Proposed development
|
***Amended description*** Demolition of existing buildings/structures to enable redevelopment of the site (Phase 3) with six blocks ranging from 4 to 15 storeys in height to provide between 368 and 370 residential dwellings (Use Class C3), with ground floor commercial space (Use Class E) and flexible community / commercial space (Use Class E/F.1/F.2); provision of a community centre with associated adventure playground (Use Class F.1/F.2) including up to 760 sq.m flexible floorspace including steel pan workshop (Use Class E/F.1/F.2), along with a community kitchen garden at roof level; and car and cycle parking, landscaping and public realm improvements.
***(Amendments include: internal alterations to building layouts and revised housing size mix resulting in an overall reduction from 373 - 377 homes to 368 - 370 homes, and increased number of larger wheelchair user homes; increased height and revised rear faτade of Blocks 5 and 10; revised highway layout to prevent access from Wornington Road to Ladbroke Grove / Barlby Road roundabout, and car parking, cycle parking and servicing changes; revised public realm and landscaping including retention of an additional tree and increased planting of new trees; introduction of a second staircase in Block 9A; changes to the ground floor floorspace, layout and arrangement of commercial and community uses in parts of Blocks 7, 8 and 10; and revisions to environmental sustainability details, as set out in revised drawings and technical reports)***
[APPLICATION ACCOMPANIED BY AN ENVIRONMENTAL STATEMENT FOR THE PURPOSES OF ENVIRONMENTAL IMPACT ASSESSMENT; MAJOR DEVELOPMENT; AND DEVELOPMENT AFFECTING THE SETTING OF CONSERVATION AREAS AND THE SETTING OF LISTED BUILDINGS]
A request for a hard copy of the Environmental Statement and Environmental Implications Letter can be made to CBRE to Ben Weldin-Berry ([email protected], 07788 753 683) and Rebecca Raby Smith ([email protected], 07886 756 105).á Please quote the
|