!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/23/08127
Address: Coleridge Square, 9 Coleridge Gardens, LONDON, SW10 0RT
Ward: Stanley
Polling district: 18
Listed Building Grade: 2
Conservation area: College of St. Mark and St. John

Applicant details

Applicant's name: L Nesti
Applicant company name: ADL Planning Pty Ltd
Contact address: 1 The Arbory Plumpton Lane Great Plumpton PR4 3NH

Proposal details

Application type: PP (Planning permission)
Proposed development Internal alterations and provision of condenser unit at third floor level
Date received: 08 Dec 2023
Registration date:
(Statutory start date)
08 Dec 2023
Public consultation ends: 26 Jan 2024
Application status: Decided
Target date for decision: 02 Feb 2024

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 05 Feb 2024
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Noise emission Noise emitted by the air conditioning condensing unit hereby permitted shall not increase the lowest existing measured background LA90(15min) level measured or predicted at 1.0m from the nearest residential window and/or at a height of 1.2m above any adjacent residential garden, terrace, balcony or patio at any time when the plant is operating. The plant shall be serviced regularly in accordance with manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is unable to comply with this Condition, they shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.ÿ

4)

Anti-vibration All plant and equipment shall be supported on adequate proprietary anti-vibration mounts as necessary to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter. If at any time the plant is unable to comply with this Condition, it shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.ÿ

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

3)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

4)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Cheryl Collins
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/08127