Property details

Case reference: PP/17/05495
Address: 60 Kensington Court, LONDON, W8 5DG
Ward:
Polling district:
Listed Building Grade: N/A
Conservation area: Kensington Court

Applicant details

Applicant's name: Napoleone
Applicant company name: Quinn Architects
Contact address: Quinn Architects Rochelle School Arnold Circus London E2 7ES

Proposal details

Application type: PP (Planning permission)
Proposed development Variation of condition 7 (materials) of planning permission 13/07097 (removal of the roof and internal load bearing walls, staircase and all partioning, retention of the front facade and part retention of the rear facade, remodelling of the existing pitched roof behind the retained gable to provide improved accommodation and extension to the roof of the rear to provide mansard roof at this level, infill of the existing rear light well at third and fourth floor levels and retention and renovation of the rear facade including replacement bay windows and modified fenestration design plus installation of air conditioning units at main roof level) subsequently granted on appeal . Request wording of condition is amended to clarify that works cannot proceed on relevant parts of development prior to approval of samples. This would aid the discharge of this condition as erection of the scaffold would allow for existing samples of high level brickwork and roof slates to be obtained to match new samples.
Date received: 28 Aug 2017
Registration date:
(Statutory start date)
29 Aug 2017
Public consultation ends: 22 Sep 2017
Application status: Decided
Target date for decision: 24 Oct 2017

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 24 Oct 2017
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun on or before 26 November 2017.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to the Local Planning Authority for approval in writing. The approved Statement shall be adhered to throughout the construction period. The Statement shall include provision for: the parking of vehicles of site operatives and visitors; the loading and unloading of plant and materials; the storage of plant and materials used in constructing the development; the erection and maintenance of a security hoarding; measures to control the emission of dust and dirt during construction; and a scheme for recycling/disposing of waste resulting from demolition and construction works.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with policies CT1 and CL5 of the Consolidated Local Plan.ÿ

4)

Before any demolition takes place, steps shall be taken to secure the safety and stability of those parts of the building to be retained as well as the neighbouring properties. Such steps shall, where necessary, include measures to strengthen any wall or vertical surface; to support any floor, roof or horizontal surface; and to provide protection for the building and adjacent properties against the weather during the progress of the works.
Reason - To ensure adequate safeguard to the structural integrity of property and neighbouring properties in accordance with policy CL5 of the Consolidated Local Plan.ÿ

5)

The works of demolition hereby permitted shall not be carried out before a contract for the carrying out of the works of redevelopment of the site has been let and a complete and final copy of the agreed contract has been submitted to the Council.
Reason - To preserve the character and appearance of the Conservation Area in accordance with Policy CL3 of the Consolidated Local Plan.

6)

Demolition or construction works shall not take place outside 0800 hours to 1800 hours Mondays to Fridays nor at any time on Saturdays, Sundays or Bank Holidays.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

7)

Full details of the materials to be used in the construction shall be submitted to the Local Planning Authority for approval in writing prior to the relevant part of the work being carried out and these works shall be carried out as approved. These details shall include: samples of all new brickwork including pointing and bond; technical specification of the air condensing units at main roof level; the design of the rear roof-light on the northfacing roof elevation; and samples of roof slates.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.

8)

No structures, other than those shown on the approved plans, shall be erected on the roof area of the extension hereby permitted. No part of this area shall be used as a balcony, roof garden or similar amenity area for the lifetime of the development.
Reason - To preserve the appearance of the property and character of the area in accordance with policies of the development plan, in particular policies CL1 and CL6 of the Consolidated Local Plan.

9)

No additional plumbing or pipes, other than black rainwater pipes shall be fixed to the external surfaces of the building.
Reason - To preserve the appearance of the building and the character of the area, in accordance with policies of the development plan in particular policies CL1 and CL6 of the Consolidated Local Plan.

10)

Details of the obscure glazing and restricted opening mechanism of the rear roof-light on the north-facing roof elevation shall be submitted to the Local Planning Authority for approval in writing before installation and the works shall be carried out, as approved, and permanently retained in the approved condition.
Reason - To preserve the appearance of the building and the character of the area and prevent any significant disturbance to residents of nearby properties, in accordance with policies of the development plan in particular policies CL1, CL5 and CL6 of the Consolidated Local Plan.

11)

Before the building is first occupied, details of how the condensing units are to be mounted and screened on their eastern flank shall be submitted the Local Planning Authority for approval in writing. These details shall include full details of the mounts that will be used to mitigate any structurally-bourn noise transmission and how the screening will match the nearby chimney stack brickwork pattern. All installed measures shall thereafter be maintained for the lifetime of the development.
Reason - To preserve the character and appearance of the property and conservation area and prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL1, CL5 and CL6 of the Consolidated Local Plan.

12)

Noise emitted by all building services plant operating together shall not exceed the existing lowest LA90 15min background noise level at any time when the plant is operating. Where the noise source has a tonal spectrum, it shall be -15dBA. Noise emitted shall be measured at 1m from the fa╪ade of the nearest residential premises and at 1.2m above the adjacent roof terrace at any time when the units are operating. All air conditioning equipment associated with the development hereby permitted shall thereafter be operated and retained in accordance with the manufacturer's instructions.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Consolidated Local Plan.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Borough Development.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2000 (as amended), and the grant of planning permission does not imply that such approval will be given. The Director of Building Control, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

5)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Rebecca Marshall
Planning team: Fast Track Team
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/17/05495