!DOCTYPE html> The Royal Borough of Kensington and Chelsea | Planning Search

Planning Search

Back to search results

Property details

Case reference: PP/24/00786
Address: 2 Devonshire Place, LONDON, W8 5UD
Ward: Abingdon
Polling district: 01
Listed Building Grade:
Conservation area: N/A

Applicant details

Applicant's name: A Nassar
Applicant company name: DC Planning
Contact address: 63 Anselm Road Fulham London SW6 1LH

Proposal details

Application type: PP (Planning permission)
Proposed development Installation of air conditioning unit within timber acoustic enclosure at ground level, in rear garden 1.0m from rear and side boundaries.
Date received: 06 Feb 2024
Registration date:
(Statutory start date)
12 Feb 2024
Public consultation ends: 08 Mar 2024
Application status: Decided
Target date for decision: 08 Apr 2024

Decision details

This case has not yet been decided.

Decision: Grant Planning Permission/Consent
Decision date: 08 Apr 2024
Conditions and reasons:

1)

Time Limit The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - As required by Section 91 of the Town and Country Planning Act 1990, to avoid the accumulation of unexercised Planning Permissions.

2)

Compliance with approved drawings The development shall not be carried out except in complete accordance with the details shown on submitted plans
Reason - The details are material to the acceptability of the proposals, and to ensure accordance with the development plan.

3)

Noise from building services plant and vents Noise emitted by all building services plant including from atmospheric vents shall be -10dBA below the existing measured lowest LA90(15min) background noise level at any time when all plant is in use, where the plant noise source is tonal it shall be -15dBA. The noise emitted shall be measured or predicted at 1.0m from the facade of the nearest residential window or at 1.2m above any adjacent residential garden, terrace, balcony or patio. The equipment shall be serviced regularly in accordance with manufacturer's instructions and as necessary to ensure that the requirements of the condition are maintained. If at any time the plant is unable to comply with this Condition, it shall be switched off and not used again until it is able to comply.
Reason - To protect the amenities of residential occupiers.

4)

Anti-vibration mounts for air-conditioning/ extraction equipment All building services plant located externally within the development shall be supported on adequate proprietary anti-vibration mounts as necessary to prevent the transmission of vibration and regenerated noise to within adjacent parts of the proposed building(s) and these shall be so maintained thereafter.
Reason - To protect the amenities of residential occupiers.

Informatives:

1)

Enforcement of Conditions (PP)
Your attention is drawn to the Conditions of this Permission and to the Council's powers of enforcement, including the power to serve a Breach of Condition Notice under the Town and Country Planning Act 1990, as amended. All Conditions must be complied with. If you wish to seek to amend a Condition you should apply to do so under s.73 of the Act, explaining why you consider it is no longer necessary, or possible, to comply with a particular condition.

2)

Variations to Approved Drawings
Planning permission is hereby granted for the development as shown on the approved drawings. Any variation to the approved scheme may require further permission, and unauthorised variations may lay you open to planning enforcement action. You are advised to seek advice from the Directorate of Planning and Place, before work commences, if you are thinking of introducing any variations to the approved development. Advice should urgently be sought if a problem occurs during approved works, but it is clearly preferable to seek advice at as early a stage as possible. Use the following link to see how advice can be obtained: Planning Advice Service

3)

Category 3 development
This development has been categorised as Category 3 for the purposes of the Council's Code of Construction Practice, so does not require a condition securing a Checklist or Site Construction Management Plan (SCMP). You are reminded that the Code still applies to building works at the site with regard to working hours and other site practices, and you are advised to review the Code to be aware of its objectives https://www.rbkc.gov.uk/environment/code-construction-practice

4)

GTD/No pre-app/Est.Guid/No amend reqd
To assist applicants in finding solutions to problems arising in relation to their development proposals the Local Planning Authority has produced planning policies, and provided written guidance, all of which are available on the Council's website, and which has been followed in this instance.

Committee details

Decision by: This case is currently due to be decided under delegated powers.

Appeal details

This case has not been appealed.

Planning Inspectorate reference number:
Appeal received:
Appeal type:
Appeal procedure:
Appeal start date:
Deadline for comments to be received by the Planning Inspectorate:
Appeal decision:
Appeal decision date:

Contact details

Planning case officer: McKenzie Quigg
Planning team: North
Email: [email protected]
Telephone: 020 7361 3012

Comment on this application

The consultation period for this application has ended.

Documents related to case PP/24/00786