereafter permanently retained and maintained. The maintenance and cleaning of the systems shall be undertaken in accordance with manufacturer specifications and shall be the responsibility of the primary owner of the building.
Reason: To Comply with Policies as required by Core Strategy Policy CE5 and 7.14 b of the London Plan

22)

Low Emission Strategy required No development shall commence (save for demolition and below ground works) until a suitable low emission strategy has been submitted to and approved in writing by the Local Planning Authority. This should include a comparison of emissions against London Plan emission benchmarks for buildings and transport and Band B emission standards for combustion plant. This shall include all traffic and combustion plant emissions generated by the development and include measures to reduce emissions from the operational development. The strategy shall detail the emission reduction strategies to be incorporated including proposals for boiler /plant abatement equipment. Measures for transport emissions should include electric charging facilities in parking areas, permit free, a travel plan, and a delivery and service plan
Reason - To comply with the requirements of the NPPF and policy CE5 of the Consolidated Local Plan in ensuring that effects upon air quality in the area are minimised.

23)

Combustion plant -pre installation Prior to installation or use of any combustion plant including temporary installations evidence must be provided to show that any chimney stack/flue will be located so that it is away from ventilation intakes or accessible areas and at a sufficient height and discharge velocity etc to disperse the exhaust emissions (a minimum of 3m above accessible areas). Details of the selected combustion plant (including abatement equipment), their emissions and maintenance schedules shall be provided to the Local Planning Authority for approval. Boilers shall have NOx emissions not exceeding 40mg/kWh of dry NOx (at 0% O2) and CHP plant not exceeding the CHP plant not exceeding 95mg/Nm2 (at 5% 02) as per assessment.
Reason: To Comply with Policies as required by Core Strategy Policy CE5 and 7.14 a and c of the London Plan

24)

Combustion plant - prior to occupation Prior to occupation no CHP plant shall come into use without the fitting of the appropriate abatement equipment or technologies to meet as a minimum the Band B emissions standard (95mg/Nm2 (at 5% 02). A NOX emissions test must be carried out by an accredited laboratory/ competent person. The test certificate and evidence of equipment maintenance schedule and agreement must be provided to the local planning authority for approval.
Reason: To Comply with Policies as required by Core Strategy Policy CE5 and 7.14 a and c of the London Plan

25)

Wheelchair Adaptable Units The units as shown on approved drawings 1848A (02) 310 Britten Street Block BB-G.01 - Wheelchair Conversion P1 1848A (02) 311 Britten Street Block BB-G.02 - Wheelchair Conversion P1 1848A (02) 312 Britten Street Block BB-LG.01 - Wheelchair Conversion P1 1848A (02) 313 Britten Street Block BB-LG.02 - Wheelchair Conversion P1 1848A (02) 314 Sister Block-SB.01.03 - 02.03 - Wheelchair Conversion P1 shall achieve compliance with optional requirement M4(3)(2)(a) of the building regulations and none of the specified units shall be occupied until Building Regulations approval has been issued certifying that these criteria have been achieved.
Reason - To ensure satisfactory provision for people with disabilities and meet the changing needs of households in accordance with development plan policies in particular policy CH2 of the Consolidated Local Plan.

26)

Travel Plan - Details reserved The development hereby approved shall not be occupied until a Final travel plan has been submitted to, and approved in writing by, the local planning authority. The travel plan shall be monitored and reviewed in accordance with any targets within the plan, and such record made available upon request by the local planning authority.
Reason - To ensure the safe and sustainable movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.

27)

Service and Delivery Management Plan - Details reserved The development hereby approved shall not be occupied until a Service and Delivery Management Plan has been submitted to, and approved in writing by, the local planning authority. The proposed use shall operate in accordance with the approved plan and shall be monitored and reviewed in accordance with any targets within the plan, and such record made available upon request by the local planning authority.
Reason - To ensure the safe and sustainable movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.

28)

Electric Car Charging points The development hereby approved shall not be occupied until details of the electric car charging points have been submitted to and approved in writing by the local planning authority. The development should be carried out in accordance with the approved details and be so retained
Reason: To ensure that the development minimises impact on air quality in accordance with Consolidated Local Plan policy CE5 and London plan policy 6.13

29)

Restricting planning permission granted by GPDO - Removal of PD Rights- Mews Houses No extensions, additions, insertion of windows, or external alterations shall be carried out to the Mews Houses in the absence of an express grant of planning permission for such development.
Reason - Although such extensions, additions, or alterations would, in the absence of this condition, constitute development permitted under the provisions of Article 3, Schedule 2, Part 1, of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) such development is precluded in this case to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan NB This withdrawal of permitted development rights does not remove your right to apply to the local planning authority for planning permission for development precluded through this condition, and such an application would be treated on its merits. It would be prudent to use our pre-application Advice Service before submitting such an application.

30)

Details of sound insulation -SISTER BLOCK The development shall not be occupied until a scheme of sound insulation designed to prevent the transmission of excessive airborne and impact noise between the proposed commercial units at ground and lower ground floor levels and the residential uses above shall be submitted to and approved in writing by the local planning authority. The approved scheme shall be implemented in full prior to occupation and be so retained
Reason: To ensure a good standard of development and to comply with policies CE5, CL5 and CH2 of the Consolidated Local Plan

31)

Details of facade sound insulation- MEWS HOUSES Facade sound insulation including glazing shall be of a standard to achieve noise level within the residential units as recommended in Table 5 of BS 8233:2014 Sound Insulation and noise reduction for buildings- Code of Practice. Full details of the facade construction (including glazing) shall be submitted to and approved in writing the local planning authority prior to the commencement of the superstructure and the approved details shall be installed in full prior to the first occupation of the development
Reason: To ensure a good standard of development and to comply with policies CE5, CL5 and CH2 of the Consolidated Local Plan

32)

Details of facade sound insulation- GARDEN BLOCK Facade sound insulation including glazing shall be of a standard to achieve noise level within the residential units as recommended in Table 5 of BS 8233:2014 Sound Insulation and noise reduction for buildings- Code of Practice. Full details of the facade construction (including glazing) shall be submitted to and approved in writing the local planning authority prior to the commencement of the superstructure and the approved details shall be installed in full prior to the first occupation of the development
Reason: To ensure a good standard of development and to comply with policies CE5, CL5 and CH2 of the Consolidated Local Plan

33)

Details of facade sound insulation- BRITTEN STREET BLOCK Facade sound insulation including glazing shall be of a standard to achieve noise level within the residential units as recommended in Table 5 of BS 8233:2014 Sound Insulation and noise reduction for buildings- Code of Practice. Full details of the facade construction (including glazing) shall be submitted to and approved in writing the local planning authority prior to the commencement of the superstructure and the approved details shall be installed in full prior to the first occupation of the development
Reason: To ensure a good standard of development and to comply with policies CE5, CL5 and CH2 of the Consolidated Local Plan

34)

Details of facade sound insulation- BRITTEN STREET BLOCK Facade sound insulation including glazing shall be of a standard to achieve noise level within the residential units as recommended in Table 5 of BS 8233:2014 Sound Insulation and noise reduction for buildings- Code of Practice. Full details of the facade construction (including glazing) shall be submitted to and approved in writing the local planning authority prior to the commencement of the superstructure and the approved details shall be installed in full prior to the first occupation of the development
Reason: To ensure a good standard of development and to comply with policies CE5, CL5 and CH2 of the Consolidated Local Plan

35)

Pumped Devices The basement of the development hereby permitted shall be protected against sewer flooding through the installation of positively pumped devices which shall be installed prior to occupation of the building. The pumped devices shall be so retained
Reason: To protect the basement from sewer flooding and to comply with policies CE2 and CL7 of the Consolidated Local Plan

36)

Noise from building services plant and vents Noise emitted by all building services plant, plant room intake, extract, louvre or vent shall not exceed a level 10dBA below the existing lowest LA90(15min) background noise level at any time when the plant is operating, and where the source is tonal it shall not exceed a level 15dBA below. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential premises or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The plant shall be serviced regularly in accordance with the manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is determined by the local planning authority to be failing to comply with this condition, it shall be switched off upon written instruction from the local planning authority and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

37)

Odours from extraction equipment Fumes or odours expelled from any flue serving a stove, oven or other cooking device shall not be detectable at the property boundary. If at any time the extraction plant is determined by the local planning authority to be failing to comply with this condition, it (or the source device) shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

38)

Anti-vibration mounts for air-conditioning/ extraction equipment All building services plant (including the internal car stacker) shall not operate unless it is supported on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

39)

Water Efficiency The residential dwellings shall achieve compliance with optional requirement G2 (2) (b) and none shall be occupied until Building Regulations approval has been issued for it certifying that these criteria have been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Core Strategy.

40)

Energy Performance The dwelling(s) shall achieve Level 4 of the Code for Sustainable Homes equivalent in relation to energy performance and none shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 equivalent for this criterion has been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Core Strategy.

41)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor (for demolition phase ) is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of demolition work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

42)

Non Road Mobile Machinery (NRMM) Prior to the commencement of the development details shall be submitted to and approved in writing by the Council of all Non-Road Mobile Machinery (NRMM) to be used on the development site. All NRMM should meet as minimum the Stage IIIA emission criteria of Directive 97/68/EC and its subsequent amendments unless it can be demonstrated that Stage IIIA equipment is not available. An inventory of all NRMM must be registered on the NRMM register https://nrmm.london/user-nrmm/register. All NRMM should be regularly serviced and service logs kept on site for inspection. Records should be kept on site which details proof of emission limits for all equipment.
Reason - To comply with the requirements of the NPPF, Policies 7.14a-c of the London Plan and Policy CE5 of the Consolidated Local Plan.

43)

Hours of operation - The retail uses (within Class A1/A2/A3) subject of this permission shall not be carried out other than between 08:00 hours and 23:00 hours, Monday to Saturday and 08:00 hours and 22:00 hours on Sunday or public holidays.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

44)

Trees and landscaping - Details required- Courtyard Area A scheme of landscaping, to include all proposed trees (including full details of all tree pits) shrubs, hard and soft landscaping (including lighting) to the Courtyard Area has been submitted to and approved in writing by the local planning authority before the relevant part of the works , and the development shall only be carried out and maintained in accordance with the details so approved.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. ÿ

45)

Trees and landscaping - Details required- Garden Square A scheme of landscaping, to include all proposed trees (including full details of all tree pits) shrubs, hard and soft landscaping (including lighting) to the Garden Square shall be submitted to and approved in writing by the local planning authority before the relevant part of the works , and the development shall only be carried out and maintained in accordance with the details so approved.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. ÿ

46)

On site sample panel- Mews Houses No development shall commence pursuant to Mews Houses (save for demolition, below ground works and temporary works) until sample panels of facing materials, as approved in condition 52 showing the colour, texture, facebond and joints, to be used on the external faces of the building have been provided on site and approved in writing by the Local Planning Authority and the sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

47)

On site sample panel- Garden Block No development shall commence pursuant to Garden Block (save for demolition, below ground works and temporary works) until sample panels of facing materials, as approved in condition 51 showing the colour, texture, facebond and joints, to be used on the external faces of the building have been provided on site and approved in writing by the Local Planning Authority and the sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

48)

On site sample panel- Sister Block No development shall commence pursuant to Sister Block (save for demolition, below ground works and temporary works) until sample panels of facing materials, as approved in condition 50 showing the colour, texture, facebond and joints, to be used on the external faces of the building have been provided on site and approved in writing by the Local Planning Authority and the sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

49)

On site sample panel- Britten Street Block No development shall commence pursuant to Britten Street Block (save for demolition, below ground works and temporary works) until sample panels of facing materials, as approved in condition 53 showing the colour, texture, facebond and joints, to be used on the external faces of the building have been provided on site and approved in writing by the Local Planning Authority and the sample panels shall be retained on site until the work is completed. The development shall be carried out in accordance with the details so approved and shall be so maintained.
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

50)

Details to be submitted- Sister Block No development shall commence on Sister Block (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: detailed elevations, plans and sectional drawings of external materials including windows (at scale 1:20) all railings and balustrades details of lightwell and entrance enclosure samples of all facing materials including metalwork construction details of typical bay including windows parapet details details of roof details of shopfront and signage strategy details of rooftop plant
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

51)

Details to be submitted- Garden Block No development shall commence on Garden Block (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: detailed elevations, plans and sectional drawings of external materials including windows (at scale 1:20) all railings and balustrades details of lightwell and entrance enclosure samples of all facing materials including metalwork construction details of typical bay including windows parapet details canopy detail details of main roof details of junction with 123 Sydney Street
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

52)

Details to be submitted- Mews Houses No development shall commence on the Mews Houses (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: detailed elevations, plans and sectional drawings of external materials including windows (at scale 1:20) guardrails and balustrades details of lightwell and entrance enclosure samples of all facing materials including metalwork construction details of typical bay including windows parapet details canopy detail
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

53)

Details to be submitted- Britten Street Block No development shall commence on Britten Street Block (save for demolition, below ground works and temporary works) until full particulars of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the details so approved and shall be so maintained: detailed elevations, plans and sectional drawings of external materials including windows (at scale 1:20) all railings and balustrades details of lightwell and entrance enclosure samples of all facing materials including metalwork construction details of typical bay including windows details of PV panels to roof parapet details details of roof including windows and cladding
Reason- In order to safeguard the architectural quality of the development and the character and appearance of the area in accordance with policy CL2 of the Consolidated Local Plan.

54)

Details required- Retail Square Details of the following to the Retail Square shall be submitted to and approved in writing by the local planning authority before the relevant part of the works , and the development shall only be carried out and maintained in accordance with the details so approved. a) all hard and soft landscaping b) samples of paving c) new access stair to 151 Sydney Street d) lighting e) cycle stands f) details of relocated railings and piers from Sydney Street to Dovehouse Green
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policies CL2 and CR6 of the Consolidated Local Plan. ÿ

55)

Details required- Retail Pavilion Details of the following to the Retail Square shall be submitted to and approved in writing by the local planning authority before the relevant part of the works , and the development shall only be carried out and maintained in accordance with the details so approved. a) detailed design b) samples of materials c) details of green roof d) signage strategy
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policies CL2 and CR6 of the Consolidated Local Plan. ÿ

56)

BREEAM Rating - New build non-residential The non-residential floorspace shall achieve a BREEAM rating of Very Good, and none of this floorspace shall be occupied until a Post Construction Review Certificate has been issued for it certifying that a BREEAM rating of Very Good has been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.

57)

Playspace- details reserved None of the residential units shall be occupied until details of the playspace in the Courtyard Garden have been submitted to and approved in writing by the local planning authority and the approved details have been implemented in full
Reason: To ensure a satisfactory standard of development and to comply with Policy CH2 of the Consolidated Local Plan and London Plan Policy 3.6

58)

Maintaining subdivision (floor areas)- RETAIL USES TO SISTER BLOCK The retail uses (within Class A1/A2/A3) hereby permitted shall not at any time be used or occupied otherwise than in separate units
Reason - To ensure that the accommodation meets the particular needs of the area and complies with the Consolidated Local Plan policies relating to.CK2 and CF1

59)

Construction Method Statement (CMS) No development shall commence until a Construction Method Statement detailing how the proposed basement excavation is to be undertaken, spoil removed, the adjoining listed properties at 117-123 Sydney Street would be supported and stabilised, and the basement constructed, has been submitted to and approved in writing by the local planning authority. The Method Statement shall be prepared by a suitably qualified person, namely a Member of the Institute of Structural Engineers (M.I. Struct. E.) or a Member of the Institution of Civil Engineers (M.I.C.E.).
Reason - To ensure adequate safeguard to the structural integrity of neighbouring building in accordance with the Basements SPD and policies CL4 and CL7 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

60)

Restricting planning permission granted by GPDO - Removal of PD Rights No telecommunications equipment shall be fixed to the buildings subject of this planning permission in the absence of an express grant of planning permission for such development.
Reason - Although such additions, would, in the absence of this condition, constitute development permitted under the provisions of Article 3, Schedule 2, Part 16, of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) such development is precluded in this case because such development is precluded in this case to safeguard the architectural quality of the development and the character and appearance of the area in accordance with Policy CL2 of the Consolidated Local Plan NB This withdrawal of permitted development rights does not remove your right to apply to the local planning authority for planning permission for development precluded through this condition, and such an application would be treated on its merits. It would be prudent to use our pre-application Advice Service before submitting such an application.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Conditions - Precedent to Commencement
Conditions no(s) 3,5,7,13,14, 41 and 59 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

Not Temporary Sleeping Accommodation
This permission does not permit the use of the premises to provide temporary sleeping accommodation, including holiday lets, short lets, short term serviced apartments, or timeshare, or for any purpose specified in Section 25 of the Greater London (General Powers) Act 1973, as amended by the Greater London (General Powers) Act 1983, or as timeshare accommodation as specified in Section 5 of the Greater London (General Powers) Act 1984. Use for such purposes would constitute a change of use requiring planning permission. It is the Council's policy to resist such changes of use, and you are advised that planning permission for such a change of use is unlikely to be granted.

5)

Advertisement Consent May Be Required
Any Advertisements to be erected at the premises may require consent under the Control of Advertisement Regulations 2007. You are advised to consult the Directorate of Planning and Borough Development.

6)

Planning Obligation
In granting this permission the Council has had regard to Planning Obligation(s) under Section 106 of the Town and Country Planning Act 1990, as amended.

7)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2000 (as amended), and the grant of planning permission does not imply that such approval will be given. The Director of Building Control, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

8)

Withdrawal of PD Rights
Attention is drawn to conditions 29 and 60 of this approval, the effect of which is to withdraw permitted development rights in respect of the defined type of development which would, otherwise, not require planning permission. You are advised to seek the advice of this planning authority before undertaking any other development in the future in order to ascertain whether planning permission is required and the likelihood of such permission being granted.

9)

Archaeology (to accompany condition)
The Council wishes to ensure that significant archaeological remains on this site are preserved "in situ". The detailed design and method statement should include appropriate drawings, technical notes, and methodology showing how the objective of an "in situ preservation" is to be achieved. Particular attention should be paid to the design of foundations, new groundworks including piling, underpinning, new slab levels and slab construction, lift pits and service trenches. You are advised to consult the Building Control dept. of the Council to ensure that the requirements of the Building Regulations are also met.

10)

S.61 of Control of Pollution Act 1974
Your attention is drawn to Section 61 of the Control of Pollution Act 1974, which allows developers and their building contractors to apply for `prior consent' for noise generating activities during building works. This proactive approach involves assessment of construction working methods to be used and prediction of likely construction noise levels at sensitive positions, with the aim of managing the generation of construction noise using the `best practicable means' available. You are advised to engage an acoustic consultant experienced in construction noise and vibration assessment and prediction to complete your s.61 application.ÿRelevant information can be found here S.61 Control of Pollution Act 1974

11)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

12)

Groundwater discharge
You are advised that where the developer proposes to discharge groundwater to a public sewer, prior approval from Thames Water Developer Services will be required. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991.

Committee details

Decision by: MPDC (Major Planning Development Committee)
Date:01 Jun 2017
Time:18:30
Venue:The Great Hall
Report item number:ST12

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Allison Flight
Planning team: Strategic Developments Team
Email: planning@rbkc.gov.uk
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/16/04366

Date publishedDocument TypeViewDescription
08 Jul 2016  Other  Other-1711034.pdf   DESIGN AND ACCESS STATEMENT PART1 
08 Jul 2016  Other  Other-1711035.pdf   DESIGN AND ACCESS STATEMENT PART2 
08 Jul 2016  Other  Other-1711036.pdf   DESIGN AND ACCESS STATMENT PART3 
08 Jul 2016  Other  Other-1711037.pdf   DESIGN AND ACCESS STATEMENT PART4 
08 Jul 2016  Drawing  Drawing-1711053.pdf   1848A_02_001_GROUND FLOOR PLAN 
08 Jul 2016  Drawing  Drawing-1711054.pdf   1848A_02_002_LOWERGROUND_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711056.pdf   1848A_02_003_REV P1 PROPOSED BASEMENT_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711057.pdf   1848A_02_004_FIRSTFLOOR_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711058.pdf   1848A_02_005_SECONDFLOOR_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711060.pdf   1848A_02_006_THIRDFLOOR_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711061.pdf   1848A_02_007_FOURTHFLOOR_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711062.pdf   1848A_02_008_FIFTHFLOOR_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711065.pdf   1848A_02_009_ROOFPLAN_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711066.pdf   1848A_02_010_PROPOSEDLOCATION_ROOFPLAN 
08 Jul 2016  Drawing  Drawing-1711068.pdf   1848A_02_011_PROPOSEDGROUNDFLOOR_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711071.pdf   1848A_02_012_PROPOSEDLOWERGROUNDFLOOR_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711074.pdf   1848A_02_013_PROPOSEDFIRSTFLOOR_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711089.pdf   1848A_02_014_PROPOSEDSECONDFLOOR_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711090.pdf   1848A_02_015_PROPOSEDTHIRDFLOOR_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711091.pdf   1848A_02_016_PROPOSEDFOURTHFLOOR_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711092.pdf   1848A_02_017_PROPOSEDROOFPLAN_BRITTENSTREETBLOCK 
08 Jul 2016  Drawing  Drawing-1711093.pdf   1848A_02_020_PROPOSEDGROUNDFLOOR_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711094.pdf   1848A_02_021_PROPOSEDLOWERGROUNDFLOOR_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711095.pdf   1848A_02_023_PROPOSEDFIRSTFLOOR_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711096.pdf   1848A_02_024_PROPOSEDSECONDFLOOR_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711097.pdf   1848A_02_025_PROPOSEDTHIRDFLOOR_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711098.pdf   1848A_02_026_PROPOSED ROOF PLAN_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711099.pdf   1848A_02_030_PROPOSEDGROUNDFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711100.pdf   1848A_02_031_PROPOSEDLOWERGROUNDFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711101.pdf   1848A_02_033_PROPOSEDFIRSTFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711102.pdf   1848A_02_034_PROPOSEDSECONDFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711103.pdf   1848A_02_035_PROPOSEDTHIRDFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711104.pdf   1848A_02_036_PROPOSEDFOURTHFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711105.pdf   1848A_02_037_PROPOSEDFIFTHFLOOR_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711106.pdf   1848A_02_038_PROPOSEDROOFPLAN_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711107.pdf   1848A_02_040_PROPOSEDGROUNDFLOOR_RETAILPAVILION 
08 Jul 2016  Drawing  Drawing-1711108.pdf   1848A_02_041_PROPOSEDROOFPLAN_RETAILPAVILION 
08 Jul 2016  Drawing  Drawing-1711125.pdf   1848A_02_100_PROPOSEDELEVATION_A_SYDNEYSTREET 
08 Jul 2016  Drawing  Drawing-1711126.pdf   1848A_02_101_PROPOSEDELEVATION_B_SYDNEYSTREET 
08 Jul 2016  Drawing  Drawing-1711128.pdf   1848A_02_102_PROPOSEDELEVATION_C_BRITTENSTREET 
08 Jul 2016  Drawing  Drawing-1711129.pdf   1848A_02_103_PROPOSEDELEVATION_D_THAMESBROOK1 
08 Jul 2016  Drawing  Drawing-1711130.pdf   1848A_02_104_PROPOSEDELEVATION_E_THAMESBROOK2 
08 Jul 2016  Drawing  Drawing-1711131.pdf   1848A_02_105_PROPOSEDELEVATION_F_RETAILPAVILION 
08 Jul 2016  Drawing  Drawing-1711132.pdf   1848A_02_106_PROPOSEDELEVATION_G_SISTERBLOCKSOUTH 
08 Jul 2016  Drawing  Drawing-1711133.pdf   1848A_02_107_PROPOSEDELEVATION_H_SISTERBLOCKNORTH 
08 Jul 2016  Drawing  Drawing-1711135.pdf   1848A_02_108_PROPOSEDELEVATION_J_GARDENBLOCK_ENTRANCE 
08 Jul 2016  Drawing  Drawing-1711136.pdf   1848A_02_109_PROPOSEDELEVATION_K_COURTYARDENTRANCE 
08 Jul 2016  Drawing  Drawing-1711137.pdf   1848A_02_110_PROPOSEDELEVATION_L_BRITTENSTREETSOUTH 
08 Jul 2016  Drawing  Drawing-1711138.pdf   1848A_02_111_PROPOSEDELEVATION_M_BRITTENSTREETEAST 
08 Jul 2016  Drawing  Drawing-1711139.pdf   1848A_02_112_PROPOSEDELEVATION_N_COURTYARD&MEWSHOUSE 
08 Jul 2016  Drawing  Drawing-1711140.pdf   1848A_02_113_PROPOSEDELEVATION_P_NORTH COURTYARD 
08 Jul 2016  Drawing  Drawing-1711141.pdf   1848A_02_200_PROPOSEDSECTION_A_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711142.pdf   1848A_02_203_PROPOSEDSECTION_D_GARDENSQUARE 
08 Jul 2016  Drawing  Drawing-1711143.pdf   1848A_02_205_PROPOSEDSECTION_F_BRITTENSTREET 
08 Jul 2016  Drawing  Drawing-1711144.pdf   1848A_02_209_PROPOSEDSECTION_J_SITEWIDE 
08 Jul 2016  Drawing  Drawing-1711145.pdf   1848A_02_210_PROPOSEDSECTION_K_SITEWIDETHROUGHCORES 
08 Jul 2016  Drawing  Drawing-1711146.pdf   1848A_02_211_PROPOSEDSECTION_L_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711147.pdf   1848A_02_301_DETAILELEVATION_BRITTENBLOCK 
08 Jul 2016  Drawing  Drawing-1711148.pdf   1848A_02_302_DETAILELEVATION_RETAILPAVILION 
08 Jul 2016  Drawing  Drawing-1711149.pdf   1848A_02_303_DETAILELEVATION_SISTERBLOCK 
08 Jul 2016  Drawing  Drawing-1711150.pdf   1848A_02_304_DETAILELEVATION_MEWSHOUSE 
08 Jul 2016  Drawing  Drawing-1711151.pdf   1848A_02_305_DETAILELEVATION_GARDENBLOCK 
08 Jul 2016  Drawing  Drawing-1711152.pdf   1848A_02_306_DETAILELEVATION_GARDENBLOCK_SYDNEYSTREET 
08 Jul 2016  Drawing  Drawing-1711153.pdf   1848A_02_310_BRITTENSTREETBLOCK_BB.G.01_WHEELCHAIRCONVERSION 
08 Jul 2016  Drawing  Drawing-1711154.pdf   1848A_02_311_BRITTENSTREETBLOCK_BB.G.02_WHEELCHAIRCONVERSION 
08 Jul 2016  Drawing  Drawing-1711155.pdf   1848A_02_312_BRITTENSTREETBLOCK_BB.LG.01_WHEELCHAIRCONVERSION 
08 Jul 2016  Drawing  Drawing-1711156.pdf   1848A_02_313_BRITTENSTREETBLOCK_BB.LG.02_WHEELCHAIRCONVERSION 
08 Jul 2016  Drawing  Drawing-1711157.pdf   1848A_02_314_SISTERBLOCK_SB.01.03_02.03_WHEELCHAIRCONVERSION 
08 Jul 2016  Other  Other-1711170.pdf   STATEMENT OF COMMUNITY INVOLVEMENT PART 1 
08 Jul 2016  Other  Other-1711171.pdf   STATEMENT OF COMMUNITY INVOLVEMENT PART 2 
08 Jul 2016  Other  Other-1711172.pdf   ARBORICULTURAL STATEMENT 
08 Jul 2016  Other  Other-1711173.pdf   TREE SCHEDULE 
08 Jul 2016  Other  Other-1711174.pdf   ACOUSTIC REPORT 
08 Jul 2016  Other  Other-1711175.pdf   AIR QUALITY ASSESSMENT 
08 Jul 2016  CIL Documentation  CIL Documentation-1711176.pdf   CIL ADDITIONAL INFORMATION FORM 
08 Jul 2016  Other  Other-1711177.pdf   CONSTRUCTION MANAGEMENT PLAN 
08 Jul 2016  Other  Other-1711178.pdf   CONSTRUCTION TRAFFIC MANAGEMENT PLAN 
08 Jul 2016  Correspondence  Correspondence-1711179.pdf   COVER LETTER 
08 Jul 2016  Other  Other-1711180.pdf   DAYLIGHT AND SUNLIGHT REPORT 
08 Jul 2016  Other  Other-1711181.pdf   DRAFT HEADS OF TERMS 
08 Jul 2016  Other  Other-1711182.pdf   DRAINAGE STRATEGY 
08 Jul 2016  Other  Other-1711183.pdf   ENERGY STATEMENT PART-1 
08 Jul 2016  Other  Other-1711184.pdf   ENERGY STATEMENT PART -2 
08 Jul 2016  Other  Other-1711185.pdf   VIABILITY ASSESSMENT SUMMARY 
08 Jul 2016  Application Form  Application Form-1711186.pdf   APPLICATION FORM 
08 Jul 2016  Other  Other-1711187.pdf   HERITAGE ASSESSMENT 
08 Jul 2016  Other  Other-1711188.pdf   STATEMENT OF COMMUNITY INVOLVEMENT APPEN_A 
08 Jul 2016  Other  Other-1711190.pdf   STATEMENT OF COMMUNITY INVOLVEMENT APPEN_B 
08 Jul 2016  Other  Other-1711191.pdf   STATEMENT OF COMMUNITY INVOLVEMENT APPEN_C 
08 Jul 2016  Other  Other-1711192.pdf   STATEMENT OF COMMUNITY INVOLVEMENT APPEN_D 
08 Jul 2016  Other  Other-1711193.pdf   PLANNING STATEMENT 
08 Jul 2016  Other  Other-1711194.pdf   PRELIMINARY GEOENVIRONMENTAL RISK ASSESSMENT 
08 Jul 2016  Other  Other-1711195.pdf   SITE INVESTIGATION (CSM) FACTUAL REPORT 
08 Jul 2016  Other  Other-1711196.pdf   SUBTERRANEAN CONSTRUCTION METHOD STATEMENT 
08 Jul 2016  Other  Other-1711197.pdf   SUSTAINABILITY STATEMENT 
08 Jul 2016  Other  Other-1711198.pdf   TRANSPORT ASSESSMENT PART-1 
08 Jul 2016  Other  Other-1711199.pdf   TRANSPORT ASSESSMENT PART-2 
08 Jul 2016  Other  Other-1711200.pdf   TRAVEL PLAN 
08 Jul 2016  Other  Other-1711201.pdf   TOWNSCAPE AND VISUAL IMPACT ASSESSMENT 
08 Jul 2016  Other  Other-1711202.pdf   UTILITY STATEMENT 
08 Jul 2016  Other  Other-1711203.pdf   VENTILATION EXTRACTION AND PLANT STATEMENT 
08 Jul 2016  Other  Other-1711204.pdf   WASTE MANAGEMENT STRATEGY 
08 Jul 2016  Other  Other-1711208.pdf   DRAWING ISSUE SHEET 
08 Jul 2016  Other  Other-1711220.pdf   DRAWING ISSUE SHEET PART 2 
14 Jul 2016  Site Notice  Site Notice-1713856.pdf   Site Notice 
14 Jul 2016  Correspondence  Correspondence-1713908.pdf   Validation acknowledgement 
19 Jul 2016  Consultee Responses  Consultee Responses-1716906.pdf   ECONOMIC DEVELOPMENT TEAM 
20 Jul 2016  Consultee Responses  Consultee Responses-1717674.pdf   SUSTAINABLE PLACES PLANNING ADVISOR. 
21 Jul 2016  Site Notice  Site Notice-1718070.pdf   SITE NOTICE 
22 Jul 2016  Public Comment - Objection  Public Comment - Objection-1718959.pdf   23 MARGARETTA TERRACE 
22 Jul 2016  Public Comment - Objection  Public Comment - Objection-1718958.pdf   Urban Rites Hairdressers  
26 Jul 2016  Public Comment - Objection  Public Comment - Objection-1720724.pdf   8 CARLYLE MANSIONS 
26 Jul 2016  Public Comment - Objection  Public Comment - Objection-1720719.pdf   34A Fernshaw Road  
26 Jul 2016  Public Comment - Objection  Public Comment - Objection-1720720.pdf   34a Fernshaw Road  
26 Jul 2016  Public Comment - Objection  Public Comment - Objection-1720721.pdf   8 Sydney Street  
26 Jul 2016  Public Comment - Objection  Public Comment - Objection-1720722.pdf   26 lots road  
26 Jul 2016  Public Comment - Objection  Public Comment - Objection-1720723.pdf   Flat 3, 197 Queens Gate  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721066.pdf   3 PORTICO HOUSE 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721067.pdf   29 RADIPOLE RD 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721184.pdf   FURTHER OBJ 8 SYDNEY STREET 
27 Jul 2016  Consultee Responses  Consultee Responses-1721558.pdf   FLOODING/ DRAINAGE 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1891588.pdf   80 CHESTERTON SQUARE 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1891590.pdf   17 MARKHAM STREET 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1891591.pdf   45 BRADMORE PARK ROAD 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1896721.pdf   123A KINGS ROAD 
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721057.pdf   8A Marloes Road  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721058.pdf   28 Linton House  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721059.pdf   WARWICK AVE  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721061.pdf   14a McGregor Road  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721062.pdf   49 Kensington Mansions  
27 Jul 2016  Public Comment - Support  Public Comment - Support-1721063.pdf   6 Burton Court  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721065.pdf   PortobelloCafeSociety  
27 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721068.pdf   Grenfell Action Group  
28 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721961.pdf   13 Howard Road  
28 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721962.pdf   4 Astwood Mews  
28 Jul 2016  Public Comment - Objection  Public Comment - Objection-1721963.pdf   299 Kings Road  
29 Jul 2016  Consultee Responses  Consultee Responses-1722556.pdf   POLICY 
29 Jul 2016  Consultee Responses  Consultee Responses-1722978.pdf   GREATER LONDON AUTHORITY 
01 Aug 2016  Consultee Responses  Consultee Responses-1723383.pdf   FROM THAMES WATER 
01 Aug 2016  Public Comment - Objection  Public Comment - Objection-1723406.pdf   cancersurvivorships.com  
01 Aug 2016  Public Comment - Objection  Public Comment - Objection-1723407.pdf   Jameson Street  
01 Aug 2016  Public Comment - Objection  Public Comment - Objection-1723408.pdf   Apartment 6, 28 Sloane Court East  
01 Aug 2016  Public Comment - Objection  Public Comment - Objection-1723409.pdf   7 Paultons Square  
01 Aug 2016  Public Comment - Objection  Public Comment - Objection-1723410.pdf   8 Walpole street  
01 Aug 2016  Public Comment - Objection  Public Comment - Objection-1723411.pdf   Astell St  
03 Aug 2016  Consultee Responses  Consultee Responses-1725040.pdf   ARB COMMENTS 
03 Aug 2016  Consultee Responses  Consultee Responses-1725218.pdf   TRANSPORT FOR LONDON 
04 Aug 2016  Public Comment - Objection  Public Comment - Objection-1725389.pdf   24/62 Finborough Road  
04 Aug 2016  Public Comment - Objection  Public Comment - Objection-1725391.pdf   49 Swan Court, Chelsea Manor Street  
05 Aug 2016  Consultee Responses  Consultee Responses-1726618.pdf   HISTORIC ENGLAND COMMENTS 
08 Aug 2016  Public Comment - Objection  Public Comment - Objection-1727001.pdf   299 KINGS ROAD 
08 Aug 2016  Public Comment - Objection  Public Comment - Objection-1726909.pdf   35 warriner gardens  
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1727878.pdf   FURTHER FROM 26 LOTS ROAD 
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728219.pdf   8 Walpole Street  
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728221.pdf   8 Walpole Street  
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728534.pdf
Public Comment - Objection-1728534 Thumbnails  
FURTHER OBJ 8 SYDNEY STREET 
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1727877.pdf   Tite Street, Chelsea  
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1727882.pdf   Knightsbridge Village Limited  
09 Aug 2016  Public Comment - Objection  Public Comment - Objection-1727883.pdf   Ann Lane  
11 Aug 2016  Consultee Responses  Consultee Responses-1728701.pdf   ARCHAEOLOGY COMMENTS 
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728714.pdf   32 Hugon Road  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728717.pdf   32 Southfields  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728719.pdf   14 Kings Mansions  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728720.pdf   22 Kings Court North  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728721.pdf   56 Paultons Square  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728722.pdf   17 Elm Park Mansions  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728724.pdf   Pimlico Alliance  
11 Aug 2016  Consultee Responses  Consultee Responses-1728736.pdf   EH CONTAMINATION COMMENTS 
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728763.pdf   Linden Staub Models London  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728764.pdf   3 MARGARETTA TERRACE  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728766.pdf   17 Moreton Terrace, Pimlico  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728828.pdf   10 Sutherland Row  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728832.pdf   35 Sussex Street  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728833.pdf   54 Gloucester Street  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728834.pdf   Flat F, 59 Edith Grove  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728835.pdf   Centurion building  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728837.pdf   15 Westmoreland place  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728838.pdf   Calle 145 # 7-07, Bogota, Colombia  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728839.pdf   The Estate of Gloughmire  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728840.pdf   3 Rye House  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728841.pdf   31 Carlton Road  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728842.pdf   Redcliffe Road  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728843.pdf   Pet Pavilion  
11 Aug 2016  Public Comment - Support  Public Comment - Support-1728847.pdf   Bury Walk  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728848.pdf   7 Heber Mansions, Queens Club Gardens  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728850.pdf   21 Ellis Street  
11 Aug 2016  Public Comment - Objection  Public Comment - Objection-1728851.pdf   21 Ellis Street  
11 Aug 2016  Consultee Responses  Consultee Responses-1729257.pdf   DESIGN COMMENTS 
11 Aug 2016  Consultee Responses  Consultee Responses-1729264.pdf   DESIGN COMMENTS 
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729705.pdf   Z MATTOCKS 
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729708.pdf   UNKNOWN ADDRESS CHELSEA 
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729988.pdf   FURTHER OBJ (A. EDELLS) 21 ELLIS STREET 
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1890032.pdf   HOPWASTE LTTD 
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1890033.pdf   RONNI PETERSEN DESIGNS 
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1895302.pdf   5, Edge Hill  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729677.pdf   16 Winchester Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729678.pdf   48 Methley Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729685.pdf   4A Cadogan Square  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729686.pdf   47 Guinness Court  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729688.pdf   Original Business Print  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729689.pdf   2 Mulberry Walk  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729690.pdf   40 MAPLETON Road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729691.pdf   Cranmer court  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729692.pdf   Flat 3, 7 Sheffield Terrace  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729693.pdf   Flat 66, 30 Vincent Square  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729694.pdf   52 Marlborough Court  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729695.pdf   107 D Alderney St  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729696.pdf   1 Moore Park Road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729697.pdf   End Hause - Rosemoor Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729698.pdf   1 Justice Walk  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729699.pdf   17 Margaretta Terrace  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729700.pdf   48 Stanhope gardens  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729701.pdf   314a king's road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729702.pdf   15 Courtield Gardens  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729703.pdf   116 Piccadilly  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729704.pdf   107C Alderney Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729706.pdf   22E Leverstock House, Sutton Estate, Chelsea  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729707.pdf   47 Chipstead Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729831.pdf   Latchmere  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729832.pdf   41 Westmoreland Terrace  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729833.pdf   46 Markham Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729835.pdf   Houseboat Trafalgar  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729837.pdf   26 Lots Road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729838.pdf   196 King's Road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729841.pdf   2 Markham Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729842.pdf   Flat 3 Dresden House  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729844.pdf   175 Old Brompton Road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729845.pdf   299 kings road  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729847.pdf   21 Cale Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729848.pdf   25 Markham Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729849.pdf   45 Godfrey Street  
12 Aug 2016  Public Comment - Objection  Public Comment - Objection-1729850.pdf   30 Cottesmore Court  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730366.pdf   52 G MARESFIELD GARDENS 
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730368.pdf   UNKNOWN ADDRESS FULHAM 
15 Aug 2016  Consultee Responses  Consultee Responses-1730654.pdf   TRANSPORTATION COMMENTS 
15 Aug 2016  Consultee Responses  Consultee Responses-1731234.pdf   SYDNEY STREET AND DISTRICT RES ASSOC. 
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730281.pdf   1 Edith Terrace  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730283.pdf   27/29 Britten street  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730362.pdf   Sydney St and District RA  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730363.pdf   59 POND HOUSE  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730364.pdf   Magnolia Cottage  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730365.pdf   34 Cornwall Gardens  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730367.pdf   36 Chelsea park gardens  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730370.pdf   16 Fernshaw Road  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730371.pdf   41 Westmoreland Terrace  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730372.pdf   71 Union Road  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730373.pdf   39 Warriner Gardens  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730374.pdf   43 Sydney Street  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730375.pdf   6 Clareville Street  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730376.pdf   7 Phene Street  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730377.pdf   Flat 2, 46 Philbeach Gardens  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730378.pdf   Dawes road 73  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730379.pdf   78 Sydney Street  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730380.pdf   Flat 6, North Block,  
15 Aug 2016  Public Comment - Objection  Public Comment - Objection-1730697.pdf   David Ridley  
16 Aug 2016  Consultee Responses  Consultee Responses-1731368.pdf   EH- NOISE AND NUISANCE 
16 Aug 2016  Consultee Responses  Consultee Responses-1731501.pdf   LLFA COMMENTS 
18 Aug 2016  Public Comment - Objection  Public Comment - Objection-1733227.pdf
Public Comment - Objection-1733227 Thumbnails  
SYDNEY STREET AND DISTRICT RES. ASSOC. 
18 Aug 2016  Public Comment - Objection  Public Comment - Objection-1733239.pdf
Public Comment - Objection-1733239 Thumbnails  
MAITLAND CHAMBERS, 7 STONE BUILDINGS, LINCOLN'S INN 
19 Aug 2016  Public Comment - Objection  Public Comment - Objection-1734313.pdf   10 GuthrieStreet  
19 Aug 2016  Public Comment - Objection  Public Comment - Objection-1734315.pdf   14 Guthrie Street  
24 Aug 2016  Public Comment - Objection  Public Comment - Objection-1736287.pdf   The Chelsea Society  
25 Aug 2016  Public Comment - Objection  Public Comment - Objection-1736735.pdf   Flat 28 Pelham Court  
30 Aug 2016  Consultee Responses  Consultee Responses-1738172.pdf   EH- AIR QUALITY 
30 Aug 2016  Public Comment - Objection  Public Comment - Objection-1737996.pdf   48 Jubilee Place  
15 Oct 2016  Consultee Responses  Consultee Responses-1764603.pdf   GLA 
17 Oct 2016  Consultee Responses  Consultee Responses-1765285.pdf   COMMENTS FROM GLA 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711159.pdf   1848A_02_331_CONSTRUCTIONPHASING_PHASE1 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711161.pdf   1848A_02_332_CONSTRUCTIONPHASING_PHASE2 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711162.pdf   1848A_02_333_CONSTRUCTIONPHASING_PHASE3 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711164.pdf   1848A_02_334_CONSTRUCTIONPHASING_PHASE4 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711165.pdf   1848A_02_335_CONSTRUCTIONPHASING_PHASE5 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711166.pdf   1848A_02_336_CONSTRUCTIONPHASING_PHASE6 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711167.pdf   1848A_94_001_LANDSCAPEMASTERPLAN 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711168.pdf   1848A_94_002_ROOFSTRATEGY 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711169.pdf   1848A_94_003_AMENITYAREAS 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1711205.pdf   SITEWIDE LANDSCAPE SECTION A 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805346.pdf   1848A_02_105_PROPOSEDELEVATION_F_RETAILPAVILION_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805349.pdf   1848A_02_108_PROPOSEDELEVATION_J_GARDENBLOCK_ENTRANCE_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805350.pdf   1848A_02_109_PROPOSEDELEVATION_K_COURTYARDENTRANCE_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805351.pdf   1848A_02_110_PROPOSEDELEVATION_L_BRITTENSTREETSOUTH_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805352.pdf   1848A_02_111_PROPOSEDELEVATION_M_BRITTENSTREETEAST_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805353.pdf   1848A_02_112_PROPOSEDELEVATION_N_COURTYARDMEWSHOUSE_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805354.pdf   1848A_02_113_PROPOSEDELEVATION_P_NORTHCOURTYARD_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805366.pdf   1848A_02_209_PROPOSEDSECTION_J_SITEWIDE_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805370.pdf   1848A_02_210_PROPOSEDSECTION_K_SITEWIDETHROUGHCORES_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805371.pdf   1848A_02_211_PROPOSEDSECTION_L_GARDENBLOCK_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805374.pdf   1848A_02_302_DETAILELEVATION_RETAILPAVILION_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805379.pdf   1848A_02_304_DETAILELEVATION_MEWSHOUSE_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805381.pdf   1848A_02_305_DETAILELEVATION_GARDENBLOCK_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805382.pdf   1848A_02_306_DETAILELEVATION_GARDENBLOCK_SYDNEYSTREET_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805383.pdf   1848A_02_310_BRITTENSTREETBLOCK_BBG01_WHEELCHAIRCONVERSION_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805385.pdf   1848A_02_311_BRITTENSTREETBLOCK_BBG02_WHEELCHAIRCONVERSION_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805387.pdf   1848A_02_312_BRITTENSTREETBLOCK_BBLG01_WHEELCHAIRCONVERSION_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805389.pdf   1848A_02_313_BRITTENSTREETBLOCK_BBLG02_WHEELCHAIRCONVERSION_1.0 
17 Nov 2016  Drawing - Approved  Drawing - Approved-1805390.pdf   1848A_02_314_SISTERBLOCK_SB0103_0203_WHEELCHAIRCONVERSION_1.0 
17 Nov 2016  Public Comment - Objection  Public Comment - Objection-1783086.pdf   5  
28 Dec 2016  Revised Drawing  Revised Drawing-1805299.pdf   1848A_02_001_PODIUM_SITEWIDE_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805305.pdf   1848A_02_006_THIRDFLOOR_SITEWIDE_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805307.pdf   1848A_02_007_FOURTHFLOOR_SITEWIDE_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805312.pdf   1848A_02_011_PROPOSEDGROUNDFLOOR_BRITTENSTREETBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805314.pdf   1848A_02_013_PROPOSEDFIRSTFLOOR_BRITTENSTREETBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805315.pdf   1848A_02_014_PROPOSEDSECONDFLOOR_BRITTENSTREETBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805316.pdf   1848A_02_015_PROPOSEDTHIRDFLOOR_BRITTENSTREETBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805317.pdf   1848A_02_016_PROPOSEDFOURTHFLOOR_BRITTENSTREETBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805341.pdf   1848A_02_100_PROPOSEDELEVATION_A_SYDNEYSTREET_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805343.pdf   1848A_02_102_PROPOSEDELEVATION_C_BRITTENSTREET_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805344.pdf   1848A_02_103_PROPOSEDELEVATION_D_THAMESBROOK1_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805345.pdf   1848A_02_104_PROPOSEDELEVATION_E_THAMESBROOK2_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805347.pdf   1848A_02_106_PROPOSEDELEVATION_G_SISTERBLOCKSOUTH_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805348.pdf   1848A_02_107_PROPOSEDELEVATION_H_SISTERBLOCKNORTH_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805355.pdf   1848A_02_200_PROPOSEDSECTION_A_GARDENBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805356.pdf   1848A_02_203_PROPOSEDSECTION_D_GARDENSQUARE_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805358.pdf   1848A_02_205_PROPOSEDSECTION_F_BRITTENSTREET_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805373.pdf   1848A_02_301_DETAILELEVATION_BRITTENBLOCK_1.0 
28 Dec 2016  Revised Drawing  Revised Drawing-1805378.pdf   1848A_02_303_DETAILELEVATION_SISTERBLOCK_1.0 
28 Dec 2016  Revision Content  Revision Content-1805391.pdf   CGI VIEWS 
28 Dec 2016  Revision Content  Revision Content-1805392.pdf   CHELSEA FARMERS MARKET - DAS ADDENDUM PART 4 
28 Dec 2016  Revision Content  Revision Content-1805393.pdf   CHELSEA FARMERS MARKET - DRAINAGE RESPONSE LETTER (DECEMBER 2016) 
28 Dec 2016  Revision Content  Revision Content-1805394.pdf   CHELSEA FARMERS MARKET BASEMENT CONSTRUCTION METHOD STATEMENT (DECEMBER 2016) 
28 Dec 2016  Revision Content  Revision Content-1805395.pdf   CHELSEA FARMERS MARKET CONSTRUCTION MANAGEMENT PLAN REV 1 
28 Dec 2016  Revision Content  Revision Content-1805396.pdf   CHELSEA FARMERS MARKET DAD ADDENDUM PART 2 
28 Dec 2016  Revision Content  Revision Content-1805397.pdf   CHELSEA FARMERS MARKET DAS ADDENDUM PART 1 
28 Dec 2016  Revision Content  Revision Content-1805398.pdf   CHELSEA FARMERS MARKET DAS ADDENDUM PART 3 
28 Dec 2016  Revision Content  Revision Content-1805399.pdf   CHELSEA FARMERS MARKET DAS ADDENDUM PART 5 
28 Dec 2016  Revision Content  Revision Content-1805400.pdf   CHELSEA FARMERS MARKET SUNLIGHT, DAYLIGHT AND OVERSHADOWING REPORT 
28 Dec 2016  Revision Content  Revision Content-1805401.pdf   CHELSEA FARMERS MARKET_AQ ASSESSMENT REPORT REV 1 (DECEMBER 2016) 
28 Dec 2016  Revision Content  Revision Content-1805402.pdf   COVER LETTER 21.12.16 
28 Dec 2016  Revision Content  Revision Content-1805403.pdf   DRAWING REGISTER 
28 Dec 2016  Revision Content  Revision Content-1805404.pdf   TVIA PART 1 
28 Dec 2016  Revision Content  Revision Content-1805405.pdf   TVIA PART 2 
28 Dec 2016  Revision Content  Revision Content-1805406.pdf   TVIA PART 3 
28 Dec 2016  Revision Content  Revision Content-1805407.pdf   TVIA PART 4 
18 Jan 2017  Drawing  Drawing-1815516.pdf   BRITTEN STREET CGI ORIGINAL AS SUBMITTED JULY 2016 
30 Jan 2017  Public Comment - Objection  Public Comment - Objection-1837067.pdf   26 Lots Road  
01 Feb 2017  Public Comment - Objection  Public Comment - Objection-1838606.pdf   FLAT 4, 20 DANVERS STREET 
01 Feb 2017  Public Comment - Objection  Public Comment - Objection-1838607.pdf   8 Sydney Street  
13 Feb 2017  Public Comment - Objection  Public Comment - Objection-1845961.pdf
Public Comment - Objection-1845961 Thumbnails  
FURTHER OBJ 7 GUTHRIE STREET 
13 Feb 2017  Public Comment - Objection  Public Comment - Objection-1845997.pdf   FURTHER OBJ 8 GUTHRIE STREET 
15 Feb 2017  Public Comment - Objection  Public Comment - Objection-1846785.pdf
Public Comment - Objection-1846785 Thumbnails  
ATTACHMENT OBJ TO SYDNEY STREET RESIDENTS' ASSOCIATION 
15 Feb 2017  Public Comment - Objection  Public Comment - Objection-1846820.pdf   FURTHER FROM 43 SYDNEY STREET 
15 Feb 2017  Public Comment - Objection  Public Comment - Objection-1846822.pdf   78 Sydney Street  
03 Apr 2017  Public Comment - Support  Public Comment - Support-1871028.pdf   AURIENS 
11 Apr 2017  Public Comment - Objection  Public Comment - Objection-1875743.pdf   ATTACHMENT OBJ TO 12 DASKA HOUSE 
02 May 2017  Consultee Responses  Consultee Responses-1885692.pdf   DESIGN COMMENTS 
11 May 2017  Other  Other-1890939.pdf   LETTER FORM AGENT - REQUIRED CHANGES TO DRAWINGS 
11 May 2017  Photo  Photo-1890940.pdf   PROPOSED VIEW FINAL 
11 May 2017  Other  Other-1890942.pdf   DRAWING TITLE SHEET 
11 May 2017  Revised Drawing  Revised Drawing-1890957.pdf   1848A_02_105_PROPOSED ELEVATION_F_RETAIL PAVILION 
11 May 2017  Drawing  Drawing-1890958.pdf   1848A_02_106_PROPOSED ELEVATION_G_SISTER BLOCK SOUTH 
23 May 2017  Committee Report  Committee Report-1897317.pdf   REPORT (OFFICERS) 
24 May 2017  Public Comment - Objection  Public Comment - Objection-1897752.pdf   7 Paultons Square  
24 May 2017  Public Comment - Objection  Public Comment - Objection-1897753.pdf   26 Hans Place  
24 May 2017  Public Comment - Objection  Public Comment - Objection-1897754.pdf   26 Lots Road  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898814.pdf   FLAT 2, 31 KILBURN LANE 
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898672.pdf   3 Bellamy Street  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898679.pdf   United Settlement  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898684.pdf   34A Fernshaw Road  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898777.pdf   75 Wiltshire Close  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898779.pdf   114 Beaufort Street  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898786.pdf   Flat 35, Buckingham Court  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898788.pdf   49 Kensington Mansions  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898801.pdf   ABA International Ltd  
25 May 2017  Public Comment - General Comment  Public Comment - General Comment-1898805.pdf   123 Greencroft Gardens  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898808.pdf   27 Athelstan Road  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898810.pdf   13A Wetherby Mansions  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898811.pdf   151 Marsden Road  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898818.pdf   21D Gloucester Street  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898880.pdf   11 Weavers Terrace  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898881.pdf   28 Greaves Tower  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898882.pdf   Flat 38 Rosebery Square West  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898883.pdf   34a Fernshaw Road  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898885.pdf   319 Kennington Road  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898886.pdf   29 Wetherby Mansions  
25 May 2017  Public Comment - Objection  Public Comment - Objection-1898887.pdf   49a Kensington Mansions  
26 May 2017  Public Comment - Objection  Public Comment - Objection-1899218.pdf   26 RIDGMOUNT GARDENS  
26 May 2017  Public Comment - Objection  Public Comment - Objection-1899177.pdf   Kensington and Chelsea  
26 May 2017  Public Comment - Objection  Public Comment - Objection-1899178.pdf   flat g, 67 harrington gardens  
26 May 2017  Public Comment - General Comment  Public Comment - General Comment-1899179.pdf   Marilyn Virginia freelance Pr Social Media Consultant  
26 May 2017  Public Comment - General Comment  Public Comment - General Comment-1899216.pdf   15 Orchard Close  
26 May 2017  Public Comment - Objection  Public Comment - Objection-1899217.pdf   9 Princes Place  
30 May 2017  Public Comment - Objection  Public Comment - Objection-1900135.pdf   Elm Park Lane  
30 May 2017  Public Comment - Objection  Public Comment - Objection-1900136.pdf   9 Wallgrave Road  
30 May 2017  Public Comment - Objection  Public Comment - Objection-1900137.pdf   Flat 1, 199 New Kings Road  
31 May 2017  Committee Report  Committee Report-1901109.pdf   PRE COMMITTEE ADDENDUM REPORT 
02 Jun 2017  Public Comment - Objection  Public Comment - Objection-1902393.pdf   ADDENDUM SKETCHES 1-6 TO PREVIOUS OBJECTION FROM 12 DASKA HOUSE 
02 Jun 2017  Public Comment - Objection  Public Comment - Objection-1902503.pdf   Planning Committee member of the Chelsea Society for the Stanley Ward  
06 Jun 2017  Committee Report  Committee Report-1903646.pdf   POST COMMITTEE ADDENDUM REPORT 
08 Aug 2017  Report  Report-1936177.pdf   MAYOR STAGE 2 REPORT 
10 Nov 2017  Section 106  Section 106-1979555.pdf   DRAFT S106 10 NOVEMBER 2017 
10 Nov 2017  Section 106  Section 106-1979559.pdf   SCHEDULE 6 - ESTATE PROJECT 
10 Nov 2017  Section 106  Section 106-1979563.pdf   SCHEDULE 6 - PLAN SS1 
10 Nov 2017  Section 106  Section 106-1979566.pdf   SCHEDULE 6 - PLAN SS2 
10 Nov 2017  Section 106  Section 106-1979569.pdf   SCHEDULE 6 - PLAN SS3 
10 Nov 2017  Section 106  Section 106-1979572.pdf   SCHEDULE 6 - PLAN SS4 
10 Nov 2017  Section 106  Section 106-1979575.pdf   SCHEDULE 6 - PLAN SS5 
10 Nov 2017  Section 106  Section 106-1979578.pdf   SCHEDULE 6- PLAN SS6 
10 Nov 2017  Section 106  Section 106-1979581.pdf   SCHEDULE 6 - PLAN SS7 
10 Nov 2017  Section 106  Section 106-1979584.pdf   SCHEDULE 6 - PLAN SS8 
10 Nov 2017  Section 106  Section 106-1979587.pdf   SCHEDULE 6 - PLAN SS9 
10 Nov 2017  Section 106  Section 106-1979590.pdf   SCHEDULE 6 - PLAN SS10 
10 Nov 2017  Section 106  Section 106-1979595.pdf   SCHEDULE 6 - PLAN FW1 
10 Nov 2017  Section 106  Section 106-1979598.pdf   SCHEDULE 6 - PLAN FW2 
10 Nov 2017  Section 106  Section 106-1979601.pdf   SCHEDULE 6- PLAN FW3 
10 Nov 2017  Section 106  Section 106-1979604.pdf   SCHEDULE 6 -PLAN FW4 
10 Nov 2017  Section 106  Section 106-1979607.pdf   SCHEDULE 6 - PLAN FW5 
10 Nov 2017  Section 106  Section 106-1979610.pdf   SCHEDULE 6 - PLAN FW6 
10 Nov 2017  Revision Content Feb 2012  Revision Content Feb 2012-1979613.pdf   SCEHDULE 6 - PLAN FW7 
10 Nov 2017  Section 106  Section 106-1979616.pdf   SCHEDULE 6 - PLAN FW8 
10 Nov 2017  Section 106  Section 106-1979619.pdf   SCHEDULE 7- PLAN 1 
10 Nov 2017  Section 106  Section 106-1979622.pdf   SCHEDULE 7 - PLAN 2 
10 Nov 2017  Section 106  Section 106-1979625.pdf   SCHEDULE 7 - PLAN 4A 
10 Nov 2017  Section 106  Section 106-1979628.pdf   SCHEDULE 7 - PLAN 4B 
10 Nov 2017  Section 106  Section 106-1979631.pdf   SCHEDULE 7 - PLAN 4C 
10 Nov 2017  Section 106  Section 106-1979634.pdf   SCHEDULE 7 - PLAN 5 
10 Nov 2017  Section 106  Section 106-1979637.pdf   SCHEDULE 7 - PLAN 6 
10 Nov 2017  Section 106  Section 106-1979640.pdf   SCHEDULE 7 - PLAN 7 
14 Nov 2017  Section 106  Section 106-1980980.pdf   SCHEDULE 7- PLAN 3 
15 Nov 2017  Section 106  Section 106-1981293.pdf   SCHEDULE 6 - ESTATE PROJECT SCHEDULE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711038.pdf   1848A_00_001_EXISTINGGROUNDFLOORPLAN-SITEWIDE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711040.pdf   1848A_00_006_EXISTINGSITEPLAN_BOUNDARYLINE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711041.pdf   1848A_00_007_EXISTINGLOCATIONPLAN_BOUNDARYLINE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711043.pdf   1848A_00_010_EXISTINGGROUNDFLOORPLAN_RETAILSQUARE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711044.pdf   1848A_00_102_EXISTING_NORTHWESTELEVATION 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711045.pdf   1848A_00_103_EXISTING_NORTHEASTELEVATION 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711046.pdf   1848A_01_001_FABRICREMOVALGROUNDFLOORPLAN-SITEWIDE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711047.pdf   1848A_01_005_FABRICREMOVAL_SITEPLAN 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711048.pdf   1848A_01_010_FABRICREMOVALGROUNDFLOORPLAN_RETAILSQUARE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711049.pdf   1848A_01_102_FABRICREMOVAL_NORTHWESTELEVATION 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1711050.pdf   1848A_01_103_FABRICREMOVAL_NORTHEASTELEVATION 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805300.pdf   1848A_02_002_LOWERGROUND_SITEWIDE_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805301.pdf   1848A_02_003_PROPOSEDBASEMENT_SITEWIDE_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805302.pdf   1848A_02_004_FIRSTFLOOR_SITEWIDE_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805303.pdf   1848A_02_005_SECONDFLOOR_SITEWIDE_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805308.pdf   1848A_02_008_FIFTHFLOOR_SITEWIDE_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805309.pdf   1848A_02_009_ROOFPLAN_SITEWIDE_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805311.pdf   1848A_02_010_PROPOSEDLOCATION_ROOFPLAN_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805313.pdf   1848A_02_012_PROPOSEDLOWERGROUNDFLOOR_BRITTENSTREETBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805318.pdf   1848A_02_017_PROPOSEDROOFPLAN_BRITTENSTREETBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805320.pdf   1848A_02_020_PROPOSEDGROUNDFLOOR_GARDENBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805322.pdf   1848A_02_021_PROPOSEDLOWERGROUNDFLOOR_GARDENBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805324.pdf   1848A_02_023_PROPOSEDFIRSTFLOOR_GARDENBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805325.pdf   1848A_02_024_PROPOSEDSECONDFLOOR_GARDENBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805326.pdf   1848A_02_025_PROPOSEDTHIRDFLOOR_GARDENBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805327.pdf   1848A_02_026_PROPOSEDROOFPLAN_GARDENBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805328.pdf   1848A_02_030_PROPOSEDGROUNDFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805329.pdf   1848A_02_031_PROPOSEDLOWERGROUNDFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805331.pdf   1848A_02_033_PROPOSEDFIRSTFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805333.pdf   1848A_02_034_PROPOSEDSECONDFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805334.pdf   1848A_02_035_PROPOSEDTHIRDFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805335.pdf   1848A_02_036_PROPOSEDFOURTHFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805336.pdf   1848A_02_037_PROPOSEDFIFTHFLOOR_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805338.pdf   1848A_02_038_PROPOSEDROOFPLAN_SISTERBLOCK_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805339.pdf   1848A_02_040_PROPOSEDGROUNDFLOOR_RETAILPAVILION_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805340.pdf   1848A_02_041_PROPOSEDROOFPLAN_RETAILPAVILION_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1805342.pdf   1848A_02_101_PROPOSEDELEVATION_B_SYDNEYSTREET_1.0 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890943.pdf   1848A_02_001_PODIUM_SITEWIDE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890944.pdf   1848A_02_006_THIRD FLOOR_SITEWIDE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890946.pdf   1848A_02_007_FOURTH FLOOR_SITEWIDE 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890947.pdf   1848A_02_011_PROPOSED GROUND FLOOR BRITTEN STREET BLOCK 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890948.pdf   1848A_02_013_PROPOSED FIRST FLOOR_BRITTEN STREET BLOCK 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890949.pdf   1848A_02_014_PROPOSED SECOND FLOOR_BRITTEN STREET BLOCK 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890950.pdf   1848A_02_015_PROPOSED THIRD FLOOR_BRITTEN STREET BLOCK 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890951.pdf   1848A_02_016_PROPOSED FOURTH FLOOR_BRITTEN STREET BLOCK 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890952.pdf   1848A_02_100_PROPOSED ELEVATION_A_SYDNEY STREET 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890953.pdf   1848A_02_102_PROPOSED ELEVATION_C_BRITTEN STREET 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890955.pdf   1848A_02_103_PROPOSED ELEVATION_D_THAMESBROOK1 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890956.pdf   1848A_02_104_PROPOSED ELEVATION_E_THAMESBROOK2 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890959.pdf   1848A_02_107_PROPOSED ELEVATION_H_SISTER BLOCK NORTH 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890960.pdf   1848A_02_301_DETAIL ELEVATION_BRITTEN BLOCK 
17 Nov 2017  Drawing - Approved  Drawing - Approved-1890962.pdf   1848A_02_303_DETAIL ELEVATION_SISTER BLOCK 
17 Nov 2017  Decision  Decision-1982290.pdf   Decision Notice 
17 Nov 2017  Report  Report-1982291.pdf   Report (Officers)