Case reference: PP/22/06589
Address: 100 Old Church Street, LONDON, SW3 6EP
Ward: Stanley
Polling district: 18
Listed Building Grade: N/A
Conservation area: Chelsea Park/Carlyle

Applicant details

Applicant's name: PVG Design Ltd
Applicant company name: ADL Planning Pty Ltd
Contact address: 1 The Arbory Plumpton Lane Great Plumpton PR4 3NH

Proposal details

Application type: PP (Planning permission)
Proposed development Erection of replacement single-storey rear extension, erection of a basement below existing house and part of front and rear garden and provision of new garage door to rear.
Date received: 31 Oct 2022
Registration date:
(Statutory start date)
31 Oct 2022
Public consultation ends: 25 Nov 2022
Application status: Decided
Target date for decision: 26 Dec 2022

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 26 Jan 2023
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

External materials The development shall be carried out using external facing materials only as shown on the approved plans, and all new external brickwork shall match existing brickwork.
Reason - To ensure the completed development preserves the character and appearance of the Conservation Area.

4)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

5)

Construction Traffic Management Plan (CTMP) No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The statement should include: a) routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b) access arrangements to the site; c) the estimated number and type of vehicles per day/week; d) details of any vehicle holding area; e) details of the vehicle call up procedure; f) estimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development; h) work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development; i) details of measures to protect pedestrians and other highway users from construction activities on the highway; and j) where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan. A one page summary of the requirements of the approved CTMP shall be affixed to the frontage of the site for the duration of the works at a location where it can be read by members of the public.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Local Plan 2019.ÿ It is necessary for the condition to be on the

6)

Professional management of engineering works No development shall commence until (A) a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed for the duration of building works and their appointment confirmed in writing to the Local Planning Authority, and (B) the name, and contact details of the person supervising engineering and construction on site for the duration of building works have been confirmed in writing to the Local Planning Authority.ÿ In the event that either the Appointed Engineer or Appointed Supervisor cease to perform that role for whatever reason before the construction works are completed, those works shall cease until a replacement chartered engineer of the afore-described qualification or replacement supervisor has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer and supervisor are at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan

7)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

8)

Small-scale ground gas and vapour condition A. No development shall commence (other than demolition above ground level) until an appropriate ground gas investigation is undertaken and a GVI report [where necessary incorporating a Remediation Strategy (RS)], is submitted to, and approved in writing by, the local planning authority. B. No occupation or use of the development shall commence until the approved RS is implemented and a Verification Report (VR) is submitted to, and approved in writing by, the local planning authority. Where physical remedial measures are implemented to protect end-users of the development they shall be maintained. The GVI, GVI Report, RS, VR and any unexpected contamination identified during the GVI and development shall be addressed in line with the Council's contaminated land guidance for small-scale ground gas and vapour protection.
Reason - To ensure any risks from ground gas and vapours and other contamination are minimised, to comply with the NPPF and development plan policies and in particular policy CE7 of the Local Plan 2019.

9)

Trees - lopping and topping For the duration of works the tree(s) existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.

10)

Suitable Pump Device The development hereby permitted shall not be occupied until a suitable pump device is installed.
Reason - To prevent sewer flooding, reduce flood risk and to contribute to sustainability in accordance with policy CL7 of the Local Plan 2019.

Informatives:

1)

Conditions - Precedent to Commencement
Conditions no(s) 4, 5, 6 and 7 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

2)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

3)

Unique text
The applicant is reminded that the final Construction Traffic Management Plan should clarify that all access for construction vehicles will be from the front of the site.

4)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:24 Jan 2023
Venue:The Council Chamber
Report item number:S006

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: June Taylor
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/22/06589