Property details

Case reference: PP/22/04076
Address: 44 Pottery Lane, LONDON, W11 4LZ
Ward: Norland
Polling district: 11
Listed Building Grade: N/A
Conservation area: Norland

Applicant details

Applicant's name: Crosthwaite
Applicant company name: urban future organization london
Contact address: 23 Hill Court London W5 3DF

Proposal details

Application type: PP (Planning permission)
Proposed development Construction of a single-storey basement extension featuring a front open lightwell and rear lightwell with walk-on rooflights.
Date received: 01 Jul 2022
Registration date:
(Statutory start date)
05 Jul 2022
Public consultation ends: 29 Jul 2022
Application status: Decided
Target date for decision: 30 Aug 2022

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 01 Sep 2022
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.

4)

Construction Traffic Management Plan (CTMP) No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The statement should include: a) routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b) access arrangements to the site; c) the estimated number and type of vehicles per day/week; d) details of any vehicle holding area; e) details of the vehicle call up procedure; f) estimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development; h) work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development; i) details of measures to protect pedestrians and other highway users from construction activities on the highway; and j) where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan. A one page summary of the requirements of the approved CTMP shall be affixed to the frontage of the site for the duration of the works at a location where it can be read by members of the public.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Local Plan 2019.ÿ It is necessary for the condition to be on the

5)

Professional management of engineering works No development shall commence until (A) a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed for the duration of building works and their appointment confirmed in writing to the Local Planning Authority, and (B) the name, and contact details of the person supervising engineering and construction on site for the duration of building works have been confirmed in writing to the Local Planning Authority.ÿ In the event that either the Appointed Engineer or Appointed Supervisor cease to perform that role for whatever reason before the construction works are completed, those works shall cease until a replacement chartered engineer of the afore-described qualification or replacement supervisor has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer and supervisor are at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan

6)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

7)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

8)

Flood Risk Assessment/Sustainable Drainage Systems Strategy No development shall commence until the following additional information is submitted to and approved in writing by the Local Planning Authority: Flood Risk Specification of the suitable pump device to protect the basement from sewer flooding. Surface Water Drainage Strategy Information about the proposed SuDS types: geocellular attenuation tank, rainwater harvesting system and permeable paving. This information should cover: their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. Section/profile drawings of all the SuDS. Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS, their outflows, flow control devices and any connections to the sewer system if necessary. During construction of the development hereby permitted the approved Sustainable Drainage System (SuDS) and Flood Risk measures shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.ÿ It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

9)

Small scale ground gas and vapour condition: a) No development shall commence (save for demolition above ground level ) until an appropriate ground gas investigation is undertaken and a GVI report [where necessary incorporating a Remediation Strategy (RS)] is submitted to and approved in writing by the Local Planning Authority. B) No occupation or use of the development shall commence until the approved RS is implemented and a Verification Report (VR) is submitted to and approved in writing by the local planning authority. Where physical remedial measures are implemented to protect end users of the development they shall be maintained. The GVI, GVI Report, RS, VR, and any unexpected contamination identified during the GVI and development shall be addressed in line with the Council's contaminated land guidance for small scale ground gas and vapour protection.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Local Plan 2019. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

Informatives:

1)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

2)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

3)

Conditions - Precedent to Commencement
Conditions no(s) ****** impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

4)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

5)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

6)

Unique text
The applicant is advised that the final CTMP to be submitted as part of the discharge of the condition and prior to the implementation of the development, should address the following feed back provided by RBKCs Transportation Planners, in relation to the currently submitted draft CTMP. This is as follows: A draft CTMP is submitted. This appears to have benefited from the previous pre-app advice; however, the document is unwieldy and contains a lot of superfluous & repetitive information. The applicant should be reminded a CTMP is an enforceable planning document and should be concise, relevant and unambiguous. A suitable pre-commencement condition is required to secure an acceptable final CTMP Q7 - The last three paragraphs are not required Q8 - All that is required is the routing description Q10 - Again much of the information is simply repeated Q11 - Again much repetition. The drawings on pages 9 & 10 are not required, the drawings at the end of the document are sufficient Q12 - If the answer is yes, then that is all that is required Q18 - Greater detail of the types of vehicles per day for each phase are required The applicant is strongly advised to examine other approved CTMPs to gain an idea of good practice

7)

Unique text
Highways Technical Approval - Separate Approval Technical Approval in accordance with the Design Manual for Roads and Bridges BD2/12 will be required for any structural works/alterations/repairs to structures over, under or adjacent to the public highway. The procedures only grant approval under the Highways Act. The granting of planning permission and building consent does not imply that such approval is given. Please contact the Directorate of Transportation and Highways for advice on 02073415220 or emailÿ[email protected]

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Ronaldo Colalillo
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/22/04076