1)
The works hereby permitted shall be begun before the expiration of five years from the date of this consent (C201)
Reason - As required by Section 18 of the Planning (Listed Buildings and Conservation Areas Act) 1990, to avoid the accumulation of consents (R201)
2)
The works hereby permitted shall be carried out exactly and only in accordance with the drawings, and other particulars, forming part of the Consent, and there shall be no variation therefrom without the prior written approval of the local planning authority (C205)
Reason - In order to safeguard the special architectural or historic interest of the building (R205)
3)
All new works and works of making good to the retained fabric, whether internal or external, shall be finished to match the adjacent work with regard to the methods used and to colour, material, texture, and profile (C206)
Reason - In order to safeguard the special architectural or historic interest of the building (R205)
4)
New windows shall be timber, double hung, vertical sliding sashes and single glazed and so maintained. (C210)
Reason - In order to safeguard the special architectural or historic interest of the building (R205)
5)
Detailed drawings at scale 1:20 or samples of materials as appropriate, in respect of the following, shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun:
(a) any new architraves;
(b) any new doors;
(c) any new cornices;
(d) any new fireplaces. (C208)
Reason - In order to safeguard the special architectural or historic interest of the building (R205)
6)
The original doors from the stairwell at first and second floors shall be fixed shutand the architraves retained and boxed over if necessary.
Reason - In order to safeguard the special architectural or historic interest of the building. (R205)