Property details

Case reference: PP/16/05131
Address: 4, 5 and 6 Dilke Street, LONDON, SW3 4JE
Ward: Royal Hospital
Polling district: 16
Listed Building Grade: N/A
Conservation area: Royal Hospital

Applicant details

Applicant's name: The Zamek Group
Applicant company name: Carver Haggard Architects
Contact address: Unit 209 241-251 Ferndale Road London SW9 8BJ

Proposal details

Application type: PP (Planning permission)
Proposed development Demolition of dwellinghouses at 4, 5 and 6 Dilke Street comprising of four units and erection of replacement building with basement accommodating four residential units in the form of No1 4-bedroom single dwelling house at 6 Dilke Street, and No3 residential flats (1x2 bedroom at 5 Dilke Street and 2x1 bedroom at 4a and 4b Dilke Street)
Date received: 03 Aug 2016
Registration date:
(Statutory start date)
10 Aug 2016
Public consultation ends: 16 Sep 2016
Application status: Decided
Target date for decision: 05 Oct 2016

Decision details

This case has not yet been decided.

Decision: Permission granted, SUBJECT to S.106 ag.
Decision date: 06 Jan 2017
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Submission of details (Full PP) No development shall commence until full particulars of the following have been submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved: (a) Materials and finishses to be used on the external faces of the building, including the roof and details of windows/doors including sections, a brick smaple panel should be constructed on site so the type of brick and pointing can be assessed.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

4)

Construction Traffic Management Plan (CTMP) No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority.ÿ The statement should include: a)ÿ routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b)ÿ access arrangements to the site; c)ÿ the estimated number and type of vehicles per day/week; d)ÿ details of any vehicle holding area; e)ÿ details of the vehicle call up procedure; f)ÿÿ estimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development; h)ÿ work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development; i)ÿÿ details of measures to protect pedestrians and other highway users from construction activities on the highway; j)ÿ a strategy for coordinating the connection of services on site with any programme work to utilities upon adjacent land; and k)ÿ where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Consolidated Local Plan.ÿ It is necessary for the condition to be on the basis that "No development shall commence until" as

5)

Removal of crossover The dwellings hereby approved shall not be occupied until the crossover has been removed, the footway in front of the siteÿhas been reinstated in materials matching those of the existing footway, a replacement pedestrian dropped kerb installed to the east of the position of the existing crossover and the process to modify the Traffic Management Order to extend the on street parking bay has been initiated.
Reason:- To maintain the quality of the footway, to protect the Borough's streetscape and to mitigate the impact on on-street parking demand in accordance with CT1 (b)(g) & CR4 (a)(g).

6)

Professional management of engineering works No development shall commence until a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed to supervise the construction works throughout their duration and their appointment confirmed in writing to the Local Planning Authority. In the event that the appointed engineer ceases to perform that role for whatever reason before the construction works are completed those works will cease until a replacement chartered engineer of the afore-described qualification has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer is at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

7)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Consolidated Local Plan 2015. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

8)

Sustainable Urban Drainage System (SuDS) (for major and minor applications - implementation) During construction of the development hereby permitted the submitted Sustainable Urban Drainage System (SuDS) shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Consolidated Local Plan.

9)

Provide refuse storage prior to occupation The development shall not be occupied until the refuse storage facilities shown on the approved plans have been fully implemented and made available for immediate use. The refuse storage facilities shall thereafter be retained for use at all times.
Reason - To ensure the adequate provision of refuse storage space, in accordance with policies of the development plan in particular policy CE3 of the Consolidated Local Plan.

10)

Provide cycle storage prior to occupation The development shall not be occupied until the cycle storage facilities indicated on the approved plans have been fully implemented and made available for immediate use. The cycle facilities shall thereafter be retained for use at all times.
Reason - To ensure the safe and sustainable movement of traffic on neighbouring highways, in accordance with policies of the development plan in particular policy CT1 of the Consolidated Local Plan.

11)

Energy Performance The building shall achieve Level 4 of the Code for Sustainable Homes equivalent in relation to energy performance only and none shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 equivalent for this criterion has been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Consolidated Local Plan.

12)

Water Efficiency The dwelling(s) shall achieve compliance with optional requirement G2 (2) (b) and none shall be occupied until Building Regulations approval has been issued for it certifying that these criteria have been achieved.
Reason - To ensure that the development contributes to the attainment of sustainable development and to comply with policy CE1 of the Core Strategy.

13)

Contamination - Unexpected If during development, contamination not previously identified is found to be present at the site, development work shall cease and not be recommenced until a report indicating the nature of the contamination and how it is to be dealt with has been submitted to, and approved in writing by, the local planning authority.ÿThe approved measures shall be implemented in full.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Consolidated Local Plan, and to accord withÿ CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Borough Development, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Borough Development.

4)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2000 (as amended), and the grant of planning permission does not imply that such approval will be given. The Director of Building Control, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

5)

Unique text
The applicant is advised that the final CTMP required by condition 4 must address the following points; Q7 - The lack of any engagement with local stakeholders in respect of the CTMP is disappointing and the final CTMP must demonstrate that any feedback received as part of the planning application process has been considered and dealt with appropriately; Q10 - It needs to be clearly stated that the undertaking on the timings of vehicle movements applies to all vehicles related to the site and not just skip lorries as currently seems to be the case; Q11 - Drawing no.151-10-003 does not show the proposed temporary highway arrangement as stated but in fact shows vehicle swept paths; Q14 - Further detail is required on how ready mixed concrete would be delivered in to the site. For instance would it be pumped or poured? This will determine the on-street set up required during these deliveries; Q19 - The applicant needs to provide information on the number of daily vehicle movements that would generated during each phase. The accuracy of the dimensions stated for skip lorries is also queried and should be checked by the applicant.

6)

Unique text
Technical Approval in accordance with the Design Manual for Roads and Bridges BD2/12 will be required for any structural works/alterations/repairs to structures over, under or adjacent to the public highway.ÿ The procedures only grant approval under the Highways Act. The granting of planning permission and building consent does not imply that such approval is given.ÿ Please contact the Directorate of Transportation and Highways for advice on 02073415220 or email [email protected].

7)

Planning Obligation
In granting this permission the Council has had regard to Planning Obligation(s) under Section 106 of the Town and Country Planning Act 1990, as amended.

8)

Party Wall Act 1996
You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining property freeholders and leaseholders and anyone who has had an interest of 12 months or greater, where the building owner intends to carry out work which involves: Work involving an existing shared wall with another property; Building on the boundary with another property; Excavating near a neighbouring building, and that work falls within the scope of the Act Notice should be served on neighbours at least one month before commencement of building works. Section 12(1) of the Act provides for the developer to provide security for neighbours through insurance or a security bond. Procedures under this Act are separate from the need for planning permission and for building regulations approval. Further guidance is available at: Party Wall Act 1996

9)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:22 Nov 2016
Report item number:S103

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Katie Parsons