1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
Except for that which is required as part of Condition No. 6, the development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
4)
Sash windows in painted timber
The window/windows hereby permitted shall be timber framed, white painted, double hung, sliding sashes, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Local Plan 2019.
5)
Porous surfaces
All external hard surfacing in the development shall be constructed using porous materials and so maintained thereafter. If any permeable surfaces are removed, they must be replaced only with permeable surfaces.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan 2019.
6)
Changes to rear and replacement of 2 x windows
Notwithstanding any details shown on drawings hereby permitted and as listed within condition No. 2, this permission relates only to the alterations at rear ground floor level, replacement of the front ground floor level window and replacement of the rear side return first floor level bathroom window and no other works and or alterations.
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.