1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Construction Traffic Management Plan (CTMP)
No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The statement should include:
a) routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway;
b) access arrangements to the site;
c) the estimated number and type of vehicles per day/week;
d) details of any vehicle holding area;
e) details of the vehicle call up procedure;
f) estimates for the number and type of parking suspensions that will be
required;
g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development;
h) work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the
development;
i) details of measures to protect pedestrians and other highway users from construction activities on the highway; and
j) where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements.
The development shall be carried out in accordance with the approved Construction Traffic Management Plan. A one page summary of the requirements of the approved CTMP shall be affixed to the frontage of the site for the duration of the works at a location where it can be read by members of the public.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Local Plan 2019.ÿ It is necessary for the condition to be on the
4)
Professional management of engineering works
No development shall commence until
(A) a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed for the duration of building works and their appointment confirmed in writing to the Local Planning Authority, and
(B) the name, and contact details of the person supervising engineering and construction on site for the duration of building works have been confirmed in writing to the Local Planning Authority.ÿ
In the event that either the Appointed Engineer or Appointed Supervisor cease to perform that role for whatever reason before the construction works are completed, those works shall cease until a replacement chartered engineer of the afore-described qualification or replacement supervisor has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer and supervisor are at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan
5)
Considerate Constructors Scheme (CCS)
No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
6)
Code of Construction Practice
No development shall commence until:
A)An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then
B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record.
C) Acoustic screening to prevent noise disturbance and a wrap around the building to prevent the spreading of dust are implemented.
The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.
7)
Contamination - preliminary risk assessment report and proposed site investigation
No development shall commence until a Preliminary Risk Assessment (PRA) and a Proposed Intrusive Site Investigation Design (PSID) for the site and surrounding area are submitted to, and approved in writing by, the local planning authority [The PRA and PSID shall be prepared in accordance with the Environment Agency's current Land Contamination Risk Management Guidance and the Council's guidance or any subsequent updates].
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Local Plan 2019. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
8)
Contamination - Site investigation and quantitative risk assessment and remediation strategy
No development shall commence (except for demolition above ground level) until the approved Proposed Intrusive Site Investigation Design (PSID) has been fully implemented and a report including full details of the intrusive site investigation, Risk Assessment (RA), an Options Appraisal (OA) and a Remediation Strategy (RS) has been submitted to, and approved in writing by, the local planning authority [The intrusive site investigation, RA, OA, RS and any associated reporting shall be undertaken in line with the Environment Agency's current Land Contamination Risk Management Guidance and the Council's guidance or any subsequent updates].
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Local Plan 2019, and to accord with CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing). It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
9)
Contamination - Unexpected
A. If during development work unexpected contamination or ground conditions are encountered or suspected, on each occasion development work shall cease in the affected area, other than for actions to make the area safe and prevent further contamination or pollution occurring. Unexpected contamination shall be reported to the Council within 2 working days or as soon as possible if there are significant risks to people or the environment.
B. Further Intrusive Site Investigation (FSI) shall be undertaken and a Remediation Statement (RS), addressing the unexpected contamination, shall be submitted to and approved in writing by the local planning authority. The FSI and RS shall include full details of requirements for ongoing monitoring and maintenance and be prepared in line with the Environment Agency's current Land Contamination Risk Management Guidance and Council's guidance or any subsequent updates.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Local Plan 2019, and to accord withÿ CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).
10)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
11)
Conservation rooflights
The rooflight(s) shall be of a traditional conservation type, flush with the roof and slim framed, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.
12)
Grilles - Black Painted Metal
All external grilles hereby approved shall be black painted metal and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL6 of the Local Plan 2019.
13)
Sustainable Urban Drainage System (SuDS) (for major and minor applications - implementation)
During construction of the development hereby permitted the submitted Sustainable Urban Drainage System (SuDS) (Ref. Sustainable Drainage Systems (SUDS) Report for Planning) shall be fully implemented and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan 2019.
14)
Sewer Flooding
Prior to the first occupation of the basement hereby approved, the basement shall e fitted with a positively pumped device designed to remove sewer floodwater from the building, which shall be maintained and be functional at all times.
Reason - To protect the site from sewer flooding in accordance with policies CE2 and CL7 of the Local Plan 2019.
15)
Trees - lopping and topping
For the duration of works the tree(s) existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.