1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of the original permission granted under ref. PP/19/05200.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Accord with approved CTMP
The development shall not be carried out except in accordance with the approved Construction Traffic Management Plan by Sequoia Consulting dated 11 January 2023.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties, in accordance with the Basements SPD and policies CT1, CL5 and CL7 of the Local Plan 2019.
4)
Professional management of engineering works
Construction shall be carried out under the supervision of Martin Shortt or John Harrison of Harrison Shortt Structural Engineers Ltd as confirm in writing by the applicant.
In the event that either the Appointed Engineer or Appointed Supervisor cease to perform that role for whatever reason before the construction works are completed, those works shall cease until a replacement chartered engineer of the afore-described qualification or replacement supervisor has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer and supervisor are at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Local Plan 2019.
5)
Considerate Constructors Scheme (CCS)
Compliance with the CCS has been demonstrated by the applicant through the submission of a certificate of registration. These details must be clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Local Plan 2019.
6)
Code of Construction Practice
Development shall be done in compliance with the Code of Construction Checklist and Site Construction Management Plan (SCMP) for the development that has been approved in writing by the Council's Construction Management Team, and then
[The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002]ÿ
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019.
7)
Lightwell grille - Black painted
The grilles to the lightwell shall be painted black, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL6 of the of the Local Plan 2019.
8)
Trees - lopping and topping
For the duration of works the tree(s) existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.