1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Code of Construction Practice
No development shall commence until:
An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then
B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record.
The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.
4)
Sustainable Drainage Systems Strategy
No development shall commence until a Sustainable Drainage Systems Strategy with the following information is submitted to and approved in writing by the Local Planning Authority:
A detailed analysis of surface water run-off and attenuation volume (to demonstrate how the proposed measures will aim to comply with Local Plan Policy CE2 (g), which is to achieve a reduction of 50% of existing rates including climate change in the calculations and factoring in all flows into the sewer system including groundwater or other flows).
Information about the proposed SuDS types, their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. (More sustainable green SuDS should be favoured over attenuation tanks).
Section/profile drawings of the SuDS, if relevant (green roofs, blue roofs, sub-base attenuation, permeable paving, planters, species, etc.).
Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS and any connections to the sewer system if necessary.
During construction of the development hereby permitted the approved Sustainable Drainage System (SuDS) and Flood Risk measures shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.
5)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
6)
Sash windows and doors in painted timber
External windows and doors hereby permitted other than the proposed rear extension shall be timber framed and painted, with the windows being double hung, white painted, sliding sashes, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
7)
Windows and doors of the rear extension in painted metal
External windows and doors of the proposed rear extension hereby permitted shall be metal framed and white painted, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
8)
Dormer windows
The cheeks of the dormer windows shall be clad in lead and be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Local Plan 2019.
9)
Conservation rooflights
The rooflight(s) shall be of a traditional conservation type, flush with the roof and slim framed, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
10)
Trees - lopping and topping
For the duration of works the tree(s) existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned other than any plants and trees to be relocated or planted as shown on the approved drawings, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.
11)
Contamination - Unexpected
If during development, contamination not previously identified is found to be present at the site, development work shall cease and not be recommenced until a report indicating the nature of the contamination and how it is to be dealt with has been submitted to, and approved in writing by, the local planning authority.ÿThe approved measures shall be implemented in full.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Local Plan 2019, and to accord withÿ CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).