Property details

Case reference: PP/23/03625
Address: 18 Bury Walk, LONDON, SW3 6QB
Ward: Stanley
Polling district: 18
Listed Building Grade: 2
Conservation area: Chelsea

Applicant details

Applicant's name: A Pakenham
Applicant company name:
Contact address: 18 Bury Walk London Kensington And Chelsea SW3 6QB

Proposal details

Application type: PP (Planning permission)
Proposed development Erection of 2.11m high wall with entrance door in it, which is level with the street and adjacent to neighbouring wall at 20 Bury Walk, to enlarge internal garden space, remove off-street parking space, and gain more security
Date received: 01 Jun 2023
Registration date:
(Statutory start date)
01 Jun 2023
Public consultation ends: 07 Jul 2023
Application status: Decided
Target date for decision: 27 Jul 2023

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 28 Jul 2023
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings Other than set out in condition 3 of this approval, the development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Submission of details (Full PP) Notwithstanding the approved plans as set out in condition 2 detailed drawings in respect of the following shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun, and the works shall not be carried out other than in accordance with the details so approved and shall thereafter be so maintained: (a) Elevational and sectional drawings (scale 1:10) of the entrance door. The door should be of vertical aligned timber panels.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

4)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2018 (as amended), and the grant of planning permission does not imply that such approval will be given. The District Surveyor, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

5)

Party Wall Act 1996
You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining property freeholders and leaseholders and anyone who has had an interest of 12 months or greater, where the building owner intends to carry out work which involves: Work involving an existing shared wall with another property; Building on the boundary with another property; Excavating near a neighbouring building, and that work falls within the scope of the Act Notice should be served on neighbours at least one month before commencement of building works. Section 12(1) of the Act provides for the developer to provide security for neighbours through insurance or a security bond. Procedures under this Act are separate from the need for planning permission and for building regulations approval. Further guidance is available at: Party Wall Act 1996

6)

Category 3 development
This development has been categorised as Category 3 for the purposes of the Council's Code of Construction Practice, so does not require a condition securing a Checklist or Site Construction Management Plan (SCMP). You are reminded that the Code still applies to building works at the site with regard to working hours and other site practices, and you are advised to review the Code to be aware of its objectives https://www.rbkc.gov.uk/environment/code-construction-practice

7)

Unique text
Technical Approval in accordance with the Design Manual for Roads and Bridges CG 300 will be required for any structural works/alterations/repairs to structures over, under or adjacent to the public highway. The procedures only grant approval under the Highways Act 1980 (as amended.) The granting of planning permission and building consent does not imply that such approval is given. Please contact the Directorate of Transport and Regulatory Services for advice on 020 7361 3001 or email [email protected]

8)

GTD/No pre-app/Amendmts to comply Est. G
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered, although not used in this instance. On first submission the proposals did not comply with guidance, but improvements suggested by the planning authority were adopted by the applicant.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Ben Brockey
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/03625