Property details

Case reference: PP/22/05929
Address: 33 Norland Square, LONDON, W11 4PU
Ward: Norland
Polling district: 11
Listed Building Grade: 2
Conservation area: Norland

Applicant details

Applicant's name: Maurice
Applicant company name: Mishcon Jackson Architects
Contact address: 1 Pembridge Studios 27A Pembridge Villas Notting Hill LONDON W11 3EP

Proposal details

Application type: PP (Planning permission)
Proposed development Construction of two-storey rear infill extension with double-height full width sliding glass doors, a glass balustrade at raised ground floor level and a rooflight. Replacement of all sash windows with thermally insulated replicas of original. Internal alterations to lower ground floor layout.
Date received: 30 Sep 2022
Registration date:
(Statutory start date)
30 Sep 2022
Public consultation ends: 28 Oct 2022
Application status: Decided
Target date for decision: 25 Nov 2022

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 08 Mar 2023
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

4)

Flood Risk Assessment/Sustainable Drainage Notwithstanding condition 2, no development shall commence until a SuDS strategy with the following information is submitted to and approved in writing by the Local Planning Authority: SuDS A detailed analysis of surface water run-off and attenuation volume (to demonstrate how the proposed measures will aim to comply with Policy CE2 (g), which is to achieve a reduction of 50% of existing rates including climate change in the calculations and factoring in all flows into the sewer system including groundwater or other flows). Information about the proposed SuDS types, their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. (More sustainable green SuDS should be favoured over attenuation tanks). Section/profile drawings of the SuDS if relevant (green roofs, blue roofs, sub-base attenuation, permeable paving, planters, species, etc.). Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS and any connections to the sewer system if necessary. During construction of the development hereby permitted the approved Sustainable Drainage System (SuDS) and Flood Risk measures shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Conditions - Precedent to Commencement
Conditions no.s 3 and 4 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

5)

Listed Building Reminder on Enforcement
You are reminded that no work should commence on implementing this Listed Building Consent until all matters, samples, and details reserved by condition have been submitted to, and approved by, this local planning authority. It is an offence to carry out work to a Listed Building unless all such conditions have been complied with. Any proposed departure from the works specified in the approved drawings should be brought to the attention of the planning department for further consideration before the work is carried out. The Council will use its enforcement powers, including use of Breach of Condition Notices or Prosecution, to ensure compliance with conditions and prevent harm to the special historic character and historic interest of Listed Buildings. You are advised that there is currently a maximum fine of o20,000 if the offence is dealt with summarily, and if the offence is dealt with by indictment the fine is unlimited.

6)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme required amendments during the application to comply with relevant Local Plan Policies.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Douglas Payne
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/22/05929