1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from 09/12/2022, being the date of the original permission granted under ref. PP/22/06231.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Sustainable Drainage
The development shall be carried out fully in accordance with the sustainable urban drainage measures set out in the approved Flood Risk Assessment.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan.
4)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
5)
Code of Construction Practice
The development shall be carried out in accordance with the Appendix A Checklist and SCMP of Condition 5 from planning permission reference PP/22/06231 approved by the Council's Construction Management Team on 12/04/2023.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties, in accordance with the Basements SPD and policies CT1, CL5 and CL7 of the Local Plan 2019.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019.
6)
Accord with approved CTMP
The development shall be carried out in strict accordance with the Construction Traffic Management Plan approved under ref. CON/23/00197 dated 17/02/2023.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties, in accordance with the Basements SPD and policies CT1, CL5 and CL7 of the Local Plan 2019.
7)
Professional management of engineering works -Compliance
The development shall be carried out in accordance with the letter of appointment (approved under ref. CON/23/01889, dated 26/04/2023) signed by Christopher Arkins, CEng, MIStructE -Director on behalf of SYMMETRYS LIMITED.
In the event that either the Appointed Engineer or Appointed Supervisor cease to perform that role for whatever reason before the construction works are completed, those works shall cease until a replacement-chartered engineer of the afore-described qualification or replacement supervisor has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer and supervisor are at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Local Plan 2019.
8)
Protection of trees during construction - Compliance
The development hereby approved shall be carried out in strict accordance with the tree protection details under ref. CON/23/01889, dated 26/04/2023.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.
9)
Trees and landscaping details - Compliance
The development hereby approved shall be carried out in accordance with the details under ref. CON/23/03749, dated 1st August 2023, and shall be so maintained.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.
10)
Planting and replanting
All tree and shrub planting forming part of the plans and details approved through this planning permission shall be carried out in the first planting and seeding season following the first occupation of the development or the completion of the development whichever is the sooner. Any trees or shrubs which, within a period of five years from the first planting and seeding season referred to above, die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species.
Reason - To protect the appearance and amenity of the area and to accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.
11)
Odours from swimming pool ventilation/ filtration equipment
Fumes or odours expelled from any flue serving the hygiene plant or providing ventilation to the swimming pool area shall not be detectable at the property boundary. If at any time the extraction plant is determined by the local planning authority to be failing to comply with this condition, it (or the source equipment) shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
12)
Sash windows and doors in painted timber
External windows and doors hereby permitted shall be timber framed and painted, with the windows being double hung, white painted, sliding sashes, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
13)
Conservation rooflights
The rooflight(s) shall be of a traditional conservation type, flush with the roof and slim framed, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
14)
Roof Material - Natural slates
The roof slope(s) of the building(s)/extension hereby permitted shall be clad in natural slates, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Local Plan 2019.
15)
Obscure Glazing
The ground floor side elevation windows hereby permitted shall be constructed using only obscured glazing, and shall be so maintained. (C092)
Reason - To safeguard the amenity of neighbouring property, and in particular to prevent overlooking. (R091)
16)
Sewer flooding
Prior to first occupation of the basement hereby approved, the basement shall be fitted with a positively pumped device designed to remove sewer floodwater from the building, which shall be maintained and functional at all times.
Reason - To protect the building from sewer flooding, in accordance with policies CE2 and CL7 of the Local Plan 2019.
17)
Canopy Details
Prior to installation of the external canopy to the side passageway, further details of the appearance and materiality of the canopy shall be submitted to and approved in writing by the Local Planning Authority. The development must be constructed in accordance with the approved details and maintained thereafter.
Reason - To ensure the proposal is of a high standard of design to preserve the character and appearance of the Holland Park Conservation Area, to comply with Local Plan 2019 Policy CL3.