1)
Time Limit
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.
2)
Compliance with approved drawings
The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.
3)
Submission of details (Full PP)
No development shall commence until full particulars of the following have been submitted to and approved in writing by the local planning authority and the development shall not be completed otherwise than in accordance with the details so approved:
(a) Materials to be used on the external faces of the building, including sample of new shopfront framing and brickwork to infill;
(b) Sample panel of facing brick slips to rear flues, enclosures and ductwork showing the proposed colour, texture, facebond and pointing;
(c) Detail of new shopfront, including a section, at a scale of 1:10.
(d) Sample of the railings;
(d) New external door to rear courtyard at a scale of 1:10.
Reason - To accord with the development plan by ensuring that the character and appearance of the area are preserved and living conditions of those living near the development suitably protected. It is necessary for the condition to be on the basis that 'No development shall commence until' as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.
4)
Materials - To match existing
All work and work of making good shall be finished to match the existing exterior of the building(s) in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.
5)
Vehicle crossover
No part of the building/extensions hereby permitted shall be occupied until the existing crossover to the Sedding Street has been removed, the footway in front of the site has been reinstated in materials matching those of the existing footway.
Reason - To maintain the quality of the footway, to protect the Borough's streetscape in accordance with CT1 (g) & CR4 (a)(g).
6)
Noise from building services plant and vents
Noise emitted by all building services plant including from atmospheric vents shall be -10dBA below the existing measured lowest LA90(15min) background noise level at any time when all plant is in use, where the plant noise source is tonal it shall be -15dBA. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential window or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The equipment shall be serviced regularly in accordance with manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is unable to comply with this Condition, it shall be switched off and not used again until it is able to comply.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
7)
Anti-vibration mounts for air-conditioning/ extraction equipment
All building services plant located externally within the development shall be supported on adequate proprietary anti-vibration mounts as necessary to prevent the transmission of vibration and regenerated noise to within adjacent parts of the proposed building(s) and these shall be so maintained thereafter.
Reason - To prevent any significant disturbance to residents of nearby properties and comply with development plan policies, in particular policy CL5 of the Local Plan 2019.
8)
Level access to shop
The shopfront shall include level access from the pavement to the interior, with no step at the entrance door.
Reason - To ensure accessibility to people with mobility difficulties and so accord with policies of the development plan, in particular CL2 (o) of the Local Plan 2019.
9)
Code of Construction Practice
No development shall commence until:
An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council's Construction Management Team, and then
B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record.
The development shall be carried out in accordance with the Appendix A Checklist and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Note - The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected]
or tel: 020 7361 3002
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.