Property details

Case reference: LB/23/08118
Address: 1 Cheyne Mews, LONDON, SW3 5RH
Ward: Chelsea Riverside
Polling district: 04
Listed Building Grade:
Conservation area: Cheyne

Applicant details

Applicant's name: Tetra Tech
Applicant company name: ADL Planning Pty Ltd
Contact address: 1 The Arbory Plumpton Lane Great Plumpton PR4 3NH

Proposal details

Application type: LB (Listed Building)
Proposed development Redesigning of property involving internal reconfiguration, partial demolition, and extensions to rear ground, first and second floors
Date received: 06 Dec 2023
Registration date:
(Statutory start date)
18 Dec 2023
Public consultation ends: 26 Jan 2024
Application status: Decided
Target date for decision: 12 Feb 2024

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 12 Apr 2024
Conditions and reasons:

1)

Time limit The works hereby granted shall be begun before the expiration of three years from the date of this consent.
Reason - As required by Section 18 of the Planning (Listed Buildings and Conservation Areas Act) 1990, to avoid the accumulation of consents.

2)

Compliance with drawings The works forming the subject of this consent shall not be carried out except in complete accordance with the details shown on submitted plans and shall be so maintained.
Reason - In order to safeguard the special architectural or historic interest and heritage significance of the building .

Informatives:

1)

Listed Building Reminder on Enforcement
You are reminded that no work should commence on implementing this Listed Building Consent until all matters, samples, and details reserved by condition have been submitted to, and approved by, this local planning authority. It is an offence to carry out work to a Listed Building unless all such conditions have been complied with. Any proposed departure from the works specified in the approved drawings should be brought to the attention of the planning department for further consideration before the work is carried out. The Council will use its enforcement powers, including use of Breach of Condition Notices or Prosecution, to ensure compliance with conditions and prevent harm to the special historic character and historic interest of Listed Buildings. You are advised that there is currently a maximum fine of o20,000 if the offence is dealt with summarily, and if the offence is dealt with by indictment the fine is unlimited.

2)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

3)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

4)

Construction Management - Highways Act
You are reminded that, if not properly managed, construction works can lead to significant negative impacts on the local environment, reducing residential amenity and the safe function of the highway. No vehicles associated with the building operations on the development site shall be parked on the public highway so as to cause an obstruction. Any such wilful obstruction is an offence under Section 137 of the Highways Act 1980. The Council can prosecute developers and their contractors if work is not managed properly. For advice on how to manage construction works in the Royal Borough please see Advice for Builders on the Council's website; from this page you will also find guidance on what to include in Construction Traffic Management Plans (where these are required) which are very valuable instruments in limiting the impact of large scale building work.

5)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:09 Apr 2024
Venue:The Council Chamber
Report item number:S38

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Charlotte O'Farrell
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012