1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Code of Construction Practice
No development shall commence until:
An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then
B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record.
The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.
4)
Arboricultural Impact Assessment - Compliance
The development shall be carried out in accordance with the approved Arboricultural Impact Assessment, prepared by Simon Pryce Arboriculture dated 12 August 2023, and shall be so maintained.
Reason - To ensure the proposals have an acceptable impact on trees in the Borough, in accordance with policy CR6 of the Local Plan 2019.
5)
Noise from building services plant and vents
Noise emitted by all building services plant shall be -10dBA below the existing measured lowest LA90(15min) background noise level at any time when all plant is in use, where the plant noise source is tonal it shall be -15dBA. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential window or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The equipment shall be serviced regularly in accordance with manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is unable to comply with this Condition, it shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
6)
Anti-vibration mounts for air-conditioning/ extraction equipment
The plant shall not operate unless it is supported on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
7)
Noise mitigation measures compliance
In order to comply with condition 5, the noise mitigation measures, of the performance and specification as described in the Noise Impact Assessment (prepared by Clement Acoustics Limited, dated 1st August 2022 Ref: 17734-NIA-01_RevA) shall be adopted and implemented in full.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.