1)
Time limit
The works hereby granted shall be begun before the expiration of three years from the date of this consent.
Reason - As required by Section 18 of the Planning (Listed Buildings and Conservation Areas Act) 1990, to avoid the accumulation of consents.
2)
Work to match retained fabric
All new works and works of making good to the retained fabric, whether internal or external, shall be finished to match the adjacent work with regard to the methods used and to colour, material, texture, and profile.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
3)
Retention of fabric
All existing fabric including existing wall and ceiling plasterwork shall be retained, unless notated otherwise on the drawings approved under this consent.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
4)
Demolition - Hand tools
No demolition work shall be carried out except by hand or using hand held tools and no power driven tools of any description shall be used in connection with the demolition works.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
5)
Pipework
No plumbing or pipes other than rainwater pipes shall be fixed on the external faces of the building other than those shown on the drawings forming part of this consent.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.
6)
Partitions
All partitions hereby granted consent shall be of lightweight construction, easily removable, and be so maintained.
Reason:- To preserve the special architectural character and heritage significance of the listed building and comply with Policy CL4 of the Consolidated Local Plan.
7)
Services/ pipes
All rainwater goods/guttering shall be black painted cast metal and so maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Consolidated Local Plan.