1)
Time limit
The works hereby granted shall be begun before the expiration of three years from the date of this consent.
Reason - As required by Section 18 of the Planning (Listed Buildings and Conservation Areas Act) 1990, to avoid the accumulation of consents.
2)
Compliance with drawings
The works forming the subject of this consent shall not be carried out except in complete accordance with the details shown on submitted plans and shall be so maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building .
3)
Submission of details
Notwithstanding the details on the approved drawings, detailed drawings or samples of materials as appropriate, in respect of the following, shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun, and the works shall not be carried out other than in accordance with the details so approved and shall thereafter be so maintained:
detailed elevation (scale 1:10) and section (scale 1:5) drawings of all new windows (including any stone detailing) and the new roof light;
detailed elevation (scale 1:10) and section (scale 1:5) drawings of all new doors and architraves;
detailed elevation (scale 1:10) and section (scale 1:5) drawings of the proposed railings to the rear Juliet balcony;
detailed drawings of showing all existing and proposed service runs and vents / flues / grilles and any associated alterations to the existing fabric;
detailed plans showing proposed internal lighting;
detailed internal elevation and section drawings of the proposed kitchen furniture and fittings at the lower ground floor level, including their relationship with the existing windows, skirting boards and architraves;
detailed plans and section (scale 1:5) drawings of all existing and proposed floors and coverings (including any underfloor heating systems), including their construction, build-up and relationship with skirting boards and architraves;
details of all proposed external finishing materials
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
4)
Work to match retained fabric
All new works and works of making good to the retained fabric, whether internal or external, shall be finished to match the adjacent work with regard to the methods used and to colour, material, texture, and profile.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
5)
Services/ pipes
All rainwater goods/guttering shall be black painted cast metal and so maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
6)
Partitions
All partitions hereby granted consent shall be of lightweight construction, easily removable, and be so maintained.
Reason:- To preserve the special architectural character and heritage significance of the listed building and comply with Policy CL4 of the Local Plan 2019.
7)
Sash windows and doors in painted timber
External windows and doors hereby permitted shall be timber framed and painted, with the windows being single glazed, white painted, sliding sashes, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policy CL4 of the Consolidated Local Plan.
8)
Relocation of existing internal shutters
Following their removal from the rear doorway (upper ground floor level), the existing internal shutters shall be installed within their approved position prior the occupation of the building and shall thereafter be maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
9)
Brick bond, pointing and mortar
Where openings to the main building are to be in-filled, the brickwork bond shall match the original bond on the building; and the pointing profile shall match the original profile on the building. The mortar must be lime based (NHL as per EN459) with no cement content.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
10)
External railings
All external railings shall be painted black and so maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
11)
Retention of ceiling rose
Notwithstanding the details on the approved drawings, the existing ceiling rose within the front room at the upper ground floor level shall be retained in its current position and thereafter maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
12)
Retention of fabric
All existing fabric including existing wall and ceiling plasterwork, cornices, skirting boards, skirting boards, doors, architraves, windows, shutters, panelling, fireplaces, staircases, railings, joists, floorboards, etc shall be retained, unless notated otherwise on the drawings approved under this consent.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.
13)
Damp-proofing works not approved
Notwithstanding the details on the approved drawings, no damp-proofing works shall be carried out at this property. The damp-proofing works referred to within the application documents do not form part of this approval.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building and comply with policy CL4 of the Local Plan 2019.