Property details

Case reference: PP/24/00742
Address: 36 Royal Crescent, LONDON
Ward: Norland
Polling district: 11
Listed Building Grade: 2*
Conservation area: Norland

Applicant details

Applicant's name: R Ward
Applicant company name: Town Planning Bureau
Contact address: The Barn 43 Oakdene Road Redhill RH1 6BT

Proposal details

Application type: PP (Planning permission)
Proposed development Demolish part of third floor rear outrigger, extend and alter lower and upper rear outrigger, infill extension adjacent to rear outrigger and associated internal changes
Date received: 05 Feb 2024
Registration date:
(Statutory start date)
07 Feb 2024
Public consultation ends: 08 Mar 2024
Application status: Decided
Target date for decision: 03 Apr 2024

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 03 Apr 2024
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Sustainable Urban Drainage System (SuDS) (for major and minor applications - implementation) During construction of the development hereby permitted the submitted Sustainable Urban Drainage System (SuDS) shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan 2019.

4)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

5)

Archaeology - Watching brief to be agreed No development shall take place until arrangements have been made for an archaeological "watching brief" to monitor development groundworks and to record any archaeological evidence revealed. These arrangements shall be submitted to, and approved in writing by, the local planning authority, and the development shall take place only in accordance with the detailed scheme so approved.
Reason - To minimise any damage to any archaeological remains that may exist on site and to ensure satisfactory recording in accordance with policy CL4 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

Informatives:

1)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

2)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

3)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

4)

Unique text
Due to the small-scale nature of the works, under best practice guidance MoL SPG 'The Control of Dust and Emissions from Construction & Demolition Sites' and the IAQM's 'Assessment of dust from demolition and construction' the site would be determined as 'Low Risk' with regards to dust impacts. Any Environmental Management Plans, Construction Management Plans or Construction Traffic Management Plans should reference these guidance documents and include a list of the appropriate mitigation measures to be utilised on site where necessary. The physical onsite inspection for the generation of dust and soiling effects will be sufficient in this case when utilised alongside other mitigation measures.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Sarah Winter-Irving
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012