Proposed development
|
Reconfiguration of internal layout at first floor; replacement of non-original flooring with engineered timber on part of ground floor, and with floating engineered timber or tile flooring on first floor; replacement of tiling in bathrooms; exposure of original cornicing, and installation of matching cornicing in areas where cornicing has been lost; replacement of non-original wardrobes and joinery; installation of fireplaces; replacement of all bathrooms and kitchen; replacement of electrical, plumbing and heating services; repair and full redecoration throughout
|