Property details

Case reference: PP/20/00051
Address: 5-6 Durham Place, LONDON, SW3 4ET
Ward: Royal Hospital
Polling district: 16
Listed Building Grade:
Conservation area: Royal Hospital

Applicant details

Applicant's name: Forman
Applicant company name: Montagu Evans
Contact address: 5 Bolton Street London W1J 8BA

Proposal details

Application type: PP (Planning permission)
Proposed development Replacement of lower ground floor rear extension; lowering of floor slab at lower ground floor; excavation of basement storey under property and extension; replacement of two windows at ground floor with timber door set; replacement of window and door at front light well; and internal refurbishment
Date received: 23 Dec 2019
Registration date:
(Statutory start date)
23 Dec 2019
Public consultation ends: 31 Jan 2020
Application status: Decided
Target date for decision: 17 Feb 2020

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 30 Apr 2020
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Trees - lopping and topping For the duration of works the trees existing on the site at the date of this permission shall be protected so as to prevent damage above and below ground, and no tree shall be lopped, topped, or felled, or root pruned, without the prior written approval of the local planning authority.
Reason - To ensure that the trees are adequately protected, to safeguard their contribution to theÿappearance and amenity of the area and accord with policies of the development plan, in particular policy CR6 of the Local Plan 2019.

4)

Contamination - Unexpected If during development, contamination not previously identified is found to be present at the site, development work shall cease and not be recommenced until a report indicating the nature of the contamination and how it is to be dealt with has been submitted to, and approved in writing by, the local planning authority.ÿThe approved measures shall be implemented in full.
Reason - To ensure any risks from land contamination are minimised, and comply with the NPPF and development plan policies, in particular policy CE7 of the Local Plan 2019, and to accord withÿ CLR 11: Model Procedures for the Management of Land Contamination (Defra 2004) or the current UK requirements for sampling and testing).

5)

Black painted railings The railings to the roof terrace and garden stairs shall be painted black, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL6 of the of the Local Plan 2019.

6)

Materials - To match existing All work and work of making good shall be finished to match the existing exterior of the building in respect of materials, colour, texture, profile and, in the case of brickwork, facebond and pointing, and shall be so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area in accordance with policies of the development plan in particular policies CL1, CL2, CL3 and CL6 of the Local Plan 2019.

7)

Conservation skylights The skylights to the terrace roof shall be of a traditional conservation type, flush with the floor and slim framed, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, and CL2 of the Local Plan 2019.

8)

Construction Traffic Management Plan (CTMP) No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the Planning Applications Committee of the local planning authority. The statement should include: a) routeing of demolition, excavation and construction vehicles, including a response to existing or known projected major building works at other sites in the vicinity and local works in the highway; b) access arrangements to the site; c) the estimated number and type of vehicles per day/week; d) details of any vehicle holding area; e) details of the vehicle call up procedure; f) estimates for the number and type of parking suspensions that will be required; g) details of any diversion or other disruption to the public highway during preparation, demolition, excavation and construction work associated with the development; h) work programme and/or timescale for each phase of preparation, demolition, excavation and construction work associated with the development; i) details of measures to protect pedestrians and other highway users from construction activities on the highway; and j) where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, position of nearby trees in the highway or adjacent gardens, pedestrian routes, parking bay suspensions and remaining road width for vehicle movements. The development shall be carried out in accordance with the approved Construction Traffic Management Plan. A one page summary of the requirements of the approved CTMP shall be affixed to the frontage of the site for the duration of the works at a location where it can be read by members of the public.
Reason - To minimise the impact of construction works upon highway safety and nearby residents' enjoyment of their properties in accordance with the Basements SPD and policies CL7, CT1 and CL5 of the Local Plan 2019.ÿ It is ne

9)

Professional management of engineering works No development shall commence until (A) a Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E)ÿhas been appointed for the duration of building works and their appointment confirmed in writing to the Local Planning Authority, and (B) the name, and contact details of the person supervising engineering and construction on site for the duration of building works have been confirmed in writing to the Local Planning Authority.ÿ In the event that either the Appointed Engineer or Appointed Supervisor cease to perform that role for whatever reason before the construction works are completed, those works shall cease until a replacement chartered engineer of the afore-described qualification or replacement supervisor has been appointed to supervise their completion and their appointment confirmed in writing to the Local Planning Authority. At no time shall any construction work take place unless an engineer and supervisor are at that time currently appointed and their appointment has been notified to this Authority in accordance with this condition.
Reason - The details are considered to be material to the acceptability of the proposal, and for safeguarding the amenity of neighbouring residential properties and to comply with the Basements SPD and policy CL7 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan

10)

Considerate Constructors Scheme (CCS) No development shall commence until such time as the lead contractor, or the site, is signed to the Considerate Constructors Scheme (CCS) and its published Code of Considerate Practice, and the details of (i) the membership, (ii) contact details, (iii) working hours as stipulated under the Control of Pollution Act 1974, and (iv) Certificate of Compliance, are clearly displayed on the site so that they can be easily read by passing members of the public, and shall thereafter be maintained on display throughout the duration of the works forming the subject of this permission.
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements SPD and policy CL5 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Development Plan.

11)

Code of Construction Practice No development shall commence until: A Code of Construction Checklist and Site Construction Management Plan (SCMP) for the development have been approved, in writing, by the Council's Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. [The Council's Construction Management Team work independently of the planning department. For further information regarding the Code and how the required details should be submitted to them, the Council's Construction Management Team can be contactedÿon email at:ÿ[email protected] or tel: 020 7361 3002]ÿ
Reason - To mitigate the impact of construction work upon the levels of amenity that neighbouring occupiers should reasonably expect to enjoy, and to comply with the Basements and Transport and Streets SPDs and policies CL5, CT1, CE5 and CE6 of the Local Plan 2019. It is necessary for the condition to be on the basis that "No development shall commence until" as compliance with the requirements of the condition at a later time would result in unacceptable harm contrary to the policies of the Local Plan 2019.

12)

Sustainable Drainage Systems (SuDS) details No development shall commence until a SuDS strategy with the following information has been submitted to and approved in writing by the Local Planning Authority: A detailed analysis of surface water run-off and attenuation volume required by policy CE2 (g) (to achieve a reduction of 50% of existing rates including climate change in the calculations and factoring in all flows into the sewer system including groundwater or other flows); Information about the proposed SuDS types, their location, attenuation capacity, specification, structural integrity, construction, operation, access, and maintenance. (More sustainable green SuDS should be favoured over attenuation tanks); Section/profile drawings of the SuDS if relevant (green roofs, blue roofs, sub-base attenuation, permeable paving, planters, species, etc.); and Drainage plans to show clearly how surface water run-off will be conveyed to the SuDS and any connections to the sewer system if necessary. The approved SuDS shall be fully implemented prior to the first use of the basement once the development is complete, made fully functional at all times, and maintained thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Consolidated Local Plan.

13)

Positive pumped device The basement shall not be occupied until a suitable pumped device to protect the basement from sewer flooding has been installed and made available for use and shall be maintained as approved thereafter.
Reason - To reduce flood risk and to contribute to sustainability in accordance with policy CE2 of the Local Plan 2019.

14)

Sash windows in painted timber The window on the front elevation hereby permitted shall be a timber framed, white painted, double hung, sliding sash, and so maintained.
Reason - To preserve or enhance the appearance of the building and/or the character of the area, in accordance with policies of the development plan in particular policies CL1, CL2 and CL3 of the Local Plan 2019.

Informatives:

1)

Unique text
For the purposes of preparing your final CTMP under Condition 8, you are reminded of the importance of demonstrating how you have taken account of, and will continue to co-ordinate with, any other CTMPs or building sites operative in the vicinity during the development period for this planning permission

2)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

3)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

4)

Conditions - Precedent to Commencement
Conditions no(s) 8, 9, 10, 11 and 12 impose requirements which must be met prior to commencement of the development. Failure to observe these requirements could result in the Council taking enforcement action, or may invalidate the planning permission and render the whole of the development unlawful.

5)

Care in the Conservation Area
This property is within a Conservation Area. All building works should, therefore, be completed with great care. External facing work and detailed treatment should be finished in a manner sympathetic to the existing building. If there is any doubt about the way in which work should be carried out, you should seek the advice of the Directorate of Planning and Place.

6)

Demolition (Ensure Stability)
You are advised of the importance to ensure that all works and measures necessary to stabilise and protect all parts of the building to be retained have been put in place before the consented demolition is commenced.

7)

Building Regs - Separate Approval
Separate approval for the works hereby granted permission/consent may be required by the Building Act 1984 and the Building Regulations 2000 (as amended), and the grant of planning permission does not imply that such approval will be given. The Director of Building Control, Town Hall, Hornton Street, W8 7NX should be consulted before works commence.

8)

Tree Protection in Conservation Areas
The site lies within a Conservation Area where the topping, lopping, felling or uprooting of most trees cannot be carried out without first giving the Local Planning Authority six weeks notice. Failure to comply with this statutory requirement may result in prosecution.

9)

Non-Return Valves
As required by Building regulations part H paragraph 2.36, Thames Water requests that the Applicant should incorporate within their proposal, protection to the property to prevent sewage flooding, by installing a positive pumped device (or equivalent reflecting technological advances), on the assumption that the sewerage network may surcharge to ground level during storm conditions. If as part of the basement development there is a proposal to discharge ground water to the public network, this would require a Groundwater Risk Management Permit from Thames Water. Any discharge made without a permit is deemed illegal and may result in prosecution under the provisions of the Water Industry Act 1991. We would expect the developer to demonstrate what measures will be undertaken to minimise groundwater discharges into the public sewer. Permit enquiries should be directed to Thames Water's Risk Management Team by telephoning 0203 577 9483 or by emailing [email protected]. Application forms should be completed on line via www.thameswater.co.uk. Please refer to the Wholsesale; Business customers; Groundwater discharges section.

10)

Floodline - Basements in Flood Zones1/2
You have been granted planning permission for a basement or extension to an existing basement. We strongly advise that you sign up to the free Flood Warning Direct service operated by the Environment Agency where you will receive a free warning by telephone, text or e-mail, by calling Floodline on 0845 988 1188 or going to Flood Warning Alerts

11)

Party Wall Act 1996
You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining property freeholders and leaseholders and anyone who has had an interest of 12 months or greater, where the building owner intends to carry out work which involves: Work involving an existing shared wall with another property; Building on the boundary with another property; Excavating near a neighbouring building, and that work falls within the scope of the Act Notice should be served on neighbours at least one month before commencement of building works. Section 12(1) of the Act provides for the developer to provide security for neighbours through insurance or a security bond. Procedures under this Act are separate from the need for planning permission and for building regulations approval. Further guidance is available at: Party Wall Act 1996

12)

Highways Technical Approval-Sep Approval
You are advised that Technical Approval in accordance with the Design Manual for Roads and Bridges BD2/12 will be required for any structural works/alterations/repairs to structures over, under or adjacent to the public highway.ÿThe procedures only grant approval under the Highways Act. The granting of planning permission and building consent does not imply that such approval is given. Please contact the Directorate of Transportation and Highways for advice on 020 7341 5220 or email [email protected].

13)

Advertisements Installed On Hoardings
Advertisements on hoardings constructed around the site need to meet the size and other requirements of Class 8 of the Town and Country Planning (Control of Advertisements) (England) Regulations 2007. Any outside of these requirements need advertisement consent granted by the Council.

14)

GTD/Pre-app/At submission Est.G/No amend
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website. A pre-application advice service is also offered. The scheme was submitted in accordance with advice provided through pre-application discussions.

15)

Unique text
For the purposes of preparing your final CTMP under Condition 8, you are reminded of the importance of demonstrating how you have taken account of, and will continue to co-ordinate with, any other CTMPs or building sites operative in the vicinity during the development period for this planning permission

Committee details

Decision by: This case is currently due to be decided by the Planning Applications Committee.
Date:28 Apr 2020
Time:18:30
Venue:Committee Room 1
Report item number:S29

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: Amy Williams
Planning team: South
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/20/00051