Planning Search

Back to search results

Property details

Case reference: PP/23/07181
Address: 21 St Luke's Street, LONDON, SW3 3RP
Ward: Stanley
Polling district: 18
Listed Building Grade:
Conservation area: Chelsea

Applicant details

Applicant's name: F Gomes
Applicant company name: Ansham Associates Ltd
Contact address: 1 Pancras Square King's Cross LONDON N1C 4AG

Proposal details

Application type: PP (Planning permission)
Proposed development Variation of condition 2 (compliance with approved drawings) of planning permission 21/07642 to allow an enabling works phase to provide a temporary rear roof forming a garden floor (shown in new drawing 1921DWG020 Rev A) to enable the occupation of the dwelling during the construction phase.
Date received: 02 Nov 2023
Registration date:
(Statutory start date)
08 Nov 2023
Public consultation ends: 08 Dec 2023
Application status: Decided
Target date for decision: 03 Jan 2024

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 03 Jan 2024
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from 04/02/2022 of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

4)

Sustainable Drainage Systems Strategy No development shall commence until a Sustainable Drainage Systems Strategy with the following information is submitted to and approved in writing by the Local Planning Authority: Sustainable Drainage Systems (SuDS) A detailed analysis of surface water run-off and attenuation volume (to demonstrate how the proposed measures will aim to comply with Local Plan Policy CE2 (g), which is to achieve a reduction of 50% of existing rates including climate change in the calculations and factoring in all flows into the sewer system including groundwater or other flows). Information about the proposed SuDS types, their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. (More sustainable green SuDS should be favoured over attenuation tanks). Section/profile drawings of the SuDS, if relevant (green roofs, blue roofs, sub-base attenuation, permeable paving, planters, species, etc.). Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS and any connections to the sewer system if necessary. During construction of the development hereby permitted the approved Sustainable Drainage System (SuDS) shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

5)

Roof Terrace - Black painted railings The railings to the roof terrace shall be painted black, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL6 of the of the Local Plan 2019.

6)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.

7)

Trees - lopping and topping For the duration of works the tree(s) existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.

8)

Limited period (Temporary Works) Within one month of the introduction of the temporary works, the applicant shall confirm, in writing, to the Local Planning Authority that the permission has been implemented and the date on which that occurred. The permitted temporary works in this planning permission shall be in operation only for a limited period of 6 months from the confirmed date of the implementation, after which the temporary works must be removed unless a further planning permission has been granted in the meantime.
Reason - To ensure the temporary works are only used for the time period as specified within the approved documents and that if the works are to be in place for longer the Local Planning Authority are able to assess any prolonged impacts this may cause to the amenity of the area in accordance with the Local Plan.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Conditions - Precedent to Commencement
Conditions no(s) 3 & 4 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

5)

GTD/No pre-app/Amendmts to comply Est. G
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered, although not used in this instance. On first submission the proposals did not comply with guidance, but improvements suggested by the planning authority were adopted by the applicant.

6)

Unique text
The responsibility to properly address contaminated land issues, including safe development and secure occupancy, and irrespective of any involvement by the Royal Borough, lies with the owner/developer of the site. No contaminated land condition is recommended for this planning application as the chance of significant contamination being found with the potential to cause harm is considered to be low. Despite this the owner or developer of the property may wish to consider contaminated land issues further before development work starts. Based on this information, observations made during groundworks or as a precaution, the developer should consider whether measures should be taken to investigate or address possible contamination issues. This may, for example, involve undertaking a more detailed unexploded ordnance assessment, undertaking historical searches or investigation work or providing enhanced ground gas and vapour protection. The applicant/developer is requested to contact the Royal Borough's Contaminated Land Officer (Environmental Quality Unit) (Tel: 020 761 3002 email: [email protected]) as soon as is practicable should contamination be encountered during the development of the site. Contamination will often be evident either visually or from odours. Visual evidence of contamination may include staining by oil/fuel, coloured liquids/soils uncharacteristic of soil or groundwater, or debris (e.g. asbestos) being present. Odours will usually be obvious and smell of fuels/solvents, be pleasant or unpleasant, or otherwise be uncharacteristic of soil or groundwater. Where land contamination is found during the course of the development, we would recommend that an appropriate level of desk study research and investigation work is undertaken to identify and assess risks from land contamination. Guidance on land contamination planning issues is available from the Council's website. It is the responsibility of the developer to ensure that they comply with the requirements of Contaminated Land, Health & Safety, Waste Management, the Control of Asbestos and Environmental Damage Regulations. The responsibility to properly address contaminated land issues, including safe development and secure occupancy, and irrespective of any involvement by the Royal Borough, lies with the owner/developer of the site.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: John Asiamah
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/07181