1)
Unique text
The Remedial Strategy did mention that a radon resistant membrane would be installed. The Verification Report should include evidence of the membrane being installed and fully compliance with the relevant standards and regulations (e.g. Building certificate that confirms the membrane was installed) and should be submitted to and approved by the Local Planning Authority prior to the first occupation/use of the development in accordance with Condition 7(b).