!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/23/01176
Address: 10 Norland Square, LONDON, W11 4PX
Ward: Norland
Polling district: 11
Listed Building Grade: 2
Conservation area: Norland

Applicant details

Applicant's name: O'Connor
Applicant company name: ADL Planning Pty Ltd
Contact address: 1 The Arbory Plumpton Lane Great Plumpton PR4 3NH

Proposal details

Application type: PP (Planning permission)
Proposed development Replacement of the dilapidated trellis with a new timber trellis to the boundary with 11 Norland Square along the raised ground floor terrace and garden steps at 10 Norland Square
Date received: 17 Feb 2023
Registration date:
(Statutory start date)
17 Feb 2023
Public consultation ends: 17 Mar 2023
Application status: Decided
Target date for decision: 14 Apr 2023

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 14 Apr 2023
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Application of Wood Stain The Osmo woodstain "Basalt Grey" shall be applied to the entire trellis structure within 1 month of the date of the commencement of the works to install the approved trellis and shall thereafter be maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.

Informatives:

1)

Conditions - Precedent to Commencement
Conditions no(s) ****** impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

4)

Listed Building Reminder on Enforcement
You are reminded that no work should commence on implementing this Listed Building Consent until all matters, samples, and details reserved by condition have been submitted to, and approved by, this local planning authority. It is an offence to carry out work to a Listed Building unless all such conditions have been complied with. Any proposed departure from the works specified in the approved drawings should be brought to the attention of the planning department for further consideration before the work is carried out. The Council will use its enforcement powers, including use of Breach of Condition Notices or Prosecution, to ensure compliance with conditions and prevent harm to the special historic character and historic interest of Listed Buildings. You are advised that there is currently a maximum fine of o20,000 if the offence is dealt with summarily, and if the offence is dealt with by indictment the fine is unlimited.

5)

Retain Original Fabric of Building
You are reminded that the original historic fabric of the listed building should be retained unless specifically authorised for removal by the Council as part of a listed building consent. Historic fabric which must be retained would include lath and plaster ceilings and walls, floor boards, original skirting boards, dado rails, cornice, fireplaces, staircases, and any other surviving historic fabric. Where these elements are in poor condition, repair and restoration could be undertaken by competent workmen, with the minimum amount of intervention to the historic fabric. You are reminded that the installation of recessed ceiling lights and speakers in most cases will require listed building consent. Any proposals for these particular works must be first approved by the Council as part of a listed building consent before they are installed within the listed building. Use the following link to see how advice can be obtained: Planning Advice Service Advice can be sought if a problem has occurred during consented works, but it is clearly preferable to seek advice at as early a stage as possible.

6)

Mortar Mix
The appropriate mortar mix, profile and colour of pointing are crucial in preserving and enhancing the character and appearance of buildings in conservation areas and other areas of the Royal Borough of Kensington and Chelsea. Inappropriate mortar mix and profile can lead to future deterioration of brickwork, and weatherstruck pointing should normally be avoided. Guidance on how best to re-point your building can be obtained through our planning advice service: Planning Advice Service

7)

Party Wall Act 1996
You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining property freeholders and leaseholders and anyone who has had an interest of 12 months or greater, where the building owner intends to carry out work which involves: Work involving an existing shared wall with another property; Building on the boundary with another property; Excavating near a neighbouring building, and that work falls within the scope of the Act Notice should be served on neighbours at least one month before commencement of building works. Section 12(1) of the Act provides for the developer to provide security for neighbours through insurance or a security bond. Procedures under this Act are separate from the need for planning permission and for building regulations approval. Further guidance is available at: Party Wall Act 1996

8)

Category 3 development
This development has been categorised as Category 3 for the purposes of the Council's Code of Construction Practice, so does not require a condition securing a Checklist or Site Construction Management Plan (SCMP). You are reminded that the Code still applies to building works at the site with regard to working hours and other site practices, and you are advised to review the Code to be aware of its objectives https://www.rbkc.gov.uk/environment/code-construction-practice

9)

GTD/No pre-app/Amendmts to comply Est. G
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered, although not used in this instance. On first submission the proposals did not comply with guidance, but improvements suggested by the planning authority were adopted by the applicant.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Alexandra Lee
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/01176