!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/23/06538
Address: 14 Drayton Gardens, LONDON, SW10 9SA
Ward: Redcliffe
Polling district: 15
Listed Building Grade: 2
Conservation area: Boltons

Applicant details

Applicant's name: Aitken
Applicant company name: Smith Jenkins Ltd
Contact address: 3rd FloorThe News Building London Bridge Street London SE1 9SG

Proposal details

Application type: PP (Planning permission)
Proposed development Internal refurbishment, extension to rear closet wing, alterations to roof with replacement rooflights and sliding rooflight, replacement double glazed windows at closet wing and third floor, external air-conditioning unit with enclosure in rear garden
Date received: 09 Oct 2023
Registration date:
(Statutory start date)
09 Oct 2023
Public consultation ends: 24 Nov 2023
Application status: Decided
Target date for decision: 04 Dec 2023

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 22 Apr 2024
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Code of Construction Practice No development shall commence until: An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition. Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

4)

Arboricultural Impact Assessment - Compliance The development shall be carried out in accordance with the approved Arboricultural Impact Assessment, prepared by Simon Pryce Arboriculture dated 12 August 2023, and shall be so maintained.
Reason - To ensure the proposals have an acceptable impact on trees in the Borough, in accordance with policy CR6 of the Local Plan 2019.

5)

Noise from building services plant and vents Noise emitted by all building services plant shall be -10dBA below the existing measured lowest LA90(15min) background noise level at any time when all plant is in use, where the plant noise source is tonal it shall be -15dBA. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential window or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The equipment shall be serviced regularly in accordance with manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is unable to comply with this Condition, it shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.

6)

Anti-vibration mounts for air-conditioning/ extraction equipment The plant shall not operate unless it is supported on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.

7)

Noise mitigation measures compliance In order to comply with condition 5, the noise mitigation measures, of the performance and specification as described in the Noise Impact Assessment (prepared by Clement Acoustics Limited, dated 1st August 2022 Ref: 17734-NIA-01_RevA) shall be adopted and implemented in full.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.

Informatives:

1)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

2)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

3)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Sarah Winter-Irving
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/23/06538