Property details

Case reference: PP/20/04339
Address: 13 St Ann's Villas & Flat A, 13 St Ann's Villas, LONDON, W11 4RT
Ward: Norland
Polling district: 11
Listed Building Grade: 2
Conservation area: Norland

Applicant details

Applicant's name: Moquette
Applicant company name: Savills
Contact address: 33 Margaret Street LONDON W1G 0JD

Proposal details

Application type: PP (Planning permission)
Proposed development Demolition and replacement of garden outbuilding in rear garden
Date received: 31 Jul 2020
Registration date:
(Statutory start date)
08 Sep 2020
Public consultation ends: 16 Oct 2020
Application status: Decided
Target date for decision: 03 Nov 2020

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 03 Nov 2020
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings Except for the details required by condition 7 the development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Protection of trees during construction - Details required No development shall commence until full particulars of the method(s) by which all existing trees on the site and adjacent land are to be protected during site preparation, demolition, construction, landscaping, and other operations on the site including erection of hoardings, site cabins, or other temporary structures, shall be submitted to and approved in writing by the local planning authority and the development shall be carried out only in accordance with the details so approved.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Consolidated Local Plan. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

4)

Trees and landscaping - Details required No development shall commence until a scheme of landscaping, to include all existing trees and shrubs and proposed trees shrubs and paths and their surfacing materials, has been submitted to and approved in writing by the local planning authority, and the development shall only be carried out and maintained in accordance with the details so approved.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019 ÿIt is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

5)

Trees - lopping and topping For the duration of works the tree(s) existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.

6)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

7)

Flood Risk Assessment/Sustainable Drainage Systems Strategy No development shall commence until a Flood Risk Assessment and Sustainable Drainage Systems Strategy with the following information is submitted to and approved in writing by the Local Planning Authority: Flood Risk Assessment (FRA) A Flood Risk Assessment to analyse all potential flood risks to the site and ensure that the development is protected against flood risk and will not lead to off-site flooding. Any proposed protection, mitigation and resilience measures should be shown on submitted plans. Sustainable Drainage Systems (SuDS) A detailed analysis of surface water run-off and attenuation volume (to demonstrate how the proposed measures will aim to comply with Local Plan Policy CE2 (g), which is to achieve a reduction of 50% of existing rates including climate change in the calculations and factoring in all flows into the sewer system including groundwater or other flows). Information about the proposed SuDS types, their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. (More sustainable green SuDS should be favoured over attenuation tanks). Section/profile drawings of the SuDS, if relevant (green roofs, blue roofs, sub-base attenuation, permeable paving, planters, species, etc.). Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS and any connections to the sewer system if necessary. During construction of the development hereby permitted the approved Sustainable Drainage System (SuDS) and Flood Risk measures shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.ÿ It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the po

8)

Submission of details Detailed drawings in respect of the following, shall be submitted to and approved in writing by the local planning authority before the relevant part of the work is begun, and the works shall not be carried out other than in accordance with the details so approved and shall thereafter be so maintained: (a) Detailed elevation drawings (1:10) and sections (1:5) of proposed windows and doors, to include lantern rooflights.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Conditions - Precedent to Commencement
Conditions nos 3, 4, 6 and 7 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

5)

Listed Building Reminder on Enforcement
You are reminded that no work should commence on implementing this Listed Building Consent until all matters, samples, and details reserved by condition have been submitted to, and approved by, this local planning authority. It is an offence to carry out work to a Listed Building unless all such conditions have been complied with. Any proposed departure from the works specified in the approved drawings should be brought to the attention of the planning department for further consideration before the work is carried out. The Council will use its enforcement powers, including use of Breach of Condition Notices or Prosecution, to ensure compliance with conditions and prevent harm to the special historic character and historic interest of Listed Buildings. You are advised that there is currently a maximum fine of o20,000 if the offence is dealt with summarily, and if the offence is dealt with by indictment the fine is unlimited.

6)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2018 (as amended), and the grant of planning permission does not imply that such approval will be given. The District Surveyor, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

7)

Unique text
The responsibility to properly address contaminated land issues, including safe development and secure occupancy, and irrespective of any involvement by the Royal Borough, lies with the owner/developer of the site. No contaminated land condition is recommended for this planning application as the chance of significant contamination being found with the potential to cause harm is considered to be low. Despite this the owner or developer of the property may wish to consider contaminated land issues further before development work starts. Based on this information, observations made during groundworks or as a precaution, the developer should consider whether measures should be taken to investigate or address possible contamination issues. This may, for example, involve undertaking a more detailed unexploded ordnance assessment, undertaking historical searches or investigation work or providing enhanced ground gas and vapour protection. The applicant/developer is requested to contact the Royal Borough's Contaminated Land Officer(Environmental Quality Unit) (Tel: 020 761 3002 email: [email protected]) as soon as is practicable should contamination be encountered during the development of the site. Contamination will often be evident either visually or from odours. Visual evidence of contamination may include staining by oil/fuel, coloured liquids/soils uncharacteristic of soil or groundwater, or debris (e.g. asbestos) being present. Odours will usually be obvious and smell of fuels/solvents, be pleasant or unpleasant, or otherwise be uncharacteristic of soil or groundwater. Where land contamination is found during the course of the development, we would recommend that an appropriate level of desk study research and investigation work is undertaken to identify and assess risks from land contamination. Guidance on land contamination planning issues is available from the Council's website. It is the responsibility of the developer to ensure that they comply with the requirements of Contaminated Land, Health & Safety, Waste Management, the Control of Asbestos and Environmental Damage Regulations. The responsibility to properly address contaminated land issues, including safe development and secure occupancy, and irrespective of any involvement by the Royal Borough, lies with the owner/developer of the site.

8)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Stephanie Malik
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012