Property details

Case reference: PP/23/05713
Address: Elm Park House, Fulham Road, LONDON
Ward: Stanley
Polling district: 18
Listed Building Grade: N/A
Conservation area: N/A

Applicant details

Applicant's name: Royal Borough of Kensington and Chelsea
Applicant company name: Royal Borough of Kensington and Chelsea
Contact address: The Royal Borough of Kensington and Chelsea Mezzanine West 37 Pembroke Road London W8 6PW

Proposal details

Application type: PP (Planning permission)
Proposed development Demolition of existing timber external walls and construction of new solid walls; replacement of existing single glazed UPVC windows with double glazed UPVC windows; new side access doors; use of premises as meeting space for residents and ancillary storage; extending existing metal fencing; and installation of side gates
Date received: 29 Aug 2023
Registration date:
(Statutory start date)
08 Sep 2023
Public consultation ends: 24 Nov 2023
Application status: Decided
Target date for decision: 03 Nov 2023

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 12 Jan 2024
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing or as specified in the application, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.

4)

Hours of operation - Any day The use shall not be carried out other than between 0800 hours and 1800 hours, on any day.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.

5)

The premises shall be used only for the purposes specified in the application, and for no other purpose including any other purpose within Class F of the Town and Country Planning (Use Classes) Order 1987, as amended. (C058)
Reason - The Local Planning Authority considers that use for any other purpose would be detrimental to the amenity of the area and its residents.

6)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

Informatives:

1)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

2)

Unique text
The responsibility to properly address contaminated land issues, including safe development and secure occupancy, and irrespective of any involvement by the Royal Borough, lies with the owner/developer of the site. The applicant/developer is requested to contact the Council's Contaminated Land Officer (Pollution Regulatory Team) (Tel: 020 7361 3002 email: [email protected]) as soon as is practicable should contamination be encountered during the development of the site. Contamination will often be evident either visually or from odours. Visual evidence of contamination may include staining by oil/fuel, coloured liquids/soils uncharacteristic of soil or groundwater, or debris (e.g. asbestos) being present. Odours will usually be obvious and smell of fuels/solvents, be pleasant or unpleasant, or otherwise be uncharacteristic of soil or groundwater.ÿ It is the responsibility of the developer to ensure that they comply with the requirements of Contaminated Land, Health & Safety, Waste Management, the Control of Asbestos and Environmental Damage Regulations.

3)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:09 Jan 2024
Venue:The Council Chamber
Report item number:S130

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: John Asiamah
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012