!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/23/00179
Address: Park Walk Primary School, Park Walk, LONDON, SW10 0AY
Ward: Stanley
Polling district: 18
Listed Building Grade: 2
Conservation area: N/A

Applicant details

Applicant's name: RB of Kensington and Chelsea
Applicant company name: 3BM Studio
Contact address: The Leather Market Unit LM07 G01 Weston Street London SE1 3ER

Proposal details

Application type: PP (Planning permission)
Proposed development Renewal of existing surface finishes (rubber crumb and artificial grass) and relocation of 1no. pedestrian access gate (altered position from PP/21/06981 and LB/21/06982).
Date received: 09 Jan 2023
Registration date:
(Statutory start date)
11 Jan 2023
Public consultation ends: 10 Feb 2023
Application status: Decided
Target date for decision: 08 Mar 2023

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 24 Mar 2023
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Black painted railings The railings hereby approved shall be painted black, and so maintained.
Reason - To preserve the appearance of the building and the character of the area and to safeguard the special architectural or historic interest and heritage significance of the building, in accordance with policies of the development plan in particular policies CL1, CL4 and CL6 of the of the Local Plan 2019.

4)

Sustainable Drainage Systems Strategy No development shall commence until a Sustainable Drainage Systems Strategy with the following information is submitted to and approved in writing by the Local Planning Authority: A detailed analysis of surface water run-off and attenuation volume (to demonstrate how the proposed measures will aim to comply with Local Plan Policy CE2 (g), which is to achieve a reduction of 50% of existing rates including climate change in the calculations and factoring in all flows into the sewer system including groundwater or other flows). Information about the proposed SuDS types, their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. (More sustainable green SuDS should be favoured over attenuation tanks). Section/profile drawings of the SuDS, if relevant (green roofs, blue roofs, sub-base attenuation, permeable paving, planters, species, etc.). Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS and any connections to the sewer system if necessary. During construction of the development hereby permitted the approved Sustainable Drainage System (SuDS) and Flood Risk measures shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2018 (as amended), and the grant of planning permission does not imply that such approval will be given. The District Surveyor, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

4)

Category 3 development
This development has been categorised as Category 3 for the purposes of the Council's Code of Construction Practice, so does not require a condition securing a Checklist or Site Construction Management Plan (SCMP). You are reminded that the Code still applies to building works at the site with regard to working hours and other site practices, and you are advised to review the Code to be aware of its objectives https://www.rbkc.gov.uk/environment/code-construction-practice

5)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

6)

Unique text
The applicant is strongly encouraged to enhance the biodiversity of the new external surface finishes hereby approved through the incorporation of soft landscaping such as additional planting, hedges and trees.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:21 Mar 2023
Time:18:30
Venue:Committee Room 1
Report item number:S023

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Ben Brockey
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/00179