1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Submission of details (Full PP)
No development shall commence until full particulars of the following have been submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Materials and finishses to be used on the external faces of the building, including the roof and details of windows/doors including sections, a brick smaple panel should be constructed on site so the type of brick and pointing can be assessed.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
4)
Construction Traffic Management Plan (CTMP)
No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority.ÿ The statement should include:
a)ÿ routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway;
b)ÿ access arrangements to the site;
c)ÿ the estimated number and type of vehicles per day/week;
d)ÿ details of any vehicle holding area;
e)ÿ details of the vehicle call up procedure;
f)ÿÿ estimates for the number and type of parking suspensions that will be required;
g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development;
h)ÿ work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development;
i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway;
j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and
k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements.
The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that "No development shall commence until" as
5)
Removal of crossover
The dwellings hereby approved shall not be occupied until the crossover has been removed, the footway in front of the siteÿhas been reinstated in materials matching those of the existing footway, a replacement pedestrian dropped kerb installed to the east of the position of the existing crossover and the process to modify the Traffic Management Order to extend the on street parking bay has been initiated.
Reason:- To maintain the quality of the footway, to protect the Borough's streetscape and to mitigate the impact on on-street parking demand in accordance with CT1 (b)(g) & CR4 (a)(g).
6)
Professional management of engineering works
No development shall commence until a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed to supervise the construction works throughout their duration and their appointment confirmed in writing to the Local Planning Authority. In the event that the appointed engineer ceases to perform that role for whatever reason before the construction works are completed those works will cease until a replacement chartered engineer of the afore-described qualification has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer is at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
7)
Considerate Constructors Scheme (CCS)
No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
8)
Sustainable Urban Drainage System (SuDS) (for major and minor applications - implementation)
During construction of the development hereby permitted the submitted Sustainable Urban Drainage System (SuDS) shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Consolidated Local Plan.
9)
Provide refuse storage prior to occupation
The development shall not be occupied until the refuse storage facilities shown on the approved plans have been fully implemented and made available for immediate use. The refuse storage facilities shall thereafter be retained for use at all times.
Reason - To ensure the adequate provision of refuse storage space, in accordance with policies of the development plan in particular policy CE3 of the Consolidated Local Plan.
10)
Provide cycle storage prior to occupation
The development shall not be occupied until the cycle storage facilities indicated on the approved plans have been fully implemented and made available for immediate use. The cycle facilities shall thereafter be retained for use at all times.
Reason - To ensure the safe and sustainable movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.
11)
Energy Performance
The building shall achieve Level 4 of the Code for Sustainable Homes equivalent in relation to energy performance only and none shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 equivalent for this criterion has been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.
12)
Water Efficiency
The dwelling(s) shall achieve compliance with optional requirement G2 (2) (b) and none shall be occupied until Building Regulations approval has been issued for it certifying that these criteria have been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Core Strategy.
13)
Contamination - Unexpected
If during development, contamination not previously identified is found to be present at the site, development work shall cease and not be recommenced until a report indicating the nature of the contamination and how it is to be dealt with has been submitted to, and approved in writing by, the local planning authority.ÿThe approved measures shall be implemented in full.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan, and to accord withÿ CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).